Install 15 lavs, 3 clothes washer, 3 tub/shower, 3 toilets Date: December 16, 2014Permit type: Plumbing inspections | Permit status: Approved | Completion date: May 19, 2015 | Permit id: 2014-249820-000 | |||||
Sprinkler - addition of acoustical ceilings on 4th & 5th floors requires changing coverage of sprinklers in common areas from sidewall to pendent coverage. System is cpvc. Date: January 21, 2015Permit type: Intake | Permit status: Approved | Completion date: December 23, 2014 | Permit id: 2014-253139-000 | |||||
Install receptacle at nurse call locations Date: March 20, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: May 11, 2015 | Permit id: 2015-137510-000 | |||||
Sprinkler - relocate/replace sidwalls with quick response heads on 6th floor for ti Date: June 25, 2015Permit type: Intake | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2015-191950-000 | |||||
Insterior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge/bar area with one new sink, relocate bank and concessions area Permit type: Application | Permit status: Approved | Completion date: July 1, 2015 | Permit id: 2015-195194-000 | |||||
Insterior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge/bar area with one new sink, relocate bank and concessions area Permit type: Planning and zoning | Permit status: Not reqd | Completion date: July 1, 2015 | Permit id: 2015-195194-000 | |||||
Insterior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge/bar area with one new sink, relocate bank and concessions area Permit type: Transportation | Permit status: Not reqd | Completion date: July 1, 2015 | Permit id: 2015-195194-000 | |||||
Approval of exterior alterations - located at the ground level porte-cochere and at the terrace level - at calaroga terrace, which is located in the lloyd subdistrict of the central city plan district. Approval per the approved plans and drawings, exhibits c-1 through c-22, signed and dated june 24, 2014, subject to the following condition:a. As part of the building permit application submittal, each of the four required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c-1 through c-22. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 13-229565 dz. No field changes allowed. Permit type: Land use review | Permit status: Completed | Completion date: November 26, 2013 | Permit id: 2013-229565-000 | |||||
Approval of exterior alterations - located at the ground level porte-cochere and at the terrace level - at calaroga terrace, which is located in the lloyd subdistrict of the central city plan district. Approval per the approved plans and drawings, exhibits c-1 through c-22, signed and dated june 24, 2014, subject to the following condition:a. As part of the building permit application submittal, each of the four required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c-1 through c-22. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 13-229565 dz. No field changes allowed. Permit type: Land use review | Permit status: Closed | Completion date: June 27, 2014 | Permit id: 2013-229565-000 | |||||
Approval of exterior alterations - located at the ground level porte-cochere and at the terrace level - at calaroga terrace, which is located in the lloyd subdistrict of the central city plan district. Approval per the approved plans and drawings, exhibits c-1 through c-22, signed and dated june 24, 2014, subject to the following condition:a. As part of the building permit application submittal, each of the four required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c-1 through c-22. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 13-229565 dz. No field changes allowed. Permit type: Land use review | Permit status: Completed | Completion date: January 17, 2014 | Permit id: 2013-229565-000 | |||||
Approval of exterior alterations - located at the ground level porte-cochere and at the terrace level - at calaroga terrace, which is located in the lloyd subdistrict of the central city plan district. Approval per the approved plans and drawings, exhibits c-1 through c-22, signed and dated june 24, 2014, subject to the following condition:a. As part of the building permit application submittal, each of the four required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c-1 through c-22. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 13-229565 dz. No field changes allowed. Permit type: Land use review | Permit status: Completed | Completion date: June 26, 2014 | Permit id: 2013-229565-000 | |||||
Approval of exterior alterations - located at the ground level porte-cochere and at the terrace level - at calaroga terrace, which is located in the lloyd subdistrict of the central city plan district. Approval per the approved plans and drawings, exhibits c-1 through c-22, signed and dated june 24, 2014, subject to the following condition:a. As part of the building permit application submittal, each of the four required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c-1 through c-22. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 13-229565 dz. No field changes allowed. Permit type: Land use review | Permit status: Completed | Completion date: July 15, 2014 | Permit id: 2013-229565-000 | |||||
Approval of exterior alterations - located at the ground level porte-cochere and at the terrace level - at calaroga terrace, which is located in the lloyd subdistrict of the central city plan district. Approval per the approved plans and drawings, exhibits c-1 through c-22, signed and dated june 24, 2014, subject to the following condition:a. As part of the building permit application submittal, each of the four required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c-1 through c-22. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 13-229565 dz. No field changes allowed. Permit type: Life safety | Permit status: Response sent | Completion date: January 21, 2014 | Permit id: 2013-229565-000 | |||||
