ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Repair gas service... 4x5 cut over main ,install gas service in accordance with washington gas plan no. 625899. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: February 22, 2016Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 351285 | |||||
Reliability replace primary wire with 477 ascr, neutral with 4 acsr bare, ground wires, lightning arrestors, animal guards, phase spacers and associated equipment to improve reliability in accordance with pepco plan no. 3507558. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work Date: October 14, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 354692 | |||||
Re-do the southwesterly side of the intersection of southlawn court to a 40-feet radius. Construct new handicap ramps, curb and gutter using both m-sha and county standards; a 8-feet wide concrete bikepath, 4-feet wide sidewalk, street trees, 12-inch asphalt paving. Remove the existing concrete apron and restore area. Field connect a private 12-inch reinforced concrete pipe into montgomery countys 60-inch reinforced concrete pipe. Re-grade the southwesterly side of the southlawn court intersection to improve sight distance. Sod all disturbed areas. Date: February 26, 2002Permit type: Public right of way | Permit status: Finaled | Current use: Driveway | Permit id: 213989 |