| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
San (trash enclosure):383 lf of 8 (pipe material unknown) main in se clay st. Approx depth 12 contractor to build new 6 branch and connect to new bom 6 x 8 tee into 8 main per std p-262. Contractor to verify all depths and connections in field. X37869 Date: November 12, 2014Permit type: Intake | Permit status: Closed | Completion date: November 12, 2014 | Permit id: 2014-236571-000 | |||||
Install plumbing for viewpoint ti Date: November 14, 2014Permit type: Intake | Permit status: Closed | Completion date: November 14, 2014 | Permit id: 2014-238085-000 | |||||
Low voltage for ddc controls Date: November 18, 2014Permit type: Intake | Permit status: Closed | Completion date: November 18, 2014 | Permit id: 2014-239001-000 | |||||
Provide and install av, network infrastructure and security systems Date: November 19, 2014Permit type: Intake | Permit status: Closed | Completion date: November 19, 2014 | Permit id: 2014-239991-000 | |||||
Hazardous materials-install 15 gallon, above ground, fuel tank for back up generator Date: May 14, 2015Permit type: Intake | Permit status: Approved | Completion date: February 25, 2015 | Permit id: 2015-124889-000 | |||||
B2/pr# rmp 11273/remove dock on west side of building Date: November 18, 2009Permit type: Intake | Permit status: Closed | Completion date: November 13, 2009 | Permit id: 2009-171440-000 | |||||
Contamination remediation that includes: removal of pcb and coi contaminated concrete, asphalt and soil, cleaning and/or replacing all stormwater pipes and collection systems, temporary structural stabilization. Building to be unoccupied during construction Date: September 26, 2013Permit type: Application | Permit status: Approved | Completion date: May 29, 2013 | Permit id: 2013-156774-000 | |||||
Revision - remove requirements for the metal deck and ledgers with expansion anchors for the exterior elevator decking from drawing c-08. The exterior elevator shaft was excavated to approvimately 14 feet below the basement surface and was subsequently filled with controlled density fill up to the original elelevator shaft surface Date: March 24, 2015Permit type: Application | Permit status: Approved | Completion date: February 11, 2015 | Permit id: 2013-156774-Rev | |||||
Remodel and change of occupancy of existing building; interior and exterior core elements; site work including re-striping of parking lot; no occupancy on this permit. Tenant improvement permit in for review 14-116970co Date: March 27, 2014Permit type: Application | Permit status: Approved | Completion date: November 27, 2013 | Permit id: 2013-233059-000 | |||||
Dfs for wood curtain wall Date: January 13, 2015Permit type: Application | Permit status: Approved | Completion date: December 4, 2014 | Permit id: 2013-233059-Dfs | |||||
Dfs for steel stairs for #2 and #3 Date: January 20, 2015Permit type: Application | Permit status: Approved | Completion date: December 4, 2014 | Permit id: 2013-233059-Dfs | |||||
Dfs structrual/seismic calc for hvac equipment Date: February 23, 2015Permit type: Application | Permit status: Approved | Completion date: February 6, 2015 | Permit id: 2013-233059-Dfs | |||||
Value added revision to topping slab assembly and adjust top of slab elevations accordingly Date: June 19, 2014Permit type: Application | Permit status: Approved | Completion date: April 1, 2014 | Permit id: 2013-233059-Rev | |||||
New detached trash enclosure. Plans with 13-233059-co. Date: March 27, 2014Permit type: Application | Permit status: Approved | Completion date: November 27, 2013 | Permit id: 2013-233065-000 | |||||
10 cfm hru, 28,0 cfm 4-pipe ahu, 100t chiller, two 10 mbh dv boilers, garage exhaust, radiant floors, plans w/co Date: March 27, 2014Permit type: Intake | Permit status: Closed | Completion date: November 27, 2013 | Permit id: 2013-233069-000 | |||||
Install 400ft of 4 sanitary pipe and 5 floor drains Date: December 17, 2013Permit type: Intake | Permit status: Closed | Completion date: December 17, 2013 | Permit id: 2013-239102-000 | |||||
Tenant improvement build out includes offices bathrooms, break room and lounge (partial change of occupancy).. Building occupant load:680 shell permit under 13-233059-co, 13-233065co Date: November 14, 2014Permit type: Application | Permit status: Approved | Completion date: February 14, 2014 | Permit id: 2014-116970-000 | |||||
Dfs - attachment of mechanical equipment Date: February 23, 2015Permit type: Application | Permit status: Approved | Completion date: February 3, 2015 | Permit id: 2014-116970-Dfs | |||||
Distribution duct on 1st and 2nd floors for existing vav, plans w/co Date: November 14, 2014Permit type: Intake | Permit status: Approved | Completion date: February 18, 2014 | Permit id: 2014-116974-000 | |||||
Sprinkler - provide new dry system in basement parking. Provide new wet system (2) floors of office space (existing bldg.)ug by city. On property line. Date: June 4, 2014Permit type: Intake | Permit status: Approved | Completion date: May 13, 2014 | Permit id: 2014-154823-000 | |||||
Stormwater line cleaning access permit - permit expires 6/4/15 Permit type: Intake -we | Permit status: Closed | Completion date: May 13, 2014 | Permit id: 2014-156517-000 | |||||
