ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Temporary construction entrance stabilized construction entrance off of homecrest road. Constructed access path needed for truck access to manhole for sewer lining. Proper precautions must be taken to keep the roadways free of mud, debris or other obstructions. Prior to release this permit remove construction entrance. Complete repair (restoration of right of way including haul routes) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Work shall be complete as directed by the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Md dnr permit and mc dps tree protection plan approval are required prior to remove street trees Date: October 12, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 354819 |