ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 89 Roof mount residential solar pv for existing sfd no. Of modules: 39 no. Of inverters: 2 total system size in kilowatts: 9. 4 electrical service upgrade to 225 amps 6-14-2012 plan change removed load center inverters feed directly to individual 25 amp two pull breakers in main panel vam per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: May 30, 2012 Contractor: Peter S RivePermit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: June 28, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 95 Roof mount residential solar pv for existing sfd no. Of modules 39 no. Of inverters 2 total system size in kilowatts 9. 4 electrical service upgrade to 225 amps 6-14-2012 plan change removed load center inverters feed directly to individual 25 amp two pull breakers in main panel vam per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: May 30, 2012 Contractor: Solarcity CorporationPermit type: Residential alteration-addn | Permit status: Completed | Completion date: June 28, 2012 | Permit id: Pds2012-1031-20 | |||||
Final Date: June 26, 2012Permit status: Pass | Permit id: Pds2012-1031-20 |