ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Temporary occupancy of public right-of-way: full traffic closure Date: September 27, 2016Permit status: Issued | Permit id: Top-2016-0400 | |||||
Sidewalk, curb, driveway repairs Date: May 2, 2016Permit status: Closed-repaired | Completion date: June 6, 2016 | Permit id: Sw-Per-2016-002 | |||||
Inst sq ft parking sgn per plans set back and max ht of 6 ft for grcc parking lot Date: November 8, 2004 Value: $6,000Permit status: Closed-finaled | Permit id: B04-18221 | |||||
Permit pulled. Kld Date: August 5, 2015Permit status: Closed-repaired | Completion date: August 5, 2015 | Permit id: Sw-Per-2015-010 | |||||
Complete interior remodel, exterior brick cleaning and tuck pointing, new roof top mechanical unit and screening. Date: July 14, 2016 Value: $5,550,000Permit status: Waiting to inspect | Permit id: Bc-Reno-2016-08 | |||||
Demolition of existing exterior entrance stairs & bicycle rack (alcove), replace with new exterior entrance stairs; removal of existing landscaping and replace with new landscaping. Date: June 26, 2017 Value: $21,500Permit status: Waiting for u and o | Permit id: Bc-Reno-2017-08 | |||||
The project consists of removing existing concrete stairs, sidewalk and retaining walls and reconstructing new concrete stairs to provide more capacity as well as built-in seating areas for students. Removal of the existing sidewalk is required for construction of footings and for grade transitions between the existing sidewalk to remain and the new stairs. Date: June 27, 2017Permit status: Closed-issued | Completion date: June 27, 2017 | Permit id: Encr-2017-0034 | |||||
Temporary occupancy of public right-of-way: sidewalk, traffic lane Date: July 25, 2017Permit status: Issued | Permit id: Top-2017-0335 | |||||
Removal and replacement of entry stairs Date: June 19, 2017Permit status: Monitor | Permit id: L-Dev-2017-0229 |