| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Use premises as a with a casino approximately 309 4 sq ft comprising of 3 seperate floors built for entertainment purposes lower two floors are casino(video lottery terminal facility) now with flood plainvariance fom the planning commission meeting and Date: October 16, 2015Permit id: Use2015-03303 | |||||
Ansul ul 3 hood suppression system as per plans as per code. Date: September 25, 2015 Value: $3,170Permit id: Com2015-11972 | |||||
Use portion of horseshoe casino as a restaurant/bar guys bbq jointawc per planning - floodplain installations in progress. Must be completed in full by april 2015 and have final inspection with floodplain manager before april 2015 or permit will b Date: March 23, 2015Permit id: Use2015-00984 | |||||
Use portion of existing restaurant guys baltimore kitchen at the horseshoe casino for catering Date: March 20, 2015Permit id: Use2015-00985 | |||||
At mallow bar supply and install amp circuit at 208 volts for equipment. Install new amp circuit to stream table as per code Date: March 3, 2015 Value: $3,000Permit id: Com2015-04388 | |||||
Install kitchen fire suppression system as per plans and as per code. Date: August 8, 2014 Value: $3,200Permit id: Com2014-10791 | |||||
(use) use premises as a casino with accessory restaurants/bars: mallow bar (#c137 c144) lennys delicatessen (#c143) mama ilardos (#c142) tarks (#c139) heavy seas (#c140) yard bar (#c141) guy fieri (#c134 #c135 #c136) johnny sanchez (#c256 #c25 Date: August 7, 2014Permit id: Use2014-02742 | |||||
Install ansul r102 ul3 wet chemical kitchen hood suppression systems (for the level 3 main kitchen level steakhouse tarks seafood heavy seas johnny sanchez guy fieri level 2 noodle bar and lennys delicatessen) as per plans and as per code. Date: July 16, 2014 Value: $50,119Permit id: Com2014-13251 | |||||
" install one 26 high x 1410"" above grade (24 below grade) length x 4 above grade (8 below grade) width sign to include mep imaging"" as per plans and as per code." Date: July 3, 2014 Value: $300,000Permit id: Com2014-11323 | |||||
Install new combined heat and power (chp) system as per plans and as per code. Date: June 17, 2014 Value: $3,125,000Permit id: Com2014-08534 | |||||
Original permit description:(com2013-20826)interior fit out of existing casino building (for area on level 2 for johnny sanchez restaurant) as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Date: June 9, 2014Permit id: Com2014-11956 | |||||
Original permit description:(com2013-20825)interior fit out of existing casino building for tenant space (for new guy fieri restaurant) as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Date: June 9, 2014Permit id: Com2014-11958 | |||||
Original permit description:(com2013-20822)interior fit out in existing casino building ( area known as feature bar on the 1st level mezzanine and 2nd level.) as per plans and as per code. Separate permit will be required for sprinkler system and fire al Date: June 9, 2014Permit id: Com2014-11959 | |||||
Original permit description:(com2014-01663)tenant fit out to existing building space (for use as a bar) as per plans and as per code. If altering either sprinkler or fire alarm systems separate permits are required. Date: June 9, 2014Permit id: Com2014-11960 | |||||
"original permit description:(com2014-01664)tenant fit out of existing building space (for restaurant) as per plans and as per code. If altering either sprinkler or fire alarm systems separate permits are required. C/o ""required on a seperate form upon co" Date: June 9, 2014Permit id: Com2014-11962 | |||||
Original permit description:(com2014-01659)interior fit out of existing space (for restaurant) as per plans and as per code. If altering either sprinkler or fire alarm systems separate permits are required. Date: June 9, 2014Permit id: Com2014-11966 | |||||
Original permit description:(com2014-01665)interior fit out to existing building (for deli / restaurant) as per plans and as per code. If altering either sprinkler or fire alarm systems separate permits are required. C/o required on a seperate form upon Date: June 9, 2014Permit id: Com2014-11968 | |||||
Original permit description:(com2013-20821)interior fit out of 3rd floor of existing casino building as per plans as per code. Separate permit will be required for sprinkler system and fire alaram. Date: June 3, 2014Permit id: Com2014-11499 | |||||
Original permit description:(com2013-25815)tenant fit out (for mamma illardos restaurant) as per plans and as per code. Date: May 8, 2014Permit id: Com2014-09612 | |||||
Install new direction sign and foundation on premises as per plans and as per code. Date: April 30, 2014 Value: $10,000Permit id: Com2013-24083 | |||||
