Building Permits at 1406 Ninth St Alameda CA 94501


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 1406 Ninth St Alameda CA 94501 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Convert kitchen to bedroom #1; convert bedroom #1 to kitchen; relocate plumbing; remove non-bearing wall in living room; and re ove non-bearing wall at new kitchen (bldg plbg) 1 27 relocate heater from bedroom closet to kitchen.
Date:  November 12, 2009

Permit type: Building | Permit status: Finaled | Completion date: April 19, 2010 | Permit id: Cb09-0247-Rev1
2009/11/120951406 Ninth St Alameda Ca 94501
Pre-1942 {code enf x07-0294 mm} remodel 64 sqft kitchen, r r water heater & furnace in same locations {bldg elec plum mech, no exterior changes}
Date:  March 26, 2009

Permit type: Building | Permit status: Finaled | Completion date: April 15, 2010 | Permit id: Cb09-0247
2009/03/260951406 Ninth St Alameda Ca 94501
Pre-1942 {code enf x07-0294 mm} ~ upgrade electrical service to 2 amps (o h, meter main combo)
Date:  February 18, 2009

Permit type: Electrical | Permit status: Finaled | Completion date: June 10, 2009 | Permit id: E09-0100
2009/02/180951406 Ninth St Alameda Ca 94501
Pre-1942 ~ "exploratory permit" ~ remove lathe & plaster to expose electrical, plumbing & venting; install sheetrock to code {per m. Meyer, this permit is not subject to code enforcement fees; all elec plum mech work to be done under separate permit}
Date:  February 20, 2009

Permit type: Building | Permit status: Issued | Permit id: B09-0135
2009/02/200951406 Ninth St Alameda Ca 94501
Replace 4 section of sewer lateral (repair) & retest
Date:  November 25, 2008

Permit type: Plumbing | Permit status: Finaled | Completion date: December 12, 2008 | Permit id: P08-0945
2008/11/250951406 Ninth St Alameda Ca 94501
Correct health & safety violations: replaced cracked 4" main on the north side of building; remove the abs from the exterior- north side; verify vent on the north side; (reference permit #p08-0944)
Date:  December 11, 2008

Permit type: Plumbing | Permit status: Finaled | Completion date: December 12, 2008 | Permit id: P08-0981
2008/12/110951406 Ninth St Alameda Ca 94501
Install earthquake shut-off valve (lttle firefighter vagv75:3 4" vertical)
Date:  November 25, 2008

Permit type: Plumbing | Permit status: Finaled | Completion date: November 26, 2008 | Permit id: P08-0944
2008/11/250951406 Ninth St Alameda Ca 94501
Pre-1942 "partial code enforcement" (x07-0294 mm) ~ per michael meyer, only electrical & plumbing work subject to code enforcement ~ remove all exposed romex wire, repair cover all open junction boxes, repair replace all damaged light fixtures switches receptacles as needed (install gfci where required), repair broken water pipes, replace steel pipes with copper at underground locations, replace fixtures as needed, remove all illegal wiring & plumbing in basement. Following items are not subject to code enforcement {work is to correct substandard housing} ~ repairs all windows & doors and finish to match existing, repair handrails at front stairs & porch to meet code bldg elec plum mech, otc design review
Date:  December 31, 2008

Permit type: Building | Permit status: Issued | Permit id: Cb08-0994
2008/12/310951406 Ninth St Alameda Ca 94501
Relocate exit door to courtyard (bldg only)
Date:  November 12, 2009

Permit type: Building | Permit status: Finaled | Completion date: January 14, 2013 | Permit id: Cb09-0248-Rev1
2009/11/120951406 Ninth St Alameda Ca 94501
Pre-1942 create 488 sqft habitable space in basement, existing legal ceiling height & existing slab {2 bedrooms, 1 full bathroom & laundry area; balance of basement space to be storage-only w portion of storage-only ceiling ht of approx 68"}; create new interior stairway from main floor to basement; remove garden window from west elevation & replace w single-hung in same frame; relocate existing furnace to attic; extend gas & water lines; r r exterior finishes as needed to historically-correct finishes bldg elec plum mech
Date:  March 26, 2009