Approval of exterior alterations - located at the ground level porte-cochere and at the terrace level - at calaroga terrace, which is located in the lloyd subdistrict of the central city plan district. Approval per the approved plans and drawings, exhibits c-1 through c-22, signed and dated june 24, 2014, subject to the following condition:a. As part of the building permit application submittal, each of the four required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c-1 through c-22. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 13-229565 dz. No field changes allowed. Permit type: Administration | Permit status: Closed | Completion date: July 1, 2015 | Permit id: 2013-229565-000 | |||||
Interior remodel-of common area dining and bathing and nurses station on floors 4, 5, and 6. Date: December 9, 2014Permit type: Application | Permit status: Approved | Completion date: April 17, 2014 | Permit id: 2014-143192-000 | |||||
Trouble shoot ac units and re-configure kitchen outlets Date: July 10, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: July 23, 2014 | Permit id: 2014-182277-000 | |||||
Install new back flow Date: July 16, 2014Permit type: Plumbing inspections | Permit status: Approved | Completion date: July 30, 2014 | Permit id: 2014-184398-000 | |||||
Install electrical for backflow enclosure Date: July 24, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: November 13, 2014 | Permit id: 2014-189016-000 | |||||
Replace lighting and outlets of multiple floors of calaroga terrace Date: August 26, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: June 19, 2015 | Permit id: 2014-203996-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Application | Permit status: Approved | Completion date: September 9, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Issuance/intake | Permit status: Intake | Completion date: September 9, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Process management | Permit status: Closed | Completion date: January 21, 2015 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Process management | Permit status: Closed | Completion date: April 2, 2015 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Process management | Permit status: Closed | Completion date: March 3, 2015 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Planning and zoning | Permit status: Approved | Completion date: January 28, 2015 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Planning and zoning | Permit status: Approved | Completion date: October 9, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Site development | Permit status: Not reqd | Completion date: September 17, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Structural | Permit status: Approved | Completion date: September 12, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Commercial plumbing | Permit status: Approved | Completion date: September 18, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Fire bureau | Permit status: Approved | Completion date: March 13, 2015 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Environmental services | Permit status: Approved | Completion date: September 19, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Transportation | Permit status: Approved | Completion date: September 18, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Transportation | Permit status: Approved | Completion date: September 23, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Transportation | Permit status: Closed | Completion date: September 23, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Water bureau review | Permit status: Not reqd | Completion date: September 15, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Parks bureau | Permit status: Approved | Completion date: September 23, 2014 | Permit id: 2014-209955-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Application | Permit status: Approved | Completion date: September 9, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Issuance/intake | Permit status: Intake | Completion date: September 9, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: December 8, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: March 3, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: May 8, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: May 27, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Planning and zoning | Permit status: Approved | Completion date: October 13, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Site development | Permit status: Approved | Completion date: September 22, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Life safety | Permit status: Approved | Completion date: June 8, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Structural | Permit status: Required | Completion date: March 23, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Structural | Permit status: Approved | Completion date: March 12, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Structural | Permit status: Required | Completion date: September 26, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: September 17, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Special inspections review | Permit status: Approved | Completion date: May 8, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Fire bureau | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Transportation | Permit status: Approved | Completion date: September 18, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Transportation | Permit status: Approved | Completion date: January 29, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Water bureau review | Permit status: Not reqd | Completion date: September 11, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Parks bureau | Permit status: Approved | Completion date: September 23, 2014 | Permit id: 2014-209978-000 | |||||