Interior fit out of existing casino building for tenant space (for new guy fieri restaurant) as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Date: April 22, 2014 Value: $3,100,000Permit id: Com2013-20825 | |||||
Interior fit out of existing casino building (for area on level 2 for johnny sanchez restaurant) as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Date: April 22, 2014 Value: $2,900,000Permit id: Com2013-20826 | |||||
Interior fit out in existing casino building ( area known as feature bar on the 1st level mezzanine and 2nd level.) as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Date: April 22, 2014 Value: $2,100,000Permit id: Com2013-20822 | |||||
"interior fit out to existing building (for deli / restaurant) as per plans and as per code. If altering either sprinkler or fire alarm systems separate permits are required. C/o required on a seperate form upon completion "" the mallow bar crunchies dese" Date: April 22, 2014 Value: $717,304Permit id: Com2014-01665 | |||||
Interior fit out of existing space (for restaurant) as per plans and as per code. If altering either sprinkler or fire alarm systems separate permits are required. Date: March 26, 2014 Value: $837,601Permit id: Com2014-01659 | |||||
Tenant fit out to existing building space (for use as a bar) as per plans and as per code. If altering either sprinkler or fire alarm systems separate permits are required. Date: March 26, 2014 Value: $748,013Permit id: Com2014-01663 | |||||
"tenant fit out of existing building space (for restaurant) as per plans and as per code. If altering either sprinkler or fire alarm systems separate permits are required. C/o ""required on a seperate form upon completion"" heavy seas burgers""" Date: March 26, 2014 Value: $895,184Permit id: Com2014-01664 | |||||
Tenant fit out (for mamma illardos restaurant) as per plans and as per code. Date: March 18, 2014 Value: $130,000Permit id: Com2013-25815 | |||||
Install sprinkler system (levels 2 and 3 of the casino. Level 1 has already been submitted) as per plans and as per code Date: February 19, 2014 Value: $200,000Permit id: Com2013-23047 | |||||
Install sprinkler sytem on level 1 install standpipes in four stairs install 1 diesel fire pump as per plans and as per code. Date: February 19, 2014 Value: $1,300,000Permit id: Com2013-21169 | |||||
Interior fit out of 3rd floor of existing casino building as per plans as per code. Separate permit will be required for sprinkler system and fire alaram. Date: February 14, 2014 Value: $9,100,000Permit id: Com2013-20821 | |||||
Second floor fit out of existing casino building to include noodle bar. (will not include poker bar electronic table games feature bar or johnny sanchez restaurant as these will be permitted separately) as per plans as per code. Separate permit will b Date: January 21, 2014 Value: $23,000,075Permit id: Com2013-20819 | |||||
Interior fit out to existing first floor space of newly constructed casino building. (fit out not to include guy fieri restaurant and feature bar. Gf restaurant and fb to be permitted separately) as per plans as per code. Separate permit will be required Date: January 21, 2014 Value: $22,100,000Permit id: Com2013-20817 | |||||
Amend plans# 2012-2143 to include underground plumbing connections for sanitary ventilation and grease waste to service casino marketplace tenants. Date: November 19, 2013 Value: $10,000Permit id: Com2013-22378 | |||||
Construction of a new casino per bmza 2013-00016 approved may 23 2013 as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Date: August 14, 2013 Value: $47,474,531Permit id: Com2012-24199 | |||||
Partial permit subject to all conditions of agreement to do footing and foundation underground utilities pending action on application for plan #2012-2143 the issuance of the general permit and the understanding that the engineer/architect willcomply Date: May 24, 2013 Value: $466,000Permit id: Com2013-10581 | |||||
Complete the removal of ten (10) underground fuel tanks; (1) 300-gallon (2) 1 000-gallon (2) 3 000-gallon (1) 4 000-gallon (3) 5 000-gallon (1) 000-gallon and backfill with crushed #57 stone as per code. Floodplain - no change in the grade (i. E. No Date: April 23, 2013 Value: $20,000Permit id: Com2013-07661 | |||||
Excavate and grade existing site to remove all existing slab and infill with dirt as per plans and as per code. Date: March 6, 2013 Value: $60,000Permit id: Com2012-24075 | |||||
Complete the removal of ten (10) underground fuel tanks; (1) 300-gallon (2) 1 000-gallon (2) 3 000-gallon (1) 4 000-gallon (3) 5 000-gallon (1) 000-gallon and backfill with crushed #57 stone as per code. Floodplain - no change in the grade (i. E. No placing a mound on the property) Date: April 23, 2013 Value: $20,000Expiration date: October 23, 2013 | Permit id: Com2013-07661 | |||||