Stormwater line cleaning access permit - permit expires 6/4/15 Permit type: Intake -we | Permit status: Closed | Completion date: May 14, 2014 | Permit id: 2014-156517-000 | |||||
Stormwater line cleaning access permit - permit expires 6/4/15 Permit type: Bond/insurance -we | Permit status: Closed | Completion date: October 4, 2013 | Permit id: 2014-156517-000 | |||||
Stormwater line cleaning access permit - permit expires 6/4/15 Permit type: Issuance -we | Permit status: Closed | Completion date: June 4, 2014 | Permit id: 2014-156517-000 | |||||
Remodel of existing bulding; all plumbing for shell Date: June 3, 2014Permit type: Intake | Permit status: Closed | Completion date: June 3, 2014 | Permit id: 2014-164431-000 | |||||
Install 1 of storm sewer on property Date: June 9, 2014Permit type: Intake | Permit status: Closed | Completion date: June 9, 2014 | Permit id: 2014-166962-000 | |||||
Low voltage controls for radiant floor system, hrv, ahu and chiller Date: July 17, 2014Permit type: Intake | Permit status: Closed | Completion date: July 17, 2014 | Permit id: 2014-185370-000 | |||||
Core/shell site electrical work Date: September 2, 2014Permit type: Intake | Permit status: Closed | Completion date: July 28, 2014 | Permit id: 2014-190145-000 | |||||
Install 50ft of sanitary sewer and 500ft of storm sewer Date: August 4, 2014Permit type: Intake | Permit status: Closed | Completion date: August 4, 2014 | Permit id: 2014-193238-000 | |||||
Fire alarm-install silent knight farenhyt ifp- addressable facp for core/shell Date: September 11, 2014Permit type: Intake | Permit status: Approved | Completion date: August 11, 2014 | Permit id: 2014-196872-000 | |||||
Install gas piping to (2) boilers and a water heater Date: October 6, 2014Permit type: Intake | Permit status: Closed | Completion date: October 6, 2014 | Permit id: 2014-221950-000 | |||||
New 31. 95sf illuminated sign Date: October 10, 2014Permit type: Intake | Permit status: Closed | Completion date: October 10, 2014 | Permit id: 2014-223962-000 | |||||
New illuminated 21. 78sf sign Date: October 10, 2014Permit type: Intake | Permit status: Closed | Completion date: October 10, 2014 | Permit id: 2014-223968-000 | |||||
One sign circuit illuminated channel letters Date: October 10, 2014Permit type: Intake | Permit status: Closed | Completion date: October 10, 2014 | Permit id: 2014-223971-000 | |||||
Tenant improvement electrical work Date: November 6, 2014Permit type: Intake | Permit status: Closed | Completion date: October 14, 2014 | Permit id: 2014-225507-000 | |||||
Stm conn: 58lf of 24 csp main, approx d=14 in se hawthorne blvd. Contractor shall build new branch per std p-262 and connect at new bom tap at smh abq916 (approx d=14) intersection of water and hawthorne contractor to verify all depths and locations in field. Contact x37869 Date: November 12, 2014Permit type: Intake | Permit status: Closed | Completion date: October 31, 2014 | Permit id: 2014-232650-000 | |||||
Security systemfaxed Date: November 7, 2014Permit type: Intake | Permit status: Closed | Completion date: November 7, 2014 | Permit id: 2014-235679-000 | |||||
Fire alarmfaxed Date: November 7, 2014Permit type: Intake | Permit status: Closed | Completion date: November 7, 2014 | Permit id: 2014-235681-000 | |||||
Alarm - completion of tenant building from core & shell Date: November 25, 2014Permit type: Intake | Permit status: Approved | Completion date: November 7, 2014 | Permit id: 2014-235725-000 | |||||
Install 2 amp temporary service for job shack. Move (1) 2 amp panel in elevator room. Disconnect lights and circuits @ different spots around building. Faxed Date: September 20, 2013Permit type: Intake | Permit status: Closed | Completion date: September 20, 2013 | Permit id: 2013-207971-000 | |||||
Core/shell site electrical workfaxed Date: September 2, 2014Permit type: Intake | Permit status: Closed | Completion date: July 28, 2014 | Permit id: 2014-190145-000 | |||||
Provide and install av, network infrastructure and security systemsfaxed Date: November 19, 2014Permit type: Intake | Permit status: Closed | Completion date: November 19, 2014 | Permit id: 2014-239991-000 | |||||
Dfs structrual seismic calc for hvac equipment Date: February 23, 2015Permit type: Application | Permit status: Approved | Completion date: February 6, 2015 | Permit id: 2013-233059-Dfs | |||||
Core shell site electrical workfaxed Date: September 2, 2014Permit type: Intake | Permit status: Closed | Completion date: July 28, 2014 | Permit id: 2014-190145-000 | |||||
Contamination remediation that includes: removal of pcb and coi contaminated concrete, asphalt and soil, cleaning and or replacing all stormwater pipes and collection systems, temporary structural stabilization. Building to be unoccupied during construction Date: September 26, 2013Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: March 27, 2015 | Current use: Business | Permit id: 2013-156774-000 | |||||
Tenant improvement build out includes offices bathrooms, break room and lounge (partial change of occupancy).. Building occupant load:6 shell permit under 13-233059-co, 13-233065co Date: November 14, 2014Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: June 11, 2015 | Current use: Business | Permit id: 2014-116970-000 |