ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Building: @ (entrance stairs): properly repair defective and missing brick (4th and 5th treads up, 2nd tread up) stairs and mortar at front stairaway/ Date: October 30, 2009Permit type: Gc | Permit id: Ea13965 | |||||
Re-light gal hot water heater, at boiler room around back of house. Restore / adjust h/w/h to proper working order. Restore hot water to buildin Date: February 17, 2011 Value: $25Permit type: Plumb | Permit id: Eb23177 | |||||
Apt#1: (replace door lock) replace the defective lock in the entrance door to apt # 1 remove all work related debris. Non s. W. P. Date: September 8, 2009 Value: $29Permit type: Gc | Permit id: Ea09182 | |||||
Remove three (3) dead cats from basement. Pending repairs to boiler . Date: December 19, 2008 Value: $99Permit type: Misc | Permit id: E920338 | |||||
Re-light gal hot water heater, at boiler room around back of house. Restore adjust h w h to proper working order. Restore hot water to buildin Date: February 17, 2011 Value: $25Permit type: Plumb | Permit id: Eb23177 | |||||
Building: @ (entrance stairs): properly repair defective and missing brick (4th and 5th treads up, 2nd tread up) stairs and mortar at front stairaway Date: October 30, 2009Permit type: Gc | Permit id: Ea13965 | |||||
Replace the defective gas hot water heater with new gal water heater, make all necessary changes to pipe work leading to and from water heater. T Date: September 28, 2009Permit type: Plumb | Permit id: Ea10549 | |||||
At cellar remove the standing water at floor. Cleanse , disinfect and sanitize the entire cellar floor. Remove all work related debris. Con Date: August 24, 2011Permit type: Stopag | Permit id: Ec05505 | |||||
At 2nd floor apartment trace and repair the source of water leak from above the room -n3 and restore the ceiling & wall approx 1 sq. Ft.. Prime and p Date: September 1, 2011Permit type: Gc | Permit id: Ec05821 | |||||
Trace and repair source of water leak at bathroom, demolish approx 1 sq. Ft. Of wood floor at kitchen, provide adequate support for new floor, insta Date: July 20, 2009Permit type: Gc | Permit id: Ea03981 | |||||
Keyspan provide gas to boiler / hot water heater Date: November 9, 2006Permit type: Util | Permit id: E713054 | |||||
Apt#1: (replace glass in lower sash): replace with new the broken glass on the lower glass of the west window in room # 2 remove all work related Date: September 14, 2009Permit type: Gc | Permit id: Ea09186 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: April 23, 2009Permit type: Delead | Permit id: E936102 | |||||
Keyspan provide gas to boiler / hot water heater. Permit type: Util | Permit id: E716113 | |||||
Apartment #2 ,provide / install new bathtub drain complete new drain pipes. Provide / install new drain pipes to wash basin. Provide / install new show Permit type: Plumb | Permit id: Ea03606 | |||||
(apt #1) restore gas boiler to proper working order. Disconnect illegal wire from boiler switch to 2nd floor apartment. Contractor must sign an Date: March 4, 2009Permit type: Heat | Permit id: E929230 | |||||
At boiler room: make all necessary repairs to gas fired boiler, repair / replace parts as needed to restore hot water supply to apt# 1 according to Date: September 22, 2009Permit type: Heat | Permit id: Ea10534 | |||||
Restore gas boiler to proper working order. Restore hot water to building and apt. #1. Note: contractor must contact h. P. D. @(718) 636-3015, 3024, Date: April 27, 2007Permit type: Heat | Permit id: E728772 | |||||
(apt #1) at bathroom: trace and repair source of water leak at ceiling from apartment above. Properly repair ceiling approximately 48 sq. Ft. With 5/8 Date: March 27, 2009Permit type: Gc | Permit id: E931514 | |||||
National grid rpovide gas to boiler / hot water heater. Date: July 1, 2009Permit type: Util | Permit id: Ea02613 | |||||
Apartment # 1. Bathroom. Demo and install new g. Date: July 17, 2009Permit type: Gc | Permit id: Ea03788 | |||||
At boiler room, pump out all water which has been accumilated . Properly discard all debris and sanitize boiler room floor in order to p/i a new boil Date: November 29, 2006Permit type: Stopag | Permit id: E714561 | |||||
Exterminate mosquitos/bugs at boiler room hot water related, upon completion of work contact erp/hpd asap. Note: contractor must contact h. P. D Date: September 21, 2009Permit type: Exterm | Permit id: Ea10533 | |||||
Gas boiler: make all necessary repairs to gas boiler to restore to proper working condition. Restore heat to entire building note: contractor mu Date: December 29, 2008Permit type: Heat | Permit id: E919432 | |||||
National grid rpovide gas to boiler / hot water heater. Date: December 1, 2008Permit type: Util | Permit id: E917498 | |||||
Remove existing heating plant and install new gas fired boiler. Install new cast iron/ steel boiler to supply adequate heat and hot water to building Date: November 29, 2006Permit type: Heat | Permit id: E714567 | |||||
Keyspan provide gas to boiler / hot water heater. Permit type: Util | Permit id: E716113 | |||||
