ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Install an 8inch sewer house connection of peach orchard road as show on the plan. Restore right of way. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. . Permit type: Public right of way | Permit status: Open | Current use: Public utility | Permit id: 211503 | |||||
>>> pre-construction meeting required >> pre-construction meeting required > pre-construction meeting required pre-construction meeting required <<< contact mc. Dps inspector charlie lawson @ 301-370-36887 install 8" sewer connection in peach orchard road to serve property at 15618 peach orchard road. All work must be in accordance with the approved plans and montgomery countys "20 specifications for utility construction permit", the montgomery county specifications for "utility patch standard and specifications" dated january, 20 and specific traffic notes provided for this site and as directed by the mcdps inspector in the field. Date: April 2, 2003Permit type: Public right of way | Permit status: Completed | Current use: Public utility | Permit id: 220770 |