Test 5 existing backflow preventers in various location throughout building (all devices are in boiler room) as per code. Date: October 21, 2015 Value: $500Permit id: Com2015-24995 | |||||
Grading/maintenance repairs of eroded areasas per plans as per code. Date: June 5, 2012 Value: $12,500Permit id: Com2011-26685 | |||||
"non structural alterations: interior work; test total of 5 backflows devices- 8 wilkens 375 s/n l22461 main water rm rp2. 6"" wilkens 375 a s/n yod5 chillcol water make up rp2 3"" wilkens 375 s/n l22348 double check dcw-8 2"" wilkens 975xl s/n w203475 dcw" Date: April 24, 2012 Value: $3,000Permit id: Com2012-08149 | |||||
"test total of (5) back flow devices. 8"" wilkens 375 s/n l22461 main water room rpz as per code. 6"" wilkens 375 a s/n yod5 chilled water make up rpz. 3"" wilkens 375 s/n l22348 double c/k dcw-8. 2"" wilkens 975xl s/n w203475 dcw-11 rpz room. 6"" ames s/n 08" Date: September 6, 2011 Value: $1,250Permit id: Com2011-19285 | |||||
Install illuminated directory sign 1 tall x 44 1/2 wide of aluminum cabinet and pan faces; vinyl graphics and digitally printed compass. Date: July 28, 2011 Value: $8,400Permit id: Com2010-09148 | |||||
Request for time extension on permit com2005-07404 issued on 04/13/07 with original completion date of 10/28/08. Original permit description:(com2005-07404)mass grading and sediment and erosion controls of site to prep side for building of future power pl Date: October 29, 2008Permit id: Com2008-28995 | |||||
Request for time extension on permit com2005-07404 issued on 04/13/2007 with orginal completion date of 04/15/2008. Original permit description:(com2005-07404)mass grading and sediment and erosion controls of site to prep side for building of future powe Date: April 25, 2008Permit id: Com2008-11759 | |||||
Request for time extension on permit com2005-08404 issued on 4/13/07 with original completion date of 10/16/07original permit description:(com2005-07404)mass grading and sediment and erosion controls of site to prep side for building of future power plant Date: October 15, 2007Permit id: Com2007-31862 | |||||
"request for time extension on permit#com2005-17953 issued on 5-18-06 with original completion date of 5-18-07original permit description:(com2005-17953)replaced existing bulk heads as per plans.""this permit is not a license to do work that would constitut" Date: May 22, 2007Permit id: Com2007-15738 | |||||
Request for time extension on permit #com2005-07404 issued on 4-13-06 with original completion date of 4-13-07. Original permit description:(com2005-07404)mass grading and sediment and erosion controls of site to prep side for building of future power plan Date: April 16, 2007Permit id: Com2007-11703 | |||||
(use) use premises as a central plant facility (utility) Date: July 24, 2006Permit id: Use2006-01671 | |||||
Reinstate permit#com2005-29168 for final inspection. Original permit description:(com2005-29168)amend permit# com2005-07405 (plans 2005-337) to add gas gas booster pump. Add name of plumbing gas and hvac contractor. Date: June 22, 2006Permit id: Com2006-19203 | |||||
Request for time extension on permit # com2005-07405 issued on 6/9/05 with original completion date of 6/9/06 to extend timeoriginal permit description:(com2005-07405)the project is construction of a new cental power plant equipped to generate power he Date: May 30, 2006Permit id: Com2006-16526 | |||||
"replaced existing bulk heads as per plans.""this permit is not a license to do work that would constitute an encroachment on adjacent property or a violation of any easement or right of way of record and it is the applicants responsibility to obtain appro" Date: May 18, 2006 Value: $1,041,309Permit id: Com2005-17953 | |||||
Install low voltage controls Date: April 20, 2006 Value: $27,000Permit id: Com2006-12474 | |||||
Mass grading and sediment and erosion controls of site to prep side for building of future power plant. Approx. 90 c. Y. Of dirt to be moved. Date: April 13, 2006 Value: $50,000Permit id: Com2005-07404 | |||||
