| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
New electrical control building for pump station Permit type: Application | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Issuance/intake | Permit status: Intake | Completion date: June 15, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Addressing | Permit status: Approved | Completion date: June 30, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Planning and zoning | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Life safety | Permit status: Not reqd | Completion date: June 16, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: June 25, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Environmental services | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Multnomah drainage districts | Permit status: Approved | Completion date: July 2, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Transportation | Permit status: Not reqd | Completion date: June 17, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Transportation | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 16, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Water bureau review | Permit status: Approved | Completion date: July 1, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Parks bureau | Permit status: Not reqd | Completion date: June 16, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Parks bureau | Permit status: Approved | Completion date: July 2, 2015 | Permit id: 2015-183207-000 | |||||
New monopole for pge meter Permit type: Application | Permit status: Approved | Completion date: June 15, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Application | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Issuance/intake | Permit status: Intake | Completion date: June 15, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Process management | Permit status: Closed | Completion date: June 17, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Addressing | Permit status: Approved | Completion date: June 30, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Planning and zoning | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Life safety | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Life safety | Permit status: Not reqd | Completion date: June 9, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: June 25, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Environmental services | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Multnomah drainage districts | Permit status: Approved | Completion date: July 2, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Transportation | Permit status: Not reqd | Completion date: June 17, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Transportation | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 16, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 23, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Parks bureau | Permit status: Not reqd | Completion date: June 16, 2015 | Permit id: 2015-183211-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Application | Permit status: Approved | Completion date: June 15, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Application | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Issuance/intake | Permit status: Intake | Completion date: June 15, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Process management | Permit status: Closed | Completion date: June 17, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Addressing | Permit status: Approved | Completion date: June 30, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Planning and zoning | Permit status: Not reqd | Completion date: June 24, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Life safety | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Life safety | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Environmental services | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Transportation | Permit status: Not reqd | Completion date: June 17, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Transportation | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Transportation | Permit status: Closed | Completion date: June 24, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 23, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Parks bureau | Permit status: Approved | Completion date: June 23, 2015 | Permit id: 2015-183214-000 | |||||
Demolish control building Permit type: Application | Permit status: Approved | Completion date: June 15, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Application | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Issuance/intake | Permit status: Intake | Completion date: June 15, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Planning and zoning | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Life safety | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Life safety | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 23, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Parks bureau | Permit status: Approved | Completion date: June 23, 2015 | Permit id: 2015-183216-000 | |||||
Hazardous-installation of 200kw generator set outdoors. Under shelter with a 3 gallon, double wall subbase fuel tank. Permit type: Intake | Permit status: Approved | Completion date: September 21, 2015 | Permit id: 2015-238435-000 | |||||
Hazardous-installation of 200kw generator set outdoors. Under shelter with a 3 gallon, double wall subbase fuel tank. Permit type: Intake | Permit status: Closed | Completion date: September 21, 2015 | Permit id: 2015-238435-000 | |||||
New electrical control building for pump station Permit type: Application | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Issuance/intake | Permit status: Intake | Completion date: June 15, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Process management | Permit status: Closed | Completion date: July 27, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Process management | Permit status: Closed | Completion date: November 18, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Process management | Permit status: Closed | Completion date: November 23, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Addressing | Permit status: Approved | Completion date: June 30, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Planning and zoning | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Planning and zoning | Permit status: Approved | Completion date: August 3, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Erosion control | Permit status: Approved | Completion date: July 13, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Site development | Permit status: Approved | Completion date: September 10, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Site development | Permit status: Required | Completion date: September 11, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Life safety | Permit status: Approved | Completion date: August 10, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Life safety | Permit status: Approved | Completion date: July 13, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Life safety | Permit status: Not reqd | Completion date: June 16, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Structural | Permit status: Required | Completion date: October 29, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Structural | Permit status: Approved | Completion date: July 31, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Structural | Permit status: Required | Completion date: July 16, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: June 25, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Special inspections review | Permit status: Approved | Completion date: October 29, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Fire bureau | Permit status: Approved | Completion date: September 11, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Environmental services | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Multnomah drainage districts | Permit status: Approved | Completion date: July 2, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Transportation | Permit status: Not reqd | Completion date: June 17, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Transportation | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Water bureau review | Permit status: Approved | Completion date: November 23, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 16, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Water bureau review | Permit status: Approved | Completion date: July 1, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Water bureau review | Permit status: Approved | Completion date: November 19, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Water bureau review | Permit status: Approved | Completion date: August 7, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Parks bureau | Permit status: Not reqd | Completion date: June 16, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Parks bureau | Permit status: Approved | Completion date: July 2, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Issuance | Permit status: Approved | Completion date: November 23, 2015 | Permit id: 2015-183207-000 | |||||
