ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
A total of soil borings, using direct push, will be advanced to feet below grade for soil and groundwater sampling. Drilling equipment will be decontaminated between each boring. The temporary wells will be abandoned within 24 hours of installation and according to the protocols stated in the attached work plan. Date: July 23, 2014Client: State Farm Mutual Automobile Insurance Company | Applicant: Advantage Environmental Consultants | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400381 | |||||
SCORE 79 A total of soil borings, using direct push, will be advanced to feet below grade for soil and groundwater sampling. Drilling equipment will be decontaminated between each boring. The temporary wells will be abandoned within 24 hours of installation and according to the protocols stated in the attached work plan. Date: July 23, 2014 Contractor: Advantage Environmental ConsultantsClient: State Farm Mutual Automobile Insurance Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400381 | |||||
SCORE 56 Using hollow stem auger method, we will drill 4 test borings. Proposed test borings depths are feet. All the spoils will be containerized in 55-gallon drums and sent for disposal upon review of chemical results. The bore holes will be grouted with a 60: ratio of bentonite powder to cement for paved area, and grouted with 2 pounds of bentonite powder to 1 gallon of water for the borings that are located in non-paved areas. Date: February 17, 2017Client: State Farm Mutual Automobile Insurance Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700147 |