Pbot pw permit Permit type: Intake pw | Permit status: Assigned | Completion date: November 19, 2014 | Permit id: 2014-228201-000 | |||||
Pbot pw permit Permit type: Intake pw | Permit status: Assigned | Completion date: October 26, 2014 | Permit id: 2014-228201-000 | |||||
Pbot pw permit Permit type: Pre-design pw | Permit status: Not reqd | Completion date: October 28, 2014 | Permit id: 2014-228201-000 | |||||
Pbot pw permit Permit type: Pre-design pw | Permit status: Received | Completion date: October 21, 2014 | Permit id: 2014-228201-000 | |||||
Pbot pw permit Permit type: Pre-design pw | Permit status: Accepted for review | Completion date: October 21, 2014 | Permit id: 2014-228201-000 | |||||
Pbot pw permit Permit type: Pre-design pw | Permit status: Billed | Completion date: October 28, 2014 | Permit id: 2014-228201-000 | |||||
Pbot pw permit Permit type: Plan review pw | Permit status: Not reqd | Completion date: November 19, 2014 | Permit id: 2014-228201-000 | |||||
Pbot pw permit Permit type: Plan review pw | Permit status: Approved | Completion date: May 15, 2015 | Permit id: 2014-228201-000 | |||||
Remodel fourth floor; office, laundry room, restroom - hvac system design approval & permit reqd. Permit type: Application | Permit status: Approved | Completion date: April 13, 2004 | Permit id: 2004-016254-000 | |||||
Remodel fourth floor; office, laundry room, restroom - hvac system design approval & permit reqd. Permit type: Planning and zoning | Permit status: Not reqd | Completion date: April 13, 2004 | Permit id: 2004-016254-000 | |||||
Remodel fourth floor; office, laundry room, restroom - hvac system design approval & permit reqd. Permit type: Life safety | Permit status: Approved | Completion date: April 13, 2004 | Permit id: 2004-016254-000 | |||||
Remodel fourth floor; office, laundry room, restroom - hvac system design approval & permit reqd. Permit type: Structural | Permit status: Not reqd | Completion date: April 13, 2004 | Permit id: 2004-016254-000 | |||||
Remodel fourth floor; office, laundry room, restroom - hvac system design approval & permit reqd. Permit type: Fire bureau | Permit status: Approved | Completion date: April 13, 2004 | Permit id: 2004-016254-000 | |||||
Remodel fourth floor; office, laundry room, restroom - hvac system design approval & permit reqd. Permit type: Transportation | Permit status: Approved | Completion date: April 13, 2004 | Permit id: 2004-016254-000 | |||||
New construction of concrete pad 143 x 47 for generator Date: March 21, 2016Permit type: Application | Permit status: Approved | Completion date: February 16, 2016 | Permit id: 2016-121499-000 | |||||
Remove existing generator from interior and replace with new generator on the new exterior concrete pad see permit16-121499co, 1 kw Date: February 16, 2016Permit type: Intake | Permit status: Closed | Completion date: February 16, 2016 | Permit id: 2016-121510-000 | |||||
Replace existing 1 kw generator with new 1 kw generator Date: March 10, 2016Permit type: Intake | Permit status: Closed | Completion date: February 17, 2016 | Permit id: 2016-122503-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Application | Permit status: Approved | Completion date: March 4, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Issuance/intake | Permit status: Intake | Completion date: March 4, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Process management | Permit status: Closed | Completion date: April 5, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Addressing | Permit status: Not reqd | Completion date: March 7, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Planning and zoning | Permit status: Approved | Completion date: March 28, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Erosion control | Permit status: Not reqd | Completion date: March 4, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Site development | Permit status: Not reqd | Completion date: March 7, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Life safety | Permit status: Approved | Completion date: March 4, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Life safety | Permit status: Not reqd | Completion date: March 4, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Structural | Permit status: Approved | Completion date: March 11, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Fire bureau | Permit status: Approved | Completion date: March 10, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Environmental services | Permit status: Not reqd | Completion date: March 4, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Transportation | Permit status: Not reqd | Completion date: March 4, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Water bureau review | Permit status: Not reqd | Completion date: March 8, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Issuance | Permit status: Approved | Completion date: April 5, 2016 | Permit id: 2016-130628-000 | |||||
Replace existing ramp with new stairs and ramp in same location Date: April 19, 2016Permit type: Application | Permit status: Approved | Completion date: April 19, 2016 | Permit id: 2016-155459-000 | |||||