New monopole for pge meter Permit type: Application | Permit status: Approved | Completion date: June 15, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Application | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Issuance/intake | Permit status: Intake | Completion date: June 15, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Process management | Permit status: Closed | Completion date: June 17, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Process management | Permit status: Closed | Completion date: July 27, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Process management | Permit status: Closed | Completion date: November 23, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Addressing | Permit status: Approved | Completion date: June 30, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Planning and zoning | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Erosion control | Permit status: Approved | Completion date: July 13, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Site development | Permit status: Approved | Completion date: July 13, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Life safety | Permit status: Approved | Completion date: August 10, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Life safety | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Life safety | Permit status: Not reqd | Completion date: June 9, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Structural | Permit status: Approved | Completion date: July 31, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Structural | Permit status: Required | Completion date: July 16, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: June 25, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Special inspections review | Permit status: Approved | Completion date: October 29, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Fire bureau | Permit status: Approved | Completion date: July 10, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Environmental services | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Multnomah drainage districts | Permit status: Approved | Completion date: July 2, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Transportation | Permit status: Not reqd | Completion date: June 17, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Transportation | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 16, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 23, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Water bureau review | Permit status: Not reqd | Completion date: July 20, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Parks bureau | Permit status: Not reqd | Completion date: June 16, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Issuance | Permit status: Approved | Completion date: November 23, 2015 | Permit id: 2015-183211-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Application | Permit status: Approved | Completion date: June 15, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Application | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Issuance/intake | Permit status: Intake | Completion date: June 15, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Process management | Permit status: Closed | Completion date: June 17, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Process management | Permit status: Closed | Completion date: July 27, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Process management | Permit status: Closed | Completion date: November 23, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Addressing | Permit status: Approved | Completion date: June 30, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Planning and zoning | Permit status: Not reqd | Completion date: June 24, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Site development | Permit status: Approved | Completion date: September 11, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Life safety | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Life safety | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Structural | Permit status: Required | Completion date: July 16, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Structural | Permit status: Approved | Completion date: July 31, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Special inspections review | Permit status: Approved | Completion date: October 29, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Fire bureau | Permit status: Approved | Completion date: September 25, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Environmental services | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Transportation | Permit status: Not reqd | Completion date: June 17, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Transportation | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Transportation | Permit status: Approved | Completion date: October 20, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Transportation | Permit status: Closed | Completion date: June 24, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 23, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Parks bureau | Permit status: Approved | Completion date: June 23, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Issuance | Permit status: Approved | Completion date: November 23, 2015 | Permit id: 2015-183214-000 | |||||
Demolish control building Permit type: Application | Permit status: Approved | Completion date: June 15, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Application | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Issuance/intake | Permit status: Intake | Completion date: June 15, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Process management | Permit status: Closed | Completion date: November 23, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Planning and zoning | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Erosion control | Permit status: Approved | Completion date: July 13, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Site development | Permit status: Approved | Completion date: September 11, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Life safety | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Life safety | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 23, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Parks bureau | Permit status: Approved | Completion date: June 23, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Issuance | Permit status: Approved | Completion date: November 23, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Permit expiration | Permit status: Extended | Completion date: November 23, 2015 | Permit id: 2015-183216-000 | |||||
Hazardous-installation of 200kw generator set outdoors. Under shelter with a 3 gallon, double wall subbase fuel tank. Permit type: Intake | Permit status: Approved | Completion date: September 21, 2015 | Permit id: 2015-238435-000 | |||||
Hazardous-installation of 200kw generator set outdoors. Under shelter with a 3 gallon, double wall subbase fuel tank. Permit type: Intake | Permit status: Closed | Completion date: September 21, 2015 | Permit id: 2015-238435-000 | |||||
New electrical control building for pump station Permit type: Application | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Issuance/intake | Permit status: Intake | Completion date: June 15, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Process management | Permit status: Closed | Completion date: July 27, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Process management | Permit status: Closed | Completion date: November 18, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Process management | Permit status: Closed | Completion date: November 23, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Addressing | Permit status: Approved | Completion date: June 30, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Planning and zoning | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Planning and zoning | Permit status: Approved | Completion date: August 3, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Erosion control | Permit status: Approved | Completion date: July 13, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Site development | Permit status: Approved | Completion date: September 10, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Site development | Permit status: Required | Completion date: September 11, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Life safety | Permit status: Approved | Completion date: August 10, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Life safety | Permit status: Approved | Completion date: July 13, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Life safety | Permit status: Not reqd | Completion date: June 16, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Structural | Permit status: Required | Completion date: October 29, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Structural | Permit status: Approved | Completion