ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
0complaint received. Turnaround and parking space constructed next to the area of the break. These words are from an e-mail from the water bureau acknowledging that they build a large turnaround and parking spaces in an enviornmental protection zone with out permits and brought very large ,very heavy equipment into an enviornmental protection area without permits to repair the break (and the damage to the ada-accessible trail adjacent to the vivian parking lot). Also very rare butterfly habitat was destroyed . 5/7/15 additional complaint about fill in environmental zone without permits. Date: March 30, 2016Permit type: Request | Permit status: Closed | Completion date: September 17, 2015 | Permit id: 2015-156402-000 | |||||
0complaint received. Turnaround and parking space constructed next to the area of the break. These words are from an e-mail from the water bureau acknowledging that they build a large turnaround and parking spaces in an enviornmental protection zone with out permits and brought very large ,very heavy equipment into an enviornmental protection area without permits to repair the break (and the damage to the ada-accessible trail adjacent to the vivian parking lot). Also very rare butterfly habitat was destroyed . 5 7 15 additional complaint about fill in environmental zone without permits. Date: March 30, 2016Permit type: Request | Permit status: Closed | Completion date: September 17, 2015 | Permit id: 2015-156402-000 |