Construct new church (demo house see a/p #561667) person with aggrievences called from 301-873-4327. Revision submitted on 5/3/12 requesting expedited review revision09/18/2012 architectural Date: May 3, 2013 Value: $700,000Permit type: Commercial building | Permit status: Issued | Current use: Assembly building | Permit id: 563023 | |||||
Miracle temple assembly of god-ap #563023 u&o #268618 400amp 277/480v service,400amp mdp,75kva transformer,250amp lvdp,lv1&2,av,s panels,rtu1&2-32hp each,rtu3-16hp,rtu4&5-10hp each revision 5/3/12 800amp 120/240v service, rtu 10@18hp 2@7kw duct heaters- Date: February 24, 2012Permit type: Electrical permit | Permit status: Finaled | Current use: Place of worship | Permit id: 566610 | |||||
Temp for construction Date: February 24, 2012Permit type: Electrical permit | Permit status: Issued | Current use: Assembly building | Permit id: 592008 | |||||
Electrical permit Date: April 10, 2012Permit status: Issued | Current use: Assembly building | Permit id: 595695 | |||||
Construct water and sewer house connections in accordance with wssc plans and specifications. Work shall comply with ada requirements, montgomery county specifications for utility construction permit and the direction of the dps inspector. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures and traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: March 12, 2012Permit type: Public right of way | Permit status: Completed | Current use: Public utility | Permit id: 273292 | |||||
Install gas service in accordance with washington gas plan no. 158268. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: November 16, 2012Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 283138 |