ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Apt 2: install / repair window guards: living room : install 1 window guard bedroom 1 : reinstall 1 window guard bedroom 2 : reinstall 1 window Date: December 6, 2011 Value: $123Permit type: Gc | Permit id: Ec14472 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: June 30, 2010 Value: $677Permit type: Delead | Permit id: Eb01237 | |||||
Apt 2: install repair window guards: living room : install 1 window guard bedroom 1 : reinstall 1 window guard bedroom 2 : reinstall 1 window Date: December 6, 2011 Value: $123Permit type: Gc | Permit id: Ec14472 | |||||
Con edison provide gas to boiler / hot water heater. Date: July 1, 2011Permit type: Util | Permit id: Ec01263 | |||||
Con edison provide gas to boiler / hot water heater. Date: March 6, 2012Permit type: Util | Permit id: Ec23949 | |||||
Apt # 2 - room 1es - demo closet. Blocking fire door. Remove all rubbish. Install new steel fire door complet. Restore to proper working order. Remo Date: June 11, 2010Permit type: Gc | Permit id: Ea37908 | |||||
Con edison provide gas to boiler / hot water heater. Date: July 1, 2014Permit type: Util | Permit id: Ef01929 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: August 23, 2010Permit type: Delead | Permit id: Eb07667 | |||||
Con edison provide gas to boiler / hot water heater. Date: July 1, 2013Permit type: Util | Permit id: Ee02389 | |||||
Con edison provide gas to boiler / hot water heater. Date: April 30, 2010Permit type: Util | Permit id: Ea33896 | |||||
Dismantle and remove existing illegall gas pipes at basement meter and install new gas supply pipe to restore gas service to apt. #2. All debris mus Date: May 19, 2010Permit type: Plumb | Permit id: Ea35640 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: July 15, 2010Permit type: Delead | Permit id: Eb03915 | |||||
Con edison provide electric to building public areas and heating plant / hot water heater. Date: July 1, 2010Permit type: Util | Permit id: Eb02800 | |||||
Apt# 2, kitchen : reinstall (2) window guard complete with stops (2). Bedroom 1 : reinstall (1) window guard complete with stops. Bedroom ( Date: May 20, 2010Permit type: Gc | Permit id: Ea34704 | |||||
Basement: legalize existing gas fired hot water heater,pay all penalties perform this work in conjunctoin with omo#ea35640. All debris must be removed Date: June 14, 2010Permit type: Heat | Permit id: Ea38639 | |||||
Con edison provide electric to building public areas and heating plant hot water heater. Date: April 30, 2010Permit type: Util | Permit id: Ea33897 | |||||
Con edison provide gas to boiler hot water heater. Date: July 1, 2010Permit type: Util | Permit id: Eb02799 | |||||
Con edison provide gas to boiler hot water heater. Date: July 1, 2012Permit type: Util | Permit id: Ed00982 | |||||
Con edison provide gas to boiler hot water heater. Date: July 1, 2013Permit type: Util | Permit id: Ee02389 | |||||
Con edison provide gas to boiler hot water heater. Date: July 1, 2014Permit type: Util | Permit id: Ef01929 | |||||
Con edison provide gas to boiler hot water heater. Date: July 1, 2011Permit type: Util | Permit id: Ec01263 |