date: July 31, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Structural | Permit status: Required | Completion date: July 16, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: June 25, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Special inspections review | Permit status: Approved | Completion date: October 29, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Fire bureau | Permit status: Approved | Completion date: September 11, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Environmental services | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Multnomah drainage districts | Permit status: Approved | Completion date: July 2, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Transportation | Permit status: Not reqd | Completion date: June 17, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Transportation | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Water bureau review | Permit status: Approved | Completion date: November 23, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 16, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Water bureau review | Permit status: Approved | Completion date: July 1, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Water bureau review | Permit status: Approved | Completion date: November 19, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Water bureau review | Permit status: Approved | Completion date: August 7, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Parks bureau | Permit status: Not reqd | Completion date: June 16, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Parks bureau | Permit status: Approved | Completion date: July 2, 2015 | Permit id: 2015-183207-000 | |||||
New electrical control building for pump station Permit type: Issuance | Permit status: Approved | Completion date: November 23, 2015 | Permit id: 2015-183207-000 | |||||
New monopole for pge meter Permit type: Application | Permit status: Approved | Completion date: June 15, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Application | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Issuance/intake | Permit status: Intake | Completion date: June 15, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Process management | Permit status: Closed | Completion date: June 17, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Process management | Permit status: Closed | Completion date: July 27, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Process management | Permit status: Closed | Completion date: November 23, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Addressing | Permit status: Approved | Completion date: June 30, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Planning and zoning | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Erosion control | Permit status: Approved | Completion date: July 13, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Site development | Permit status: Approved | Completion date: July 13, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Life safety | Permit status: Approved | Completion date: August 10, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Life safety | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Life safety | Permit status: Not reqd | Completion date: June 9, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Structural | Permit status: Approved | Completion date: July 31, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Structural | Permit status: Required | Completion date: July 16, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: June 25, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Special inspections review | Permit status: Approved | Completion date: October 29, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Fire bureau | Permit status: Approved | Completion date: July 10, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Environmental services | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Multnomah drainage districts | Permit status: Approved | Completion date: July 2, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Transportation | Permit status: Not reqd | Completion date: June 17, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Transportation | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 16, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 23, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Water bureau review | Permit status: Not reqd | Completion date: July 20, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Parks bureau | Permit status: Not reqd | Completion date: June 16, 2015 | Permit id: 2015-183211-000 | |||||
New monopole for pge meter Permit type: Issuance | Permit status: Approved | Completion date: November 23, 2015 | Permit id: 2015-183211-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Application | Permit status: Approved | Completion date: June 15, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Application | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Issuance/intake | Permit status: Intake | Completion date: June 15, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Process management | Permit status: Closed | Completion date: June 17, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Process management | Permit status: Closed | Completion date: July 27, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Process management | Permit status: Closed | Completion date: November 23, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Addressing | Permit status: Approved | Completion date: June 30, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Planning and zoning | Permit status: Not reqd | Completion date: June 24, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Site development | Permit status: Approved | Completion date: September 11, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Life safety | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Life safety | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Structural | Permit status: Required | Completion date: July 16, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Structural | Permit status: Approved | Completion date: July 31, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Special inspections review | Permit status: Approved | Completion date: October 29, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Fire bureau | Permit status: Approved | Completion date: September 25, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Environmental services | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Transportation | Permit status: Not reqd | Completion date: June 17, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Transportation | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Transportation | Permit status: Approved | Completion date: October 20, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Transportation | Permit status: Closed | Completion date: June 24, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 23, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Parks bureau | Permit status: Approved | Completion date: June 23, 2015 | Permit id: 2015-183214-000 | |||||
Remove above ground portion of existing wetwell, install new underground vault Permit type: Issuance | Permit status: Approved | Completion date: November 23, 2015 | Permit id: 2015-183214-000 | |||||
Demolish control building Permit type: Application | Permit status: Approved | Completion date: June 15, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Application | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Issuance/intake | Permit status: Intake | Completion date: June 15, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Process management | Permit status: Closed | Completion date: November 23, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Planning and zoning | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Erosion control | Permit status: Approved | Completion date: July 13, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Site development | Permit status: Approved | Completion date: September 11, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Life safety | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Life safety | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 23, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Parks bureau | Permit status: Approved | Completion date: June 23, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Issuance | Permit status: Approved | Completion date: November 23, 2015 | Permit id: 2015-183216-000 | |||||
Demolish control building Permit type: Permit expiration | Permit status: Extended | Completion date: November 23, 2015 | Permit id: 2015-183216-000 | |||||
New electrical control building for pump station Date: May 4, 2016Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Under inspection | Current use: Utility | Permit id: 2015-183207-000 | |||||
Demolish control building Date: May 4, 2016Client: North Portland Neighborhood Services | Permit type: Demolition | Permit status: Final | Completion date: September 6, 2016 | Current use: Utility | Permit id: 2015-183216-000 |