ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Cat scan Date: September 18, 2007Permit type: Electrical permit | Permit status: Issued | Current use: Business building | Permit id: 465928 | |||||
Install 1 - 3 kva pole type transformer and associated overhead equipment to feed telecommunications equipment on feeder #15852in accordance with pepco plan no. 3514180. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: August 1, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 353429 | |||||
Pre-const. Mtg. Reqd call dps inspector ralph wolfe @ 301-370-3692 overlash 125 feet of aerial fiber cable facilities over shady grove road at corporate boulevard, place 2 feet of buried fiber cable along corporate boulevard (conduit/ducts/handhold boxes/pedestals,etc). All above & below grade facilities shall be placed in public utility easements or adjacent to the right-of-way line unless approved otherwise by the mcdps right-of-way (row) inspector. Work shall comply w/the mont. Co. Specs. For utility const. Permit, july, 2003. All lane closures/traffic controls shall comply w/approved traffic control plans, guidelines for temp. Traffic control requirements & directions of the dps row inspector. Complete repair/restoration of the row shall be made in-kind of any & all damages to improvements in the public row caused by construction operations. Const. Crews shall not drive/park vehicles over curbs, sidewalks or grassy areas. Utility rep: gabor i. Varsa @ 301-595-61 verizon #9a863 Date: February 27, 2008Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 256621 |