New home on vacant lot Date: September 10, 2015 Value: $250,000Permit type: Building residential permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 639614 | |||||
100amp temporary pole service Date: October 30, 2015Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 734431 | |||||
Electrical permit Date: February 1, 2016Permit status: Issued | Current use: Single family dwelling | Permit id: 743288 | |||||
New home on vacant lot - heating/cooling equip & ductwork Date: January 5, 2016Permit type: Mechanical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 740260 | |||||
Construct one 1 1/2" water house connections in accordance with wssc plans and specifications. Work shall comply with montgomery county specifications for utility construction permit the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures and traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Xml:n Date: October 7, 2013Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 300843 | |||||
Installation of a 1 1/2" water house connectionin accordance with wssc plans and specifications. Work shall comply with montgomery county specifications for utility construction permit the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures and traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: March 30, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 351937 | |||||
Replace pole; install transformer, cable and associated equipment in accordance with pepco plan no. 3505816. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: June 21, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 352976 | |||||
Dw permit (residential) construct mc-301. 03 type driveway in accordance with montgomery county standards and specifications. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Md dnr permit and mc dot highway serivces tree
|