ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Notice to proceed: stabilize 3rd floor brick facade by inserting spira-lock helical anchors into mortar joints. Mortar joints to be repointed to match existing color texture joint size profile and hardness. Temporary installation of wooden beam throug Date: August 29, 2014 Value: $4,500Permit id: Com2014-18585 | |||||
Notice to proceed bolton hill historic - approved as per notice to proceed: repoint mortar on faÒºade ÔÇô fully repoint 3rd floor spot repoint 2nd floor. Remove mortar joints using tools narrower than the joint. Replac Date: June 12, 2014 Value: $3,500Permit id: Com2014-10597 | |||||
Notice to proceed bolton hill historic - approved as per notice to proceed: repoint mortar on faade fully repoint 3rd floor spot repoint 2nd floor. Remove mortar joints using tools narrower than the joint. Replacement mortar should be compatible with historic masonry and the original mortar mix and must match historic mortar joints in color texture joint size profile and hardness. This faade has very thin mortar joints that must be retained. Repaint windows and door existing color (doitbest f154 graystone manor). Repair downspout. All work to be completed as per plans in chap files. Priv property Date: June 12, 2014 Value: $3,500Expiration date: December 12, 2014 | Permit id: Com2014-10597 | |||||
Notice to proceed: stabilize 3rd floor brick facade by inserting spira-lock helical anchors into mortar joints. Mortar joints to be repointed to match existing color texture joint size profile and hardness. Temporary installation of wooden beam through 3rd story windows. Temporary removal of 3rd floor windows and surrounds to accommodate beam. Replace 2 wooden beams above 2nd floor bay window to match existing and remove /replace bay widnow roof to match existing with additional watertight features. All work to be completed as per plans in chap files interior work 144 sqft: replace two wooden beams on inside with c channels as per codeawc:all work must conform to chap ntp Date: August 29, 2014 Value: $4,500Expiration date: March 1, 2015 | Permit id: Com2014-18585 | |||||
Notice to proceed: stabilize 3rd floor brick facade by inserting spira-lock helical anchors into mortar joints. Mortar joints to be repointed to match existing color texture joint size profile and hardness. Temporary installation of wooden beam through 3rd story windows. Temporary removal of 3rd floor windows and surrounds to accommodate beam. Replace 2 wooden beams above 2nd floor bay window to match existing and remove replace bay widnow roof to match existing with additional watertight features. All work to be completed as per plans in chap files interior work 144 sqft: replace two wooden beams on inside with c channels as per codeawc:all work must conform to chap ntp Date: August 29, 2014 Value: $4,500Expiration date: March 1, 2015 | Permit id: Com2014-18585 |