Partial permit subject to all conditions of agreement to do footing and foundation underground utilities pending action on application for plan #2012-2143 the issuance of the general permit and the understanding that the engineer/architect willcomply with the baltimore city building fire and related code - 2011. Date: May 24, 2013 Value: $466,000Expiration date: May 24, 2014 | Permit id: Com2013-10581 | |||||
Interior fit out to existing first floor space of newly constructed casino building. (fit out not to include guy fieri restaurant and feature bar. Gf restaurant and fb to be permitted separately) as per plans as per code. Separate permit will be required for sprinkler system and fire alaram. Date: January 21, 2014 Value: $22,100,000Expiration date: January 21, 2015 | Permit id: Com2013-20817 | |||||
Second floor fit out of existing casino building to include noodle bar. (will not include poker bar electronic table games feature bar or johnny sanchez restaurant as these will be permitted separately) as per plans as per code. Separate permit will be required for sprinkler system and fire alaram. Date: January 21, 2014 Value: $23,000,075Expiration date: January 21, 2015 | Permit id: Com2013-20819 | |||||
Interior fit out to existing building (for deli / restaurant) as per plans and as per code. If altering either sprinkler or fire alarm systems separate permits are required. C/o required on a seperate form upon completion " the mallow bar crunchies desert cafe" Date: April 22, 2014 Value: $717,304Expiration date: April 22, 2016 | Permit id: Com2014-01665 | |||||
Tenant fit out of existing building space (for restaurant) as per plans and as per code. If altering either sprinkler or fire alarm systems separate permits are required. C/o "required on a seperate form upon completion" heavy seas burgers" Date: March 26, 2014 Value: $895,184Expiration date: September 26, 2016 | Permit id: Com2014-01664 | |||||
Install one 26 high x 1410" above grade (24 below grade) length x 4 above grade (8 below grade) width sign to include mep imaging" as per plans and as per code. Date: July 3, 2014 Value: $300,000Expiration date: July 3, 2015 | Permit id: Com2014-11323 | |||||
Original permit description:(com2014-01665)interior fit out to existing building (for deli / restaurant) as per plans and as per code. If altering either sprinkler or fire alarm systems separate permits are required. C/o required on a seperate form upon completion " the mallow bar crunchies desert cafe" Date: June 3, 2014Expiration date: April 22, 2016 | Permit id: Com2014-11497 | |||||
Original permit description:(com2013-20822)interior fit out in existing casino building ( area known as feature bar on the 1st level mezzanine and 2nd level.) as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Date: June 3, 2014Expiration date: April 10, 2016 | Permit id: Com2014-11502 | |||||
Original permit description:(com2014-01664)tenant fit out of existing building space (for restaurant) as per plans and as per code. If altering either sprinkler or fire alarm systems separate permits are required. C/o "required on a seperate form upon completion" heavy seas burgers" Date: June 3, 2014Expiration date: September 26, 2016 | Permit id: Com2014-11510 | |||||
(use) use premises as a casino with accessory restaurants/bars: mallow bar (#c137 c144) lennys delicatessen (#c143) mama ilardos (#c142) tarks (#c139) heavy seas (#c140) yard bar (#c141) guy fieri (#c134 #c135 #c136) johnny sanchez (#c256 #c257 #c230) noodle bar (#c221 #c261) service bar (#c114b #c131 #c202 #c2 #c226)awc per plannning: this is a conditional occupancy permit only! Property owner will complete improvements to provide dry floodproofing to all electrical distribution panels and equipment to four feet above base flood elevation (bfe) by march 15 2015. Property owner is responsible for all floodproofing certificates elevation certificates and engineering or architectural certifications required to guarantee flood proofing. Property owner accepts all risk and liability associated with maintaining electrical distribution equipment at current identified elevations until dry floodproofing improvements are completed and approved. Date: August 7, 2014Permit id: Use2014-02742 | |||||
Use portion of horseshoe casino as a restaurant/bar guys bbq jointawc per planning - floodplain installations in progress. Must be completed in full by april 2015 and have final inspection with floodplain manager before april 2015 or permit will be revoked. Date: March 23, 2015Permit id: Use2015-00984 | |||||
