ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Remove existing 14 x 16 deck and replace w/ x 16 deck and 14 octagon-shaped gazebo. Theres a small bridge 4 x 5 connecting both deck and gazebo. Light fixture for gazebo. Zoning clearance: #10-0899. Setbacks: n (ex), e (ex), s 18, w (ex). Per b. A. 7/8/10. Date: July 8, 2010 Value: $30,000Client: Maggio, Tom | Permit id: Sfd20102091 | |||||
SCORE 56 Siding house and garage Permit id: Misc20101379 | |||||
Dumpster for days Date: November 18, 2010Client: Maggio, Tom | Permit id: Misc20101373 | |||||
SCORE 56 Dumpster for days Date: November 18, 2010 Contractor: Maggio TomClient: Maggio, Tom | Permit id: Misc20101373 | |||||
SCORE 56 Remove existing 14 x 16 deck and replace w/ x 16 deck and 14 octagon-shaped gazebo. Theres a small bridge 4 x 5 connecting both deck and gazebo. Light fixture for gazebo. Zoning clearance: #10-0899. Setbacks: n (ex), e (ex), s 18, w (ex). Per b. A. 7/8/10. Client: Maggio, Tom | Permit id: Sfd20102091 | |||||
SCORE 56 Dumpster for days Date: November 18, 2010 Contractor: Maggio, TomClient: Maggio, Tom | Permit id: Misc20101373 | |||||
SCORE 56 Remove existing 14 x 16 deck and replace w x 16 deck and 14 octagon-shaped gazebo. Theres a small bridge 4 x 5 connecting both deck and gazebo. Light fixture for gazebo. Zoning clearance: #10-0899. Setbacks: n (ex), e (ex), s 18, w (ex). Per b. A. 7 8 10. Client: Maggio, Tom | Permit id: Sfd20102091 |