Temporary service inspection install (2) 12 amp and 13. 2 kva. Date: March 10, 2006 Value: $300,000Permit id: Com2006-08241 | |||||
Provide fire alarm system for canton central plant two-story garage as per plans and code. Date: March 1, 2006 Value: $5,200Permit id: Com2005-39832 | |||||
Amend permit# com2005-07405 issued on 6/9/05 to include cusic cotten t/a cotten construction co. Inc. As onsite utiltiy contractor. Date: February 3, 2006Permit id: Com2006-03916 | |||||
Amend permit # com2005-issued 6/9/05 with plan # 2005-337 to add electrical contractor Date: November 7, 2005Permit id: Com2005-34117 | |||||
Installation of automatic fire protection system consisting of 368 heads. Date: October 27, 2005 Value: $52,000Permit id: Com2005-27444 | |||||
Elect work for the addition of 11 panels and 8 transformer general lighting and recepts. 181 ckts. (exist bldg permit no. Com2005-07405 with plans no. 2005-337) Date: August 4, 2005 Value: $300,000Permit id: Com2005-23142 | |||||
Amend permit#com2005-07405 issued on 6-9-05 w/plans#2005-337 to name electrical contracto as stated above. Date: July 19, 2005Permit id: Com2005-21108 | |||||
Construction of a pre-fab water tower as per plans. Per pud # 109 ordinance # 04-373 approved 12/2/04 ord # 03-641 approved 12/04 03 ord # 02-369 approved 7/1/02 and ord # 01-192 approved 7/21/ 01 and final design of the planning commissiion Date: July 15, 2005 Value: $50,000Permit id: Com2005-15062 | |||||
Amend permit #com2005-07405 issued 6/9/05 to name sub-contractors as stated above. Date: July 14, 2005Permit id: Com2005-20534 | |||||
The project is construction of a new cental power plant equipped to generate power heating and cooling for the entire campus of the canton crossing waterfront development. The primary and initial purpose of the power plant is to provide necessary utiliti Date: June 9, 2005 Value: $7,000,000Permit id: Com2005-07405 | |||||
Partial permit subject to all conditions of agreement on file to includes sediment control & erosion control devices dewatering excavation grading paving utilities installation caissons footing and foundation wall construction for central power plan Date: May 16, 2005 Value: $2,500,000Permit id: Com2005-12867 | |||||
Temporary power. Install mask and temporary power panel 1 amp and panel cable and grounding. One new meter. Date: November 3, 2004 Value: $1,250Permit id: Com2004-27594 | |||||
Annual test of backflows (6). 1. Boiler rm wilkins 375 l22348 3". 2. Sprinkler rm wilkins 375 l22461 8". 3. Chilled water make up 6" wilkins 375a x00530. 4. Dcw-11 chilled water make up wilkins 975xl w204376 2". 5. Mech rm utility rm watts 009m2qt 332073 2". 6. Sprinkler rm amcs 2000ss 1459 6" as per code. Date: June 17, 2016 Value: $1,500Expiration date: December 17, 2016 | Permit id: Com2016-15703 | |||||
Request for time extension on permit com2005-07404 issued on 04/13/07 with original completion date of 10/28/08. Original permit description:(com2005-07404)mass grading and sediment and erosion controls of site to prep side for building of future power plant. Approx. 90 c. Y. Of dirt to be moved. Date: October 29, 2008Expiration date: April 28, 2009 | Permit id: Com2008-28995 | |||||
Request for time extension on permit com2005-07404 issued on 04/13/2007 with orginal completion date of 04/15/2008. Original permit description:(com2005-07404)mass grading and sediment and erosion controls of site to prep side for building of future power plant. Approx. 90 c. Y. Of dirt to be moved. Date: April 25, 2008Expiration date: October 28, 2008 | Permit id: Com2008-11759 | |||||
Test total of (5) back flow devices. 8" wilkens 375 s/n l22461 main water room rpz as per code. 6" wilkens 375 a s/n yod5 chilled water make up rpz. 3" wilkens 375 s/n l22348 double c/k dcw-8. 2" wilkens 975xl s/n w203475 dcw-11 rpz room. 6" ames s/n 0808 model#200055 double c/k valve on fire line. All work done to code. Date: September 6, 2011 Value: $1,250Expiration date: March 6, 2012 | Permit id: Com2011-19285 | |||||