Use premises as a with a casino approximately 309 4 sq ft comprising of 3 seperate floors built for entertainment purposes lower two floors are casino(video lottery terminal facility) now with flood plainvariance fom the planning commission meeting and restaurant space top floor will consist of offices kitchen and cafeteria Date: October 16, 2015Permit id: Use2015-03303 | |||||
Build 2 self-serve beverage stations; taking space away from existing service bars. New wall will be constructed to create alcoves for the soda fountain 2 alcoves totals sf wall will be built in an open area on the casino floor to create a cash center it will house atms and redemption machines in alcoves a storage area is created behind the machines (to store chairs and tables for the adjacent meeting space) area of construction 245 sf; existing first floor six 6 cage windows will be altered to have two 2 cage windows and 6 promotions windows; the office area behind the cage will be converted to storage space for promotional materials construction area 13 sf total area of alteration is 1 635 sf as per plans as per code. Date: November 4, 2016 Value: $20,000Expiration date: May 4, 2017 | Permit id: Com2016-17820 | |||||
Install one single phase 120/208 amp circuit to new vallett booth in parking garage. Install on 1" pathway for low voltage cabling as per code. Date: November 23, 2016 Value: $6,000Expiration date: May 23, 2017 | Permit id: Com2016-29935 | |||||
Install four (4) 1 volt amp circuits for gaming machines as per code. Date: September 27, 2016 Value: $2,500Expiration date: March 27, 2017 | Permit id: Com2016-24749 | |||||
Testing and certification of (9) back flow preventors: (3) 1" (1) 3" (3) 4" & (2) 6" at the casino as per code. Date: October 3, 2016 Value: $550Expiration date: April 3, 2017 | Permit id: Com2016-23960 | |||||
Amend permit: add contractor .(original permit:com2016-17820:build 2 self-serve beverage stations; taking space away from existing service bars. New wall will be constructed to create alcoves for the soda fountain 2 alcoves totals sf wall will be built in an open area on the casino floor to create a cash center it will house atms and redemption machines in alcoves a storage area is created behind the machines (to store chairs and tables for the adjacent meeting space) area of construction 245 sf; existing first floor six 6 cage windows will be altered to have two 2 cage windows and 6 promotions windows; the office area behind the cage will be converted to storage space for promotional materials construction area 13 sf total area of alteration is 1 635 sf as per plans as per code.)original permit description:(com2016-17820)build 2 self-serve beverage stations; taking space away from existing service bars. New wall will be constructed to create alcoves for the soda fountain 2 alcoves tot Date: November 22, 2016Expiration date: May 4, 2017 | Permit id: Com2016-29713 | |||||
Amend permit: add contractor .(original permit:com2016-25844:install pre-fabricated trailer (modular building) with 2 hours rating inside the existing horseshoe casino garage for dealer training space as per plans as per code.)original permit description:(com2016-25844)install pre-fabricated trailer (modular building) with 2 hours rating inside the existing horseshoe casino garage for dealer training space as per plans as per code. Date: November 22, 2016Expiration date: November 18, 2017 | Permit id: Com2016-29708 | |||||
Amend permit com2016-178 issued on 11/04/16 with plans #2016-1573 to add electrical contractor as listed above.(original permit:com2016-17820:build 2 self-serve beverage stations; taking space away from existing service bars. New wall will be constructed to create alcoves for the soda fountain 2 alcoves totals sf wall will be built in an open area on the casino floor to create a cash center it will house atms and redemption machines in alcoves a storage area is created behind the machines (to store chairs and tables for the adjacent meeting space) area of construction 245 sf; existing first floor six 6 cage windows will be altered to have two 2 cage windows and 6 promotions windows; the office area behind the cage will be converted to storage space for promotional materials construction area 13 sf total area of alteration is 1 635 sf as per plans as per code.)original permit description:(com2016-17820)build 2 self-serve beverage stations; taking space away from existing service bars. N Date: November 23, 2016Expiration date: May 4, 2017 | Permit id: Com2016-29948 | |||||