Approval of exterior alterations - located at the ground level porte-cochere and at the terrace level - at calaroga terrace, which is located in the lloyd subdistrict of the central city plan district. Approval per the approved plans and drawings, exhibits c-1 through c-22, signed and dated june 24, 2014, subject to the following condition:a. As part of the building permit application submittal, each of the four required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c-1 through c-22. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 13-229565 dz. No field changes allowed. Date: June 27, 2014Permit type: Land use review | Permit status: Completed | Completion date: November 26, 2013 | Permit id: 2013-229565-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Application | Permit status: Approved | Completion date: September 9, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Issuance/intake | Permit status: Intake | Completion date: September 9, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Process management | Permit status: Closed | Completion date: January 21, 2015 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Process management | Permit status: Closed | Completion date: March 3, 2015 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Process management | Permit status: Closed | Completion date: April 2, 2015 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Planning and zoning | Permit status: Approved | Completion date: October 9, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Planning and zoning | Permit status: Approved | Completion date: January 28, 2015 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Site development | Permit status: Not reqd | Completion date: September 17, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Structural | Permit status: Approved | Completion date: September 12, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Commercial plumbing | Permit status: Approved | Completion date: September 18, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Fire bureau | Permit status: Approved | Completion date: March 13, 2015 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Environmental services | Permit status: Approved | Completion date: September 19, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Transportation | Permit status: Approved | Completion date: September 18, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Transportation | Permit status: Approved | Completion date: September 23, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Transportation | Permit status: Closed | Completion date: September 23, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Water bureau review | Permit status: Not reqd | Completion date: September 15, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Parks bureau | Permit status: Approved | Completion date: September 23, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Permit expiration | Permit status: Extended | Completion date: August 21, 2015 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Permit expiration | Permit status: Batch expired | Completion date: March 10, 2016 | Permit id: 2014-209955-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Application | Permit status: Approved | Completion date: September 9, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Issuance/intake | Permit status: Intake | Completion date: September 9, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: December 8, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: May 27, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: May 8, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: March 3, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: August 4, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: February 10, 2016 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: January 13, 2016 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: March 15, 2016 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: April 14, 2016 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Planning and zoning | Permit status: Approved | Completion date: October 13, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Site development | Permit status: Approved | Completion date: September 22, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Life safety | Permit status: Approved | Completion date: June 8, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Structural | Permit status: Required | Completion date: March 23, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Structural | Permit status: Approved | Completion date: March 12, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Structural | Permit status: Required | Completion date: September 26, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: September 17, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Special inspections review | Permit status: Approved | Completion date: May 8, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Fire bureau | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Environmental services | Permit status: Approved | Completion date: March 31, 2016 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Transportation | Permit status: Approved | Completion date: September 18, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Transportation | Permit status: Approved | Completion date: January 29, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Transportation | Permit status: Approved | Completion date: February 14, 2016 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Water bureau review | Permit status: Not reqd | Completion date: September 11, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Parks bureau | Permit status: Approved | Completion date: September 23, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Issuance | Permit status: Approved | Completion date: April 14, 2016 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool/firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Permit expiration | Permit status: Corrections extended | Completion date: January 13, 2016 | Permit id: 2014-209978-000 | |||||