Non structural alterations: interior work; test total of 5 backflows devices- 8 wilkens 375 s/n l22461 main water rm rp2. 6" wilkens 375 a s/n yod5 chillcol water make up rp2 3" wilkens 375 s/n l22348 double check dcw-8 2" wilkens 975xl s/n w203475 dcw-11 rp2 rm 6" ams s/n 0808 model#200055 double check valve on fire line as per code. Date: April 24, 2012 Value: $3,000Expiration date: October 24, 2012 | Permit id: Com2012-08149 | |||||
Request for time extension on permit #com2005-07404 issued on 4-13-06 with original completion date of 4-13-07. Original permit description:(com2005-07404)mass grading and sediment and erosion controls of site to prep side for building of future power plant. Approx. 90 c. Y. Of dirt to be moved. Date: April 16, 2007Expiration date: October 16, 2007 | Permit id: Com2007-11703 | |||||
Request for time extension on permit#com2005-17953 issued on 5-18-06 with original completion date of 5-18-07original permit description:(com2005-17953)replaced existing bulk heads as per plans. This permit is not a license to do work that would constitute an encroachment on adjacent property or a violation of any easement or right of way of record and it is the applicants responsibility to obtain appropriate survey or title work if necessary. Please note that the building official will not intervene in disputes relating to private property interests."" Date: May 22, 2007Expiration date: November 22, 2007 | Permit id: Com2007-15738 | |||||
Request for time extension on permit com2005-08404 issued on 4/13/07 with original completion date of 10/16/07original permit description:(com2005-07404)mass grading and sediment and erosion controls of site to prep side for building of future power plant. Approx. 90 c. Y. Of dirt to be moved. Date: October 15, 2007Expiration date: April 15, 2008 | Permit id: Com2007-31862 | |||||
Extend permit#183075 issued on 3-1-02 to complete grading as per plan#2002 125. Date: July 17, 2003 Value: $5,000Expiration date: July 17, 2004 | Permit id: Com2003-31402 | |||||
The project is construction of a new cental power plant equipped to generate power heating and cooling for the entire campus of the canton crossing waterfront development. The primary and initial purpose of the power plant is to provide necessary utilities for the canton crossing tower a 17 story office bldg which is under construction. The central plant is poured in place concrete structure of 579 0 cubic feet and it is being designed to support future five levels of parking garage and five floors of office space. Separate permit will be required for sprinkler system and sign. Per pud #109 ordinance # 01-192 approved 6/21/01 and final design of the planning commission of 3/24/05 c/o required on a seperate form upon completion Date: June 9, 2005 Value: $7,000,000Expiration date: June 9, 2006 | Permit id: Com2005-07405 | |||||
Partial permit subject to all conditions of agreement on file to includes sediment control & erosion control devices dewatering excavation grading paving utilities installation caissons footing and foundation wall construction for central power plant building pending action on application for plan # 337 (2005) the issuance of the general permit and the understanding that the engineer/architect will comply with the baltimore city building fire and related codes 2003 as per plans. Date: May 16, 2005 Value: $2,500,000Expiration date: May 16, 2006 | Permit id: Com2005-12867 | |||||
Construction of a pre-fab water tower as per plans. Per pud # 109 ordinance # 04-373 approved 12/2/04 ord # 03-641 approved 12/04 03 ord # 02-369 approved 7/1/02 and ord # 01-192 approved 7/21/ 01 and final design of the planning commissiion of 3/24/05 c/o required on a seperate form upon completion Date: July 15, 2005 Value: $50,000Expiration date: July 15, 2006 | Permit id: Com2005-15062 | |||||
