Install camera systemfaxed Date: November 20, 2014Permit type: Intake | Permit status: Closed | Completion date: November 20, 2014 | Permit id: 2014-240510-000 | |||||
(2) mini splits for insulated switch gear room. Exterior condenser units. One inside head each unit. Date: January 6, 2015Permit type: Intake | Permit status: Closed | Completion date: January 6, 2015 | Permit id: 2015-101405-000 | |||||
Demolish former rail scale office building; two story modular office building with stairs; slab on grade will not be removed Date: March 27, 2015Permit type: Application | Permit status: Approved | Completion date: March 27, 2015 | Permit id: 2015-140823-000 | |||||
Annual holding tank inspection Date: April 29, 2015Permit type: Intake | Permit status: Approved | Completion date: April 29, 2015 | Permit id: 2015-161079-000 | |||||
Interior only-modify diameter 2# natural gas line to make room for new equipment access door, equipment door to be installed by others Date: May 7, 2015Permit type: Intake | Permit status: Approved | Completion date: May 7, 2015 | Permit id: 2015-165683-000 | |||||
503289 pm4 oregon steel millinstall (2) 1 conduit underground-(2) branch circuits-(2)vfds & connect well pumps. Mike greene 503-730-7012 Date: May 8, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: August 26, 2014 | Permit id: 2014-154576-000 | |||||
Annual holding tank inspection Date: July 2, 2014Permit type: Intake | Permit status: Approved | Completion date: July 1, 2014 | Permit id: 2014-177703-000 | |||||
Install conduit for cameras Date: July 7, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: July 8, 2014 | Permit id: 2014-179629-000 | |||||
Install lights in connex Date: September 16, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: October 17, 2014 | Permit id: 2014-213185-000 | |||||
Replace existing light. Date: September 18, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: October 31, 2014 | Permit id: 2014-214715-000 | |||||
Relocate protective relay cabinet. Date: September 18, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: October 14, 2014 | Permit id: 2014-214729-000 | |||||
Add 2 pole lights at double jointer. Date: September 23, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: October 31, 2014 | Permit id: 2014-216679-000 | |||||
Replace line drive inverter/vfds. Install temp feeder for commissioning and branch circuits for control Date: October 1, 2014Permit type: Intake | Permit status: Closed | Completion date: September 23, 2014 | Permit id: 2014-216695-000 | |||||
Construct 3 new blast walls Date: October 6, 2014Permit type: Application | Permit status: Approved | Completion date: September 30, 2014 | Permit id: 2014-219299-000 | |||||
Double joiner warning lights Date: October 13, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: October 31, 2014 | Permit id: 2014-224690-000 | |||||
Zoning confirmation request Permit type: Land use review | Permit status: Closed | Completion date: October 28, 2014 | Permit id: 2014-231226-000 | |||||
Zoning confirmation request Permit type: Land use review | Permit status: Letter sent | Completion date: November 24, 2014 | Permit id: 2014-231226-000 | |||||
Build an 11x22 steel shed to house some switch gears Date: November 10, 2014Permit type: Application | Permit status: Approved | Completion date: November 10, 2014 | Permit id: 2014-236183-000 | |||||
Dsl waterway lease Permit type: Land use review | Permit status: Closed | Completion date: August 12, 2004 | Permit id: 2004-041272-000 | |||||
Extend existing circuit for new rail scale exterior lights. Date: August 25, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: October 12, 2015 | Permit id: 2015-224768-000 | |||||
Field wiring of two spray booths Date: October 12, 2015Permit type: Intake | Permit status: Closed | Completion date: September 28, 2015 | Permit id: 2015-243170-000 | |||||
Two 30amp, 480v, 3 phase branch circuits Date: October 9, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: November 9, 2015 | Permit id: 2015-249141-000 | |||||
Install new mcc section, rto panel and controls, new air compressor Date: October 27, 2015Permit type: Intake | Permit status: Closed | Completion date: October 13, 2015 | Permit id: 2015-249958-000 | |||||
Install 2 amp service to trailer Date: October 20, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: February 8, 2016 | Permit id: 2015-253030-000 | |||||
Sprinklers-add sprinklers to accomodate additon of two new spray booths Date: October 29, 2015Permit type: Intake | Permit status: Approved | Completion date: October 22, 2015 | Permit id: 2015-254746-000 | |||||