Permit type: Building | Permit status: Finaled | Completion date: January 14, 2013 | Permit id: Cb09-0248
2009/03/260951406 Ninth St Alameda Ca 94501
Convert kitchen to bedroom #1; convert bedroom #1 to kitchen; relocate plumbing; remove non-bearing wall in living room; and re ove non-bearing wall at new kitchen (bldg/plbg) 1/27/ relocate heater from bedroom closet to kitchen.
Date:  December 22, 2009

Permit type: Building | Permit status: Permit finaled | Completion date: April 19, 2010 | Expiration date: December 21, 2012 | Current use: Residential | Permit id: Cb09-0247-Rev1
2009/12/220951406 Ninth St Alameda Ca 94501
Pre-1942 {code enf/x07-0294/mm} remodel 64 sqft kitchen, r/r water heater & furnace in same locations {bldg/elec/plum/mech, no exterior changes}
Date:  August 31, 2009

Permit type: Building | Permit status: Permit finaled | Completion date: April 15, 2010 | Expiration date: August 30, 2012 | Current use: Residential | Permit id: Cb09-0247
2009/08/310951406 Ninth St Alameda Ca 94501
Pre-1942 {code enf/x07-0294/mm} ~ upgrade electrical service to 2 amps (o/h, meter/main combo)
Date:  February 18, 2009

Permit type: Electrical | Permit status: Permit finaled | Completion date: June 10, 2009 | Expiration date: February 18, 2012 | Permit id: E09-0100
2009/02/180951406 Ninth St Alameda Ca 94501
Pre-1942 ~ "exploratory permit" ~ remove lathe & plaster to expose electrical, plumbing & venting; install sheetrock to code {per m. Meyer, this permit is not subject to code enforcement fees; all elec/plum/mech work to be done under separate permit}
Date:  February 20, 2009

Permit type: Building | Permit status: Permit issued | Expiration date: February 20, 2012 | Current use: Residential | Permit id: B09-0135
2009/02/200951406 Ninth St Alameda Ca 94501
Install earthquake shut-off valve (lttle firefighter/vagv75:3/4" vertical)
Date:  November 25, 2008

Permit type: Plumbing | Permit status: Permit finaled | Completion date: November 26, 2008 | Expiration date: November 25, 2011 | Permit id: P08-0944
2008/11/250951406 Ninth St Alameda Ca 94501
Pre-1942 "partial code enforcement" (x07-0294/mm) ~ per michael meyer, only electrical & plumbing work subject to code enforcement ~ remove all exposed romex wire, repair/cover all open junction boxes, repair/replace all damaged light fixtures/switches/receptacles as needed (install gfci where required), repair broken water pipes, replace steel pipes with copper at underground locations, replace fixtures as needed, remove all illegal wiring & plumbing in basement. Following items are not subject to code enforcement {work is to correct substandard housing} ~ repairs all windows & doors and finish to match existing, repair handrails at front stairs & porch to meet code bldg/elec/plum/mech, otc design review
Date:  December 31, 2008

Permit type: Building | Permit status: Permit issued | Expiration date: December 31, 2011 | Current use: Residential | Permit id: Cb08-0994
2008/12/310951406 Ninth St Alameda Ca 94501
Pre-1942 create 488 sqft habitable space in basement, existing legal ceiling height & existing slab {2 bedrooms, 1 full bathroom & laundry area; balance of basement space to be storage-only w/portion of storage-only ceiling ht of approx 68"}; create new interior stairway from main floor to basement; remove garden window from west elevation & replace w/single-hung in same frame; relocate existing furnace to attic; extend gas & water lines; r/r exterior finishes as needed to historically-correct finishes bldg/elec/plum/mech
Date:  August 31, 2009

Permit type: Building | Permit status: Permit finaled | Completion date: January 14, 2013 | Current use: Residential | Permit id: Cb09-0248
2009/08/310951406 Ninth St Alameda Ca 94501
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.