Apartment #2 ,provide / install new bathtub drain complete new drain pipes. Provide / install new drain pipes to wash basin. Provide / install new show Permit type: Plumb | Permit id: Ea03606 | |||||
Apartment #2 ,provide / install new bathtub drain complete new drain pipes. Provide / install new drain pipes to wash basin. Provide / install new show Permit type: Plumb | Permit id: Ea03606 | |||||
Keyspan provide gas to boiler / hot water heater. Permit type: Util | Permit id: E716113 | |||||
Remove existing heating plant and install new gas fired boiler. Install new cast iron steel boiler to supply adequate heat and hot water to building Date: November 29, 2006Permit type: Heat | Permit id: E714567 | |||||
National grid rpovide gas to boiler hot water heater. Date: December 1, 2008Permit type: Util | Permit id: E917498 | |||||
Exterminate mosquitos bugs at boiler room hot water related, upon completion of work contact erp hpd asap. Note: contractor must contact h. P. D Date: September 21, 2009Permit type: Exterm | Permit id: Ea10533 | |||||
At boiler room, pump out all water which has been accumilated . Properly discard all debris and sanitize boiler room floor in order to p i a new boil Date: November 29, 2006Permit type: Stopag | Permit id: E714561 | |||||
National grid rpovide gas to boiler hot water heater. Date: July 1, 2009Permit type: Util | Permit id: Ea02613 | |||||
(apt #1) at bathroom: trace and repair source of water leak at ceiling from apartment above. Properly repair ceiling approximately 48 sq. Ft. With 5 8 Date: March 27, 2009Permit type: Gc | Permit id: E931514 | |||||
At boiler room: make all necessary repairs to gas fired boiler, repair replace parts as needed to restore hot water supply to apt# 1 according to Date: September 22, 2009Permit type: Heat | Permit id: Ea10534 | |||||
Apartment #2 ,provide install new bathtub drain complete new drain pipes. Provide install new drain pipes to wash basin. Provide install new show Permit type: Plumb | Permit id: Ea03606 | |||||
Keyspan provide gas to boiler hot water heater. Permit type: Util | Permit id: E716113 | |||||
Keyspan provide gas to boiler hot water heater Date: November 9, 2006Permit type: Util | Permit id: E713054 | |||||
Apartment #2 ,provide install new bathtub drain complete new drain pipes. Provide install new drain pipes to wash basin. Provide install new show Permit type: Plumb | Permit id: Ea03606 | |||||
Keyspan provide gas to boiler hot water heater. Permit type: Util | Permit id: E716113 | |||||
Apt # 1 bedroom, kitchen, bathroom, livingroom. Trace and repair all conceal leaks effecting these arears . Make all repair at these arears Date: August 30, 2011Permit type: Gc | Permit id: Ec05304 | |||||
Apt # 1 kitchen : remove kitchen fixtures and open floor to ascertain the problem ( hpd office must be notify the day before as to be presant at Date: September 1, 2011Permit type: Gc | Permit id: Ec05309 | |||||
Apt #1 roof . Cap sheet the entire rear extension roof with lb capsheet aproximate 1 sf. Flash parapet walls and clear all gutters to s Date: September 6, 2011Permit type: Gc | Permit id: Ec05306 | |||||
1st floor@ bathroom: remove mold from ceilings and walls approx. 50sft from the entire bathroom. Use 50: bleach / water solution and allow to dry. Date: November 28, 2011Permit type: Gc | Permit id: Ec13086 | |||||
At 1st floor apt / crawl space : heat related work remove existing temporary plywood flooring in kitchen, make all necessary repairs at waste line Date: October 14, 2011Permit type: Plumb | Permit id: Ec08501 | |||||
Perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: September 13, 2011Permit type: Delead | Permit id: Ec07083 | |||||
At kitchen and bathroom in 1st floor apt: disconnect all plumbing fixtures, base cabinets and stove, remove temporary plywood flooring in kitchen Permit type: Gc | Permit id: Ec08629 | |||||
At kitchen and bathroom in 1st floor apt: disconnect all plumbing fixtures, base cabinets and stove, remove temporary plywood flooring in kitchen Permit type: Gc | Permit id: Ec08629 | |||||
At kitchen and bathroom in 1st floor apt: disconnect all plumbing fixtures, base cabinets and stove, remove temporary plywood flooring in kitchen Permit type: Gc | Permit id: Ec08629 | |||||
At kitchen and bathroom in 1st floor apt: disconnect all plumbing fixtures, base cabinets and stove, remove temporary plywood flooring in kitchen Permit type: Gc | Permit id: Ec08629 | |||||
At 1st floor apt crawl space : heat related work remove existing temporary plywood flooring in kitchen, make all necessary repairs at waste line Date: October 14, 2011Permit type: Plumb | Permit id: Ec08501 | |||||
1st floor@ bathroom: remove mold from ceilings and walls approx. 50sft from the entire bathroom. Use 50: bleach water solution and allow to dry. Date: November 28, 2011Permit type: Gc | Permit id: Ec13086 | |||||
At kitchen and bathroom in 1st floor apt: disconnect all plumbing fixtures, base cabinets and stove, remove temporary plywood flooring in kitchen Permit type: Gc | Permit id: Ec08629 |