Building Permits at 1511 Sw Taylor St Portland OR


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 1511 Sw Taylor St Portland OR over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Land use review | Permit status: Completed | Completion date: July 28, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Land use review | Permit status: Closed | Completion date: December 5, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Land use review | Permit status: Closed | Completion date: July 29, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Land use review | Permit status: Completed | Completion date: September 24, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Land use review | Permit status: Completed | Completion date: September 5, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Land use review | Permit status: Completed | Completion date: October 1, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Land use review | Permit status: Completed | Completion date: June 8, 2015 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Land use review | Permit status: Completed | Completion date: October 16, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Land use review | Permit status: Completed | Completion date: October 23, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Land use review | Permit status: Completed | Completion date: November 20, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Land use review | Permit status: Completed | Completion date: December 8, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Land use review | Permit status: Completed | Completion date: January 20, 2015 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Site development | Permit status: Response sent | Completion date: September 26, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Site development | Permit status: Response sent | Completion date: August 7, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Life safety | Permit status: Response sent | Completion date: September 22, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Fire bureau | Permit status: No concerns | Completion date: September 29, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Environmental services | Permit status: No concerns | Completion date: September 10, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Environmental services | Permit status: Response sent | Completion date: October 2, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Environmental services | Permit status: Response sent | Completion date: September 23, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Environmental services | Permit status: Response sent | Completion date: August 12, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Transportation | Permit status: Response sent | Completion date: October 7, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Transportation | Permit status: Response sent | Completion date: August 12, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Water bureau review | Permit status: Response sent | Completion date: September 24, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui

Permit type: Parks bureau | Permit status: Response sent | Completion date: September 27, 2014 | Permit id: 2014-190042-000
0951511 Sw Taylor St Portland Or
Pbot pw permit

Permit type: Intake pw | Permit status: Assigned | Completion date: October 1, 2014 | Permit id: 2014-209805-000
0951511 Sw Taylor St Portland Or
Pbot pw permit

Permit type: Intake pw | Permit status: Assigned | Completion date: September 15, 2014 | Permit id: 2014-209805-000
0951511 Sw Taylor St Portland Or
Pbot pw permit

Permit type: Pre-design pw | Permit status: Completed | Completion date: February 9, 2015 | Permit id: 2014-209805-000
0951511 Sw Taylor St Portland Or
Pbot pw permit

Permit type: Pre-design pw | Permit status: Not reqd | Completion date: September 15, 2014 | Permit id: 2014-209805-000
0951511 Sw Taylor St Portland Or
Pbot pw permit

Permit type: Pre-design pw | Permit status: Received | Completion date: September 9, 2014 | Permit id: 2014-209805-000
0951511 Sw Taylor St Portland Or
Pbot pw permit

Permit type: Pre-design pw | Permit status: Accepted for review | Completion date: September 9, 2014 | Permit id: 2014-209805-000
0951511 Sw Taylor St Portland Or
Pbot pw permit

Permit type: Pre-design pw | Permit status: Completed | Completion date: November 6, 2014 | Permit id: 2014-209805-000
0951511 Sw Taylor St Portland Or
Pbot pw permit

Permit type: Pre-design pw | Permit status: Billed | Completion date: July 2, 2015 | Permit id: 2014-209805-000
0951511 Sw Taylor St Portland Or
Pbot pw permit

Permit type: Plan review pw | Permit status: Approved | Completion date: March 6, 2015 | Permit id: 2014-209805-000
0951511 Sw Taylor St Portland Or
Pbot pw permit

Permit type: Plan review pw | Permit status: Appr w/corr | Completion date: March 12, 2015 | Permit id: 2014-209805-000
0951511 Sw Taylor St Portland Or
Pbot pw permit

Permit type: Plan review pw | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2014-209805-000
0951511 Sw Taylor St Portland Or
Pbot pw permit

Permit type: Plan review pw | Permit status: Approved | Completion date: January 27, 2015 | Permit id: 2014-209805-000
0951511 Sw Taylor St Portland Or
Pbot pw permit

Permit type: Pre-issuance pw | Permit status: Not reqd | Completion date: July 2, 2015 | Permit id: 2014-209805-000
0951511 Sw Taylor St Portland Or
Pbot pw permit

Permit type: Pre-issuance pw | Permit status: Completed | Completion date: June 29, 2015 | Permit id: 2014-209805-000
0951511 Sw Taylor St Portland Or
Pbot pw permit

Permit type: Pre-issuance pw | Permit status: Billed | Completion date: July 2, 2015 | Permit id: 2014-209805-000
0951511 Sw Taylor St Portland Or
Pbot pw permit

Permit type: Pre-issuance pw | Permit status: Completed | Completion date: January 27, 2015 | Permit id: 2014-209805-000
0951511 Sw Taylor St Portland Or
Approval of replacement of a total of 12 juliet balconies with full balconies at 4 (d) x 12 (w) on the previously approved building in the goose hollow subdistrict of the central city plan district. The balconies will be located on the west and east faades at floors 3, 4, and 5. This approval is per the approved site plans, exhibits c-1 through c-6, signed and dated april 7, 2016, subject to the following conditions:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c-1 through c-6. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 16-123216 dz. No field changes allowed.
Date:  April 11, 2016

Permit type: Land use review | Permit status: Completed | Completion date: February 22, 2016 | Permit id: 2016-123216-000
2016/04/110951511 Sw Taylor St Portland Or
It is the decision of the design commission to approve design review for a new 6-story building, in the goose hollow subdistrict of the central city plan district, with 121 residential units, approximately 9 square feet of commercial space, roof deck, and 65 below-grade vehicular parking spaces and 1 at-grade loading space accessed from sw 16th avenue. Exterior materials include concrete, stucco, fiber cement panel, black vinyl windows, black fiberglass doors, black aluminum storefront, and steel garage doors. Approval of the following modification requests:1. 33. 266. 130. F. 2 parking area layouts - to reduce the width of 19 of the below-grade parking spaces from the required 8-6 to as much as 7-10; and2. 33. 266. 220. C. 3 standards for all bicycles - to reduce the width of all of the required 184 long-term bicycle parking spaces from the required 2 to 1-6. Approvals per exhibits c-1-c-43, signed, stamped, and dated november 20, 2014, subject to the following conditions:a. As part of the bui
Date:  December 8, 2014

Permit type: Land use review | Permit status: Completed | Completion date: July 28, 2014 | Permit id: 2014-190042-000
2014/12/080951511 Sw Taylor St Portland Or
Pbot pw permit
Date:  September 8, 2015

Permit type: Intake pw | Permit status: Assigned | Completion date: October 1, 2014 | Permit id: 2014-209805-000
2015/09/080951511 Sw Taylor St Portland Or
Ti for new tenant
Date:  December 18, 2007

Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: February 1, 2008 | Current use: Business | Permit id: 2007-141411-000
2007/12/180951511 Sw Taylor St Portland Or
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.