ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Install (1) new water bond within (5) feet of the entrance to,the building and bond to the main electrical panel. Install a bonding jumper between hot and cold water piping. Install (1) new romex connector above the sub panel. Install (1) new ground bar in the sub electrical panel. 5. Terminate the ground wires to the new ground bar. Add panel schedule to identify all the circuit breakers. Install (6) new single receptacles for the a/c units. Install a amp circuit breaker for the sub feed to the office. Date: May 9, 2016Client: Austin Stephen D Tr Et Al | Permit type: Electrical | Permit status: Issued | Permit id: 16cp01274 | |||||
Installation of a 1 amp overhead electrical meter main service panel. Date: March 9, 2016Client: Austin Stephen D Tr Et Al | Permit type: Electrical | Permit status: Issued | Permit id: 16cp00629 | |||||
Install (1) new water bond within (5) feet of the entrance to,the building and bond to the main electrical panel. Install a bonding jumper between hot and cold water piping. Install (1) new romex connector above the sub panel. Install (1) new ground bar in the sub electrical panel. 5. Terminate the ground wires to the new ground bar. Add panel schedule to identify all the circuit breakers. Install (6) new single receptacles for the a c units. Install a amp circuit breaker for the sub feed to the office. Date: May 9, 2016Client: Austin Stephen D Tr Et Al | Permit type: Electrical | Permit status: Issued | Permit id: 16cp01274 |