Terrace remodel Date: April 6, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: March 21, 2016 | Permit id: 2015-145137-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge/bar area with one new sink, relocate bank and concessions area Permit type: Application | Permit status: Approved | Completion date: July 1, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge/bar area with one new sink, relocate bank and concessions area Permit type: Application | Permit status: Approved | Completion date: July 15, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge/bar area with one new sink, relocate bank and concessions area Permit type: Issuance/intake | Permit status: Intake | Completion date: July 15, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge/bar area with one new sink, relocate bank and concessions area Permit type: Process management | Permit status: Closed | Completion date: October 22, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge/bar area with one new sink, relocate bank and concessions area Permit type: Process management | Permit status: Closed | Completion date: April 13, 2016 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge/bar area with one new sink, relocate bank and concessions area Permit type: Planning and zoning | Permit status: Not reqd | Completion date: July 1, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge/bar area with one new sink, relocate bank and concessions area Permit type: Site development | Permit status: Not reqd | Completion date: July 20, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge/bar area with one new sink, relocate bank and concessions area Permit type: Life safety | Permit status: Approved | Completion date: April 21, 2016 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge/bar area with one new sink, relocate bank and concessions area Permit type: Structural | Permit status: Approved | Completion date: July 17, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge/bar area with one new sink, relocate bank and concessions area Permit type: Fire bureau | Permit status: Approved | Completion date: July 20, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge/bar area with one new sink, relocate bank and concessions area Permit type: Transportation | Permit status: Not reqd | Completion date: July 1, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge/bar area with one new sink, relocate bank and concessions area Permit type: Water bureau review | Permit status: Approved | Completion date: July 16, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge/bar area with one new sink, relocate bank and concessions area Permit type: Parks bureau | Permit status: Approved | Completion date: July 23, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge/bar area with one new sink, relocate bank and concessions area Permit type: Permit expiration | Permit status: Corrections extended | Completion date: April 13, 2016 | Permit id: 2015-195194-000 | |||||
Remodel fourth floor; office, laundry room, restroom - hvac system design approval & permit reqd. Permit type: Application | Permit status: Approved | Completion date: April 13, 2004 | Permit id: 2004-016254-000 | |||||
Remodel fourth floor; office, laundry room, restroom - hvac system design approval & permit reqd. Permit type: Planning and zoning | Permit status: Not reqd | Completion date: April 13, 2004 | Permit id: 2004-016254-000 | |||||
Remodel fourth floor; office, laundry room, restroom - hvac system design approval & permit reqd. Permit type: Life safety | Permit status: Approved | Completion date: April 13, 2004 | Permit id: 2004-016254-000 | |||||
Remodel fourth floor; office, laundry room, restroom - hvac system design approval & permit reqd. Permit type: Structural | Permit status: Not reqd | Completion date: April 13, 2004 | Permit id: 2004-016254-000 | |||||
Remodel fourth floor; office, laundry room, restroom - hvac system design approval & permit reqd. Permit type: Fire bureau | Permit status: Approved | Completion date: April 13, 2004 | Permit id: 2004-016254-000 | |||||
Remodel fourth floor; office, laundry room, restroom - hvac system design approval & permit reqd. Permit type: Transportation | Permit status: Approved | Completion date: April 13, 2004 | Permit id: 2004-016254-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Application | Permit status: Approved | Completion date: March 4, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Issuance/intake | Permit status: Intake | Completion date: March 4, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Process management | Permit status: Closed | Completion date: April 5, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Addressing | Permit status: Not reqd | Completion date: March 7, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Planning and zoning | Permit status: Approved | Completion date: March 28, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Erosion control | Permit status: Not reqd | Completion date: March 4, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Site development | Permit status: Not reqd | Completion date: March 7, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Life safety | Permit status: Approved | Completion date: March 4, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Life safety | Permit status: Not reqd | Completion date: March 4, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Structural | Permit status: Approved | Completion date: March 11, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Fire bureau | Permit status: Approved | Completion date: March 10, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Environmental services | Permit status: Not reqd | Completion date: March 4, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Transportation | Permit status: Not reqd | Completion date: March 4, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Water bureau review | Permit status: Not reqd | Completion date: March 8, 2016 | Permit id: 2016-130628-000 | |||||
