Construct intersection driveway ,sidewalk removal and curb and gutter, handicap ramp @ 14995 shady grove rd. Required contact mc-dps inspector john h. Loevy @301-370-3689 subject to the conditions noted. Complete repair & restoration of the right of way shall be made, "in-kind", of any and all damages done to the existing improvement in the public right-of-way caused by construction operation on this site. All lane and sidewalk closures and other required traffic controls shall comply with the approved traffic control and ada plan and the directions of the mc. Dps right-of-way inspector. Trees removal based on dna approval . Date: August 14, 2012Permit type: Public right of way | Permit status: Completed | Current use: Public right-of-way | Permit id: 272788 | |||||
Must check mcdot paving projects schedule and have preconstruction meeting with dps row inspector prior to beginning of construction. Make existing pole a double cable pole. Pull cable through customer built conduit and associated equipment in accordance with pepco plan no. 3406343. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county Date: March 22, 2013Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 289136 | |||||
Remove overhead transformers and associated equipment in accordance with pepco plan no. 3436858. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: October 24, 2014Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 323639 | |||||
Must check mcdot paving projects schedule and have preconstruction meeting with dps row inspector prior to beginning of construction. Install pole,overhead transformers,wire and associated equipment in accordance with pepco plan no. 3400470. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifica Date: January 16, 2013Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 285979 |