ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 94 3 sq ft sea cargo container for existing sfd. Permit type: New residential acc | Permit status: Completed | Permit id: Pds2007-1006-20 | Parcel: 393-021-64-00 | |||||
SCORE 94 Ground mount residential solar pv for existing sfd 12-18-15 plan change, re-located and add panels. -drw Date: December 14, 2015 Contractor: John Diano ConstructionPermit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2015-Resalt- | Parcel: 3930216400 | |||||
SCORE 94 New owners - but a cedar fire burnout 4,371 sq. Ft. 2-story sfd with f. S. & a c, attached fin. Garage with f. S., 987 sq. Ft., 497 sq. Ft. Patio covers, 8 sq. Ft. Decking, 2 amp electric service, temporary power, temporary occupancy permit, misc. Plumbing with propane piping, 2 faus & a cs, 4 fireplaces, and 5 skylights-ded, 4 19 05 notice to permittee: temp power shall be inspected prior to framing inspection Permit type: New primary residential structure | Permit status: Completed | Permit id: Pds2005-1001-20 | Parcel: 393-021-64-00 | |||||
SCORE 94 Cedar fire but new owners 4,371 sq. Ft. 2-story sfd with f. S. & a c, attached fin. Garage with f. S., 987 sq. Ft., 497 sq. Ft. Patio covers, 8 sq. Ft. Decking, 2 amp electric service, temporary power, temporary occupancy permit, misc. Plumbing with propane piping, 2 faus & a cs, 4 fireplaces, and 5 skylights-ded, 4 19 05 notice to permittee: temp power shall be inspected prior to framing inspection 03-mar-2006: add (3) sea cargo containers to this permit. Also add shade cover over t. O. P. That was issued w bldg permit for sfd. All of these to be removed prior to sfd final. This per jra. Permit type: New primary residential structure | Permit status: Completed | Permit id: Pds2005-1003-20 | Parcel: 393-021-64-00 |