Amend permit com2016-25844 issued on 11/18/16 with plans #2016-2293 to add electrical contractor as listed above.(original permit:com2016-25844:install pre-fabricated trailer (modular building) with 2 hours rating inside the existing horseshoe casino garage for dealer training space as per plans as per code.)original permit description:(com2016-25844)install pre-fabricated trailer (modular building) with 2 hours rating inside the existing horseshoe casino garage for dealer training space as per plans as per code. Date: November 23, 2016Expiration date: November 18, 2017 | Permit id: Com2016-29942 | |||||
Install pre-fabricated trailer (modular building) with 2 hours rating inside the existing horseshoe casino garage for dealer training space as per plans as per code. Date: November 18, 2016 Value: $120,000Expiration date: November 18, 2017 | Permit id: Com2016-25844 | |||||
Install one single phase 120 208 amp circuit to new vallett booth in parking garage. Install on 1" pathway for low voltage cabling as per code. Date: November 23, 2016 Value: $6,000Expiration date: May 23, 2017 | Permit id: Com2016-29935 | |||||
Add 1 v receptacles in market place bathrooms and evs office as per code Date: February 1, 2017 Value: $3,000Expiration date: August 1, 2017 | Permit id: Com2017-02259 | |||||
(use) use premises as a casino with accessory restaurants bars: mallow bar (#c137 c144) lennys delicatessen (#c143) mama ilardos (#c142) tarks (#c139) heavy seas (#c140) yard bar (#c141) guy fieri (#c134 #c135 #c136) johnny sanchez (#c256 #c257 #c230) noodle bar (#c221 #c261) service bar (#c114b #c131 #c202 #c2 #c226)awc per plannning: this is a conditional occupancy permit only! Property owner will complete improvements to provide dry floodproofing to all electrical distribution panels and equipment to four feet above base flood elevation (bfe) by march 15 2015. Property owner is responsible for all floodproofing certificates elevation certificates and engineering or architectural certifications required to guarantee flood proofing. Property owner accepts all risk and liability associated with maintaining electrical distribution equipment at current identified elevations until dry floodproofing improvements are completed and approved. Date: August 7, 2014Permit id: Use2014-02742 | |||||
Use portion of horseshoe casino as a restaurant bar guys bbq jointawc per planning - floodplain installations in progress. Must be completed in full by april 2015 and have final inspection with floodplain manager before april 2015 or permit will be revoked. Date: March 23, 2015Permit id: Use2015-00984 | |||||
Install 7 dedicated 120v 20a ckts to various slot machines and podium. Install 22 data lines. As per code. Date: May 8, 2017 Value: $9,000Expiration date: November 8, 2017 | Permit id: Com2017-08828 | |||||
Alteration to do improvements on areas of the casino as per plans and as per code. Date: September 6, 2017 Value: $250,000Expiration date: September 6, 2018 | Permit id: Com2016-29115 | |||||
Amend permit com2016-25844 issued on 11 18 16 with plans #2016-2293 to add electrical contractor as listed above.(original permit:com2016-25844:install pre-fabricated trailer (modular building) with 2 hours rating inside the existing horseshoe casino garage for dealer training space as per plans as per code.)original permit description:(com2016-25844)install pre-fabricated trailer (modular building) with 2 hours rating inside the existing horseshoe casino garage for dealer training space as per plans as per code. Date: November 23, 2016Expiration date: November 18, 2017 | Permit id: Com2016-29942 | |||||
Amend permit com2016-178 issued on 11 04 16 with plans #2016-1573 to add electrical contractor as listed above.(original permit:com2016-17820:build 2 self-serve beverage stations; taking space away from existing service bars. New wall will be constructed to create alcoves for the soda fountain 2 alcoves totals sf wall will be built in an open area on the casino floor to create a cash center it will house atms and redemption machines in alcoves a storage area is created behind the machines (to store chairs and tables for the adjacent meeting space) area of construction 245 sf; existing first floor six 6 cage windows will be altered to have two 2 cage windows and 6 promotions windows; the office area behind the cage will be converted to storage space for promotional materials construction area 13 sf total area of alteration is 1 635 sf as per plans as per code.)original permit description:(com2016-17820)build 2 self-serve beverage stations; taking space away from existing service bars. N Date: November 23, 2016Expiration date: May 4, 2017 | Permit id: Com2016-29948 | |||||