Replaced existing bulk heads as per plans."this permit is not a license to do work that would constitute an encroachment on adjacent property or a violation of any easement or right of way of record and it is the applicants responsibility to obtain appropriate survey or title work if necessary. Please note that the building official will not intervene in disputes relating to private property interests." Date: May 18, 2006 Value: $1,041,309Expiration date: May 18, 2007 | Permit id: Com2005-17953 | |||||
Request for time extension on permit # com2005-07405 issued on 6/9/05 with original completion date of 6/9/06 to extend timeoriginal permit description:(com2005-07405)the project is construction of a new cental power plant equipped to generate power heating and cooling for the entire campus of the canton crossing waterfront development. The primary and initial purpose of the power plant is to provide necessary utilities for the canton crossing tower a 17 story office bldg which is under construction. The central plant is poured in place concrete structure of 579 0 cubic feet and it is being designed to support future five levels of parking garage and five floors of office space. Separate permit will be required for sprinkler system and sign. Per pud #109 ordinance # 01-192 approved 6/21/01 and final design of the planning commission of 3/24/05 c/o required on a seperate form upon completion Date: May 30, 2006Expiration date: November 30, 2006 | Permit id: Com2006-16526 | |||||
Request for time extension on permit#com2005-17953 issued on 5-18-06 with original completion date of 5-18-07original permit description:(com2005-17953)replaced existing bulk heads as per plans."this permit is not a license to do work that would constitute an encroachment on adjacent property or a violation of any easement or right of way of record and it is the applicants responsibility to obtain appropriate survey or title work if necessary. Please note that the building official will not intervene in disputes relating to private property interests." Date: May 22, 2007Expiration date: November 22, 2007 | Permit id: Com2007-15738 | |||||
Request for time extension on permit com2005-07404 issued on 04 13 07 with original completion date of 10 28 08. Original permit description:(com2005-07404)mass grading and sediment and erosion controls of site to prep side for building of future power plant. Approx. 90 c. Y. Of dirt to be moved. Date: October 29, 2008Expiration date: April 28, 2009 | Permit id: Com2008-28995 | |||||
Request for time extension on permit com2005-07404 issued on 04 13 2007 with orginal completion date of 04 15 2008. Original permit description:(com2005-07404)mass grading and sediment and erosion controls of site to prep side for building of future power plant. Approx. 90 c. Y. Of dirt to be moved. Date: April 25, 2008Expiration date: October 28, 2008 | Permit id: Com2008-11759 | |||||
The project is construction of a new cental power plant equipped to generate power heating and cooling for the entire campus of the canton crossing waterfront development. The primary and initial purpose of the power plant is to provide necessary utilities for the canton crossing tower a 17 story office bldg which is under construction. The central plant is poured in place concrete structure of 579 0 cubic feet and it is being designed to support future five levels of parking garage and five floors of office space. Separate permit will be required for sprinkler system and sign. Per pud #109 ordinance # 01-192 approved 6 21 01 and final design of the planning commission of 3 24 05 c o required on a seperate form upon completion Date: June 9, 2005 Value: $7,000,000Expiration date: June 9, 2006 | Permit id: Com2005-07405 | |||||
Partial permit subject to all conditions of agreement on file to includes sediment control & erosion control devices dewatering excavation grading paving utilities installation caissons footing and foundation wall construction for central power plant building pending action on application for plan # 337 (2005) the issuance of the general permit and the understanding that the engineer architect will comply with the baltimore city building fire and related codes 2003 as per plans. Date: May 16, 2005 Value: $2,500,000Expiration date: May 16, 2006 | Permit id: Com2005-12867 | |||||
