| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Improvements to existing materials recovery facility offices with a proposed 1,2 square second floor expansion, with proposed interior improvements to first floor restrooms and second floor office areas (appx 1,0 square foot) Date: April 20, 2016Client: Monterey Regional Waste Management District | Permit type: Combination | Permit status: Open | Permit id: 16cp01049 | |||||
Improvements to existing materials recovery facility including concrete slab foundations for in floor processing equipment, new building openings for operational maneuvering, interior concrete push walls, with building frame bracing modifications, and sewer connection for new restrooms. Date: April 20, 2016Client: Monterey Regional Waste Management District | Permit type: Combination | Permit status: Open | Permit id: 16cp01055 | |||||
Improvements to existing materials recovery facility with a proposed 11,6 square canopy addition, proposed site grading and drainage, retaining walls for container bins, and electrical power upgrade for future processing equipment Date: April 20, 2016Client: Monterey Regional Waste Management District | Permit type: Combination | Permit status: Open | Permit id: 16cp01053 | |||||
Foundations for new processing equipment, including conveyor pits and equipment foundation to existing slab on grade, and 3 square feet equipment canopy Date: December 23, 2016Client: Monterey Regional Waste Management District | Permit type: Combination | Permit status: Open | Permit id: 16cp03824 | |||||
Revision 05 24 2017: change of the prior proposed electrical power source i. E. Transformer and switchgear location, which will require a new electrical room containing the recycling processing equipment. Revised structural design for plan maintenance room, revised electrical conduit routing from electrical manhole connection to proposed transformer Date: May 24, 2017Client: Monterey Regional Waste Management District | Permit status: Revision submitted | Permit id: 16cp01055-Rev1 | |||||
Demolish 1,525 square feet of existing building, and construct a 1,675 square foot expansion to pre-engineered metal building (pemb) for existing material recovery facility including 1,525 square foot remodel, column and concrete slab foundations, roof framing design, associated grading, and minor electrical lighting relocation. Date: June 8, 2017Client: Monterey Regional Waste Management District | Permit status: Incomplete | Permit id: 17cp01565 |