Amend permit: add contractor .(original permit:com2016-17820:build 2 self-serve beverage stations; taking space away from existing service bars. New wall will be constructed to create alcoves for the soda fountain 2 alcoves totals sf wall will be built in an open area on the casino floor to create a cash center it will house atms and redemption machines in alcoves a storage area is created behind the machines (to store chairs and tables for the adjacent meeting space) area of construction 245 sf; existing first floor six 6 cage windows will be altered to have two 2 cage windows and 6 promotions windows; the office area behind the cage will be converted to storage space for promotional materials construction area 13 sf total area of alteration is 1 635 sf as per plans as per code.)original permit description:(com2016-17820)build 2 self-serve beverage stations; taking space away from existing service bars. New wall will be constructed to create alcoves for the soda fountain 2 alcoves tot Date: January 17, 2017Expiration date: May 4, 2017 | Permit id: Com2017-01037 | |||||
Add 2 sprinklers and relocate 17 sprinklers as per code. Date: January 3, 2017 Value: $2,400Expiration date: July 3, 2017 | Permit id: Com2017-00018 | |||||
Amend permit: add electrical contractor.(original permit:com2016-29115:alteration to do improvements on areas of the casino as per plans and as per code.)original permit description:(com2016-29115)alteration to do improvements on areas of the casino as per plans and as per code. Date: September 12, 2017Expiration date: September 6, 2018 | Permit id: Com2017-61384 | |||||
Amend permit: add hvac contractor . (original permit:com2016-29115:alteration to do improvements on areas of the casino as per plans and as per code.)original permit description:(com2016-29115)alteration to do improvements on areas of the casino as per plans and as per code. Date: September 19, 2017Expiration date: September 6, 2018 | Permit id: Com2017-61857 | |||||
Amend permit: add plumber contractor . Original permit:com2016-29115:alteration to do improvements on areas of the casino as per plans and as per code.)original permit description:(com2016-29115)alteration to do improvements on areas of the casino as per plans and as per code. Date: September 19, 2017Expiration date: September 6, 2018 | Permit id: Com2017-61858 | |||||
(use)continue to use as a restaurant(fu noodle) - change of operator Date: September 20, 2017Permit id: Use2017-00668 | |||||
Enclose the dining area that is open to the casino move the host desk to the casino vestibule and rearrange the casino control gates to allow access to the restaurant without entering the casino(conversion of the existing 5 9 sf binion steak house to a gordon ramsay branded steak house with new finishes) as per plans as per code. Date: September 25, 2017 Value: $500,000Expiration date: September 25, 2019 | Permit id: Com2017-14201 | |||||
Amend permit: add hvac contractor . (original permit:com2017-14201:enclose the dining area that is open to the casino move the host desk to the casino vestibule and rearrange the casino control gates to allow access to the restaurant without entering the casino(conversion of the existing 5 9 sf binion steak house to a gordon ramsay branded steak house with new finishes) as per plans as per code.)original permit description:(com2017-14201)enclose the dining area that is open to the casino move the host desk to the casino vestibule and rearrange the casino control gates to allow access to the restaurant without entering the casino(conversion of the existing 5 9 sf binion steak house to a gordon ramsay branded steak house with new finishes) as per plans as per code. Date: September 27, 2017Expiration date: September 25, 2019 | Permit id: Com2017-62693 | |||||
Install (9) # low voltage as per code. Date: October 10, 2017 Value: $9,600Expiration date: April 8, 2018 | Permit id: Com2017-62318 | |||||
Interior alterations (convert open office space in the hr department to individual offices. Divide up the hr training room to conference training and computer room. Add office in the poker room) as per plans as per code. Separate permit required for sprinkler system and fire alarm. Date: October 17, 2017 Value: $560,000Expiration date: October 17, 2019 | Permit id: Com2017-10501 | |||||
Amend permit: add hvac contractor . (original permit:com2017-10501:interior alterations (convert open office space in the hr department to individual offices. Divide up the hr training room to conference training and computer room. Add office in the poker room) as per plans as per code. Separate permit required for sprinkler system and fire alarm. )original permit description:(com2017-10501)interior alterations (convert open office space in the hr department to individual offices. Divide up the hr training room to conference training and computer room. Add office in the poker room) as per plans as per code. Separate permit required for sprinkler system and fire alarm. Date: October 19, 2017Expiration date: October 17, 2019 | Permit id: Com2017-64622 | |||||
