ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Mechanical permit Date: December 3, 2013Permit status: Finaled | Completion date: August 4, 2014 | Current use: Single family dwelling | Permit id: 656777 | |||||
Mechanical permit Date: August 25, 2014Permit status: Issued | Current use: Single family dwelling | Permit id: 685362 | |||||
Shed Date: August 27, 2014 Value: $5,000Permit type: Building residential | Permit status: Issued | Current use: Shed | Permit id: 685618 | |||||
New home on vacant lot revision 12/30/13--see log revision issued on 1/17/2014 Date: July 22, 2013 Value: $500,000Permit type: Building residential | Permit status: Issued | Current use: Single family dwelling | Permit id: 626838 | |||||
Restoration (row) complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused byconstruction operations. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: June 6, 2013Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 294406 | |||||
New home on vacant lot revision 12/30/13--see log revision issued on 1/17/2014 Date: July 22, 2013 Value: $500,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 626838 | |||||
Install overhead wire and associated equipment in accordance with pepco plan no. 3426557. Work shall comply with montgomery county specifications for utility construction permit and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit . All lane closures/traffic controls shall comply with the mcdot approved traffic control plans. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: October 24, 2013Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 301987 | |||||
Under the pavement cut moratorium until 11/8/13. A full width 2 mill and overlayis requiredper the current county specifications for utility construction permit and as directed by the dps row
|