Construction of a pre-fab water tower as per plans. Per pud # 109 ordinance # 04-373 approved 12 2 04 ord # 03-641 approved 12 04 03 ord # 02-369 approved 7 1 02 and ord # 01-192 approved 7 21 01 and final design of the planning commissiion of 3 24 05 c o required on a seperate form upon completion Date: July 15, 2005 Value: $50,000Expiration date: July 15, 2006 | Permit id: Com2005-15062 | |||||
Amend permit#com2005-07405 issued on 6-9-05 w plans#2005-337 to name electrical contracto as stated above. Date: July 19, 2005Expiration date: June 9, 2006 | Permit id: Com2005-21108 | |||||
Amend permit # com2005-issued 6 9 05 with plan # 2005-337 to add electrical contractor Date: November 7, 2005Expiration date: June 9, 2006 | Permit id: Com2005-34117 | |||||
Amend permit# com2005-07405 issued on 6 9 05 to include cusic cotten t a cotten construction co. Inc. As onsite utiltiy contractor. Date: February 3, 2006Expiration date: June 9, 2006 | Permit id: Com2006-03916 | |||||
Request for time extension on permit # com2005-07405 issued on 6 9 05 with original completion date of 6 9 06 to extend timeoriginal permit description:(com2005-07405)the project is construction of a new cental power plant equipped to generate power heating and cooling for the entire campus of the canton crossing waterfront development. The primary and initial purpose of the power plant is to provide necessary utilities for the canton crossing tower a 17 story office bldg which is under construction. The central plant is poured in place concrete structure of 579 0 cubic feet and it is being designed to support future five levels of parking garage and five floors of office space. Separate permit will be required for sprinkler system and sign. Per pud #109 ordinance # 01-192 approved 6 21 01 and final design of the planning commission of 3 24 05 c o required on a seperate form upon completion Date: May 30, 2006Expiration date: November 30, 2006 | Permit id: Com2006-16526 | |||||
Test total of (5) back flow devices. 8" wilkens 375 s n l22461 main water room rpz as per code. 6" wilkens 375 a s n yod5 chilled water make up rpz. 3" wilkens 375 s n l22348 double c k dcw-8. 2" wilkens 975xl s n w203475 dcw-11 rpz room. 6" ames s n 0808 model#200055 double c k valve on fire line. All work done to code. Date: September 6, 2011 Value: $1,250Expiration date: March 6, 2012 | Permit id: Com2011-19285 | |||||
Amend permit #com2005-07405 issued 6 9 05 to name sub-contractors as stated above. Date: July 14, 2005Expiration date: January 14, 2006 | Permit id: Com2005-20534 | |||||
Grading maintenance repairs of eroded areasas per plans as per code. Date: June 5, 2012 Value: $12,500Expiration date: June 5, 2013 | Permit id: Com2011-26685 | |||||
Request for time extension on permit com2005-08404 issued on 4 13 07 with original completion date of 10 16 07original permit description:(com2005-07404)mass grading and sediment and erosion controls of site to prep side for building of future power plant. Approx. 90 c. Y. Of dirt to be moved. Date: October 15, 2007Expiration date: April 15, 2008 | Permit id: Com2007-31862 | |||||
Non structural alterations: interior work; test total of 5 backflows devices- 8 wilkens 375 s n l22461 main water rm rp2. 6" wilkens 375 a s n yod5 chillcol water make up rp2 3" wilkens 375 s n l22348 double check dcw-8 2" wilkens 975xl s n w203475 dcw-11 rp2 rm 6" ams s n 0808 model#200055 double check valve on fire line as per code. Date: April 24, 2012 Value: $3,000Expiration date: October 24, 2012 | Permit id: Com2012-08149 | |||||
Install illuminated directory sign 1 tall x 44 1 2 wide of aluminum cabinet and pan faces; vinyl graphics and digitally printed compass. Date: July 28, 2011 Value: $8,400Expiration date: January 28, 2012 | Permit id: Com2010-09148 |