Amend permit: add contractor . Extend original permit.(original permit:com2017-14201:enclose the dining area that is open to the casino move the host desk to the casino vestibule and rearrange the casino control gates to allow access to the restaurant without entering the casino(conversion of the existing 5 9 sf binion steak house to a gordon ramsay branded steak house with new finishes) as per plans as per code.)original permit description:(com2017-14201)enclose the dining area that is open to the casino move the host desk to the casino vestibule and rearrange the casino control gates to allow access to the restaurant without entering the casino(conversion of the existing 5 9 sf binion steak house to a gordon ramsay branded steak house with new finishes) as per plans as per code. Date: November 8, 2017Expiration date: March 25, 2020 | Permit id: Com2017-66364 | |||||
Amend permit: add contractor .(original permit:com2017-10501:interior alterations (convert open office space in the hr department to individual offices. Divide up the hr training room to conference training and computer room. Add office in the poker room) as per plans as per code. Separate permit required for sprinkler system and fire alarm. )original permit description:(com2017-10501)interior alterations (convert open office space in the hr department to individual offices. Divide up the hr training room to conference training and computer room. Add office in the poker room) as per plans as per code. Separate permit required for sprinkler system and fire alarm. Date: November 15, 2017Expiration date: October 17, 2019 | Permit id: Com2017-17590 | |||||
Amend permit: add electrical contractor . (original permit:com2017-14201:enclose the dining area that is open to the casino move the host desk to the casino vestibule and rearrange the casino control gates to allow access to the restaurant without entering the casino(conversion of the existing 5 9 sf binion steak house to a gordon ramsay branded steak house with new finishes) as per plans as per code.)original permit description:(com2017-14201)enclose the dining area that is open to the casino move the host desk to the casino vestibule and rearrange the casino control gates to allow access to the restaurant without entering the casino(conversion of the existing 5 9 sf binion steak house to a gordon ramsay branded steak house with new finishes) as per plans as per code. Date: November 16, 2017Expiration date: September 25, 2019 | Permit id: Com2017-67112 | |||||
Partial permit subject to all conditions of agreement to do footing and foundation underground utilities pending action on application for plan #2012-2143 the issuance of the general permit and the understanding that the engineer architect willcomply with the baltimore city building fire and related code - 2011. Date: May 24, 2013 Value: $466,000Expiration date: May 24, 2014 | Permit id: Com2013-10581 | |||||
Tenant fit out of existing building space (for restaurant) as per plans and as per code. If altering either sprinkler or fire alarm systems separate permits are required. C o "required on a seperate form upon completion" heavy seas burgers" Date: March 26, 2014 Value: $895,184Expiration date: September 26, 2016 | Permit id: Com2014-01664 | |||||
Interior fit out to existing building (for deli restaurant) as per plans and as per code. If altering either sprinkler or fire alarm systems separate permits are required. C o required on a seperate form upon completion " the mallow bar crunchies desert cafe" Date: April 22, 2014 Value: $717,304Expiration date: April 22, 2016 | Permit id: Com2014-01665 | |||||
Original permit description:(com2014-01665)interior fit out to existing building (for deli restaurant) as per plans and as per code. If altering either sprinkler or fire alarm systems separate permits are required. C o required on a seperate form upon completion " the mallow bar crunchies desert cafe" Date: June 3, 2014Expiration date: April 22, 2016 | Permit id: Com2014-11497 | |||||
Original permit description:(com2014-01664)tenant fit out of existing building space (for restaurant) as per plans and as per code. If altering either sprinkler or fire alarm systems separate permits are required. C o "required on a seperate form upon completion" heavy seas burgers" Date: June 3, 2014Expiration date: September 26, 2016 | Permit id: Com2014-11510 |