Install 2 new paint booths inside of existing service building Date: October 28, 2015Permit type: Application | Permit status: Approved | Completion date: October 23, 2015 | Permit id: 2015-255291-000 | |||||
Install 1 make up air unit for 2 new paint booths, and vent booths to exterior, building area is7,6 sf, booth is 288 sf = , 10% of building area, exhaust at 6 above roof & > to propertly line, df mau located outside., plans w/co Date: October 28, 2015Permit type: Intake | Permit status: Closed | Completion date: October 27, 2015 | Permit id: 2015-255292-000 | |||||
Paint booth - install (2) industrial paint booths in service building Date: November 5, 2015Permit type: Intake | Permit status: Approved | Completion date: October 28, 2015 | Permit id: 2015-257357-000 | |||||
New 1 story modular building to be placed on the property for an employee lunchroom; new steel foundation; Date: December 30, 2015Permit type: Application | Permit status: Approved | Completion date: October 29, 2015 | Permit id: 2015-257819-000 | |||||
Revision to change from stick framed ramp to an aluminum accessible ramp system Permit type: Application | Permit status: Approved | Completion date: February 5, 2016 | Permit id: 2015-257819-Rev | |||||
Revision to change from stick framed ramp to an aluminum accessible ramp system Permit type: Planning and zoning | Permit status: Not reqd | Completion date: February 5, 2016 | Permit id: 2015-257819-Rev | |||||
Install temporary patch panel and data drops Date: November 9, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: December 14, 2015 | Permit id: 2015-262416-000 | |||||
Install light pole in scrap yard Date: November 9, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: January 26, 2016 | Permit id: 2015-262426-000 | |||||
Category 6 cabling upgrade Date: November 11, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: February 23, 2016 | Permit id: 2015-263547-000 | |||||
Add lineal ft sanitary sewer line and lineal ft water line on property, installed off of main gate entrance near safety trailer off of n ramsey st. Date: January 7, 2016Permit type: Intake | Permit status: Closed | Completion date: January 7, 2016 | Permit id: 2016-101850-000 | |||||
Install 6 light fixtures on rail scale bldg. Date: May 22, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: December 28, 2015 | Permit id: 2015-174747-000 | |||||
Dsl waterway lease Permit type: Land use review | Permit status: Closed | Completion date: August 12, 2004 | Permit id: 2004-041272-000 | |||||
Install 1 make up air unit for 2 new paint booths, and vent booths to exterior, building area is7,6 sf, booth is 288 sf = , 10% of building area, exhaust at 6 above roof & > to propertly line, df mau located outside., plans w co Date: October 28, 2015Permit type: Intake | Permit status: Closed | Completion date: October 27, 2015 | Permit id: 2015-255292-000 | |||||
Revision to change from stick framed ramp to an aluminum accessible ramp system Permit type: Application | Permit status: Approved | Completion date: February 5, 2016 | Permit id: 2015-257819-Rev | |||||
Revision to change from stick framed ramp to an aluminum accessible ramp system Permit type: Planning and zoning | Permit status: Not reqd | Completion date: February 5, 2016 | Permit id: 2015-257819-Rev | |||||
New car port like structure to shelter tranfer location of slag to transport vehicle Date: February 12, 2001Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: February 3, 2004 | Current use: Factory/industrial | Permit id: 2001-102165-000 | |||||
[16-jan-09] cancelled by zarrj. New 220,0 sf metal building, no interior plumbing in this permit. Ok to reactivate permit to receive final inspection only Date: August 17, 2005Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: April 10, 2013 | Current use: Factory/industrial | Permit id: 2005-117941-000 | |||||
Addition to (e) building to expand roll shop Date: May 13, 2005Client: North Portland Neighborhood Services | Permit type: Addition | Permit status: Final | Completion date: October 4, 2006 | Current use: Factory/industrial | Permit id: 2005-113893-000 | |||||
One story metal building addition to laboratory facility; new steel mezzanine and concrete foundation Date: June 15, 2005Client: North Portland Neighborhood Services | Permit type: Addition | Permit status: Final | Completion date: March 10, 2006 | Current use: Factory/industrial | Permit id: 2005-124391-000 | |||||
