ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
>>> pre-construction meeting required >> pre-construction meeting required > pre-construction meeting required pre-construction meeting required <<< contact mc. Dps inspector charles lawson @ 301-370-3687. Renew existing 35 pole (#127865) with a new 45 pole. Install a 900kvar capactive bank. Utility pole(s) to be replaced or relocated shall be placed at the property line or to the maximum distance from the roadway. Minimum distances are: six feet (6") behind curb and gutter on closed section roadways. Three feet (3) behind invert of ditch on open section roadways or a minimum of twelve feet (12) from the edge of pavement, whichever is greater. Utility representative: roshann steele @ 410-859-9405 Date: May 21, 2003Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 221696 |