108,0 sf coating mill, shell only no occupancy with this permit Date: June 21, 2006Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: January 13, 2009 | Current use: Factory/industrial | Permit id: 2005-165529-000 | |||||
Ti for coating mill Date: August 8, 2006Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: January 13, 2009 | Current use: Factory/industrial | Permit id: 2006-130004-000 | |||||
Work includes pipe storage area, relocation of employee parking, relocation of site entrance and new guard house. Ok to re-activate permit to receive a final inspection only. Droshak 3 1 13 Date: August 11, 2006Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: September 10, 2013 | Current use: Business | Permit id: 2006-129996-000 | |||||
Installation of new concrete pad for 2 oxygen tanks Date: October 13, 2006Client: North Portland Neighborhood Services | Permit type: Addition | Permit status: Final | Completion date: December 18, 2008 | Current use: Business | Permit id: 2006-167067-000 | |||||
New pre-engineered 4,5 sq ft metal storage building with storage mezzanine - not structurally attached to adjacent bldg Date: September 19, 2007Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: January 23, 2008 | Current use: Storage | Permit id: 2007-103574-000 | |||||
Add single story 12x12 mud room vestibule addition to employee entry Date: October 17, 2007Client: North Portland Neighborhood Services | Permit type: Addition | Permit status: Final | Completion date: November 18, 2008 | Current use: Business | Permit id: 2007-170300-000 | |||||
New 2-level prefab modular office and concrete pad foundation. Date: July 28, 2011Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: December 14, 2011 | Current use: Business | Permit id: 2011-107084-000 | |||||
Modular building for office space appeal required, see ls comment. Date: September 20, 2012Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: December 20, 2012 | Current use: Business | Permit id: 2012-133857-000 | |||||
Reinforced concrete foundations for pipe manufacturing and constuction of new rain shelter - see comments Date: May 16, 2013Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: September 19, 2013 | Current use: Business | Permit id: 2013-127749-000 | |||||
New 2 sf rain shelter Date: May 16, 2013Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: September 19, 2013 | Current use: Business | Permit id: 2013-127752-000 | |||||
Two shipping containers welded together to be used to cover conveyer system Date: May 16, 2013Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: September 19, 2013 | Current use: Business | Permit id: 2013-127759-000 | |||||
New construction of 2192 sf building for offices and lunchroom. See 13-1083 for modular demo and constructing and installing parking areas landscaping designated as pa 13 & pa14 with this permit & removal of ivy as groundcover and replace with kinnikinnik as a groundcover within the parking area designated pa1 Date: April 18, 2013Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: November 8, 2013 | Current use: Business | Permit id: 2013-108382-000 | |||||
Install two new walls to convert portion of mens locker room to expanded womens locker room on south side of melt shop, move toilet and sink for womens restroom. Date: April 10, 2013Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: May 7, 2013 | Current use: Business | Permit id: 2013-137681-000 | |||||
Demo 5516 sf existing modular building to be replaced by new construction under permit 13-108382co Date: January 24, 2013Client: North Portland Neighborhood Services | Permit type: Demolition | Permit status: Final | Completion date: March 20, 2013 | Current use: Business | Permit id: 2013-108390-000 | |||||
Two shipping containers welded together and lined with lead shielding Date: May 16, 2013Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: September 19, 2013 | Current use: Business | Permit id: 2013-127762-000 | |||||
Install attic stairs and safety railing to access hvac equipment for maintenance; see parent iq folder Date: May 7, 2014Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: June 12, 2014 | Current use: Business | Permit id: 2014-147038-000 | |||||
New metal roof over unheated portion of lab building and small snow retention fence on roof Date: September 1, 2011Permit type: Alteration | Permit status: Final | Completion date: September 26, 2011 | Current use: Factory/industrial | Permit id: 2011-172934-000 |