Add (3) new panel antennas at an existing unmanned wireless telecommunications facility on a rooftop Permit type: Issuance | Permit status: Approved | Completion date: April 5, 2016 | Permit id: 2016-130628-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Application | Permit status: Approved | Completion date: September 9, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Issuance/intake | Permit status: Intake | Completion date: September 9, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Process management | Permit status: Closed | Completion date: January 21, 2015 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Process management | Permit status: Closed | Completion date: March 3, 2015 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Process management | Permit status: Closed | Completion date: April 2, 2015 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Planning and zoning | Permit status: Approved | Completion date: October 9, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Planning and zoning | Permit status: Approved | Completion date: January 28, 2015 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Site development | Permit status: Not reqd | Completion date: September 17, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Structural | Permit status: Approved | Completion date: September 12, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Commercial plumbing | Permit status: Approved | Completion date: September 18, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Fire bureau | Permit status: Approved | Completion date: March 13, 2015 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Environmental services | Permit status: Approved | Completion date: September 19, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Transportation | Permit status: Approved | Completion date: September 18, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Transportation | Permit status: Approved | Completion date: September 23, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Transportation | Permit status: Closed | Completion date: September 23, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Water bureau review | Permit status: Not reqd | Completion date: September 15, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Parks bureau | Permit status: Approved | Completion date: September 23, 2014 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Permit expiration | Permit status: Extended | Completion date: August 21, 2015 | Permit id: 2014-209955-000 | |||||
Interior demo work and remodel of 7th floor to convert standard retirement living units to a residential care facility; demo and reconfigure restrooms in each unit to be accessible, demo units to create a dining room, add new nurses station and 2 new offices Permit type: Permit expiration | Permit status: Batch expired | Completion date: March 10, 2016 | Permit id: 2014-209955-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Application | Permit status: Approved | Completion date: September 9, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Issuance/intake | Permit status: Intake | Completion date: September 9, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: December 8, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: May 27, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: May 8, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: March 3, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: August 4, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: February 10, 2016 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: January 13, 2016 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: March 15, 2016 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Process management | Permit status: Closed | Completion date: April 14, 2016 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Planning and zoning | Permit status: Approved | Completion date: October 13, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Site development | Permit status: Approved | Completion date: September 22, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Life safety | Permit status: Approved | Completion date: June 8, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Structural | Permit status: Required | Completion date: March 23, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Structural | Permit status: Approved | Completion date: March 12, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Structural | Permit status: Required | Completion date: September 26, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: September 17, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Special inspections review | Permit status: Approved | Completion date: May 8, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Fire bureau | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Environmental services | Permit status: Approved | Completion date: March 31, 2016 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Transportation | Permit status: Approved | Completion date: September 18, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Transportation | Permit status: Approved | Completion date: January 29, 2015 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Transportation | Permit status: Approved | Completion date: February 14, 2016 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Water bureau review | Permit status: Not reqd | Completion date: September 11, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Parks bureau | Permit status: Approved | Completion date: September 23, 2014 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Issuance | Permit status: Approved | Completion date: April 14, 2016 | Permit id: 2014-209978-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Permit type: Permit expiration | Permit status: Corrections extended | Completion date: January 13, 2016 | Permit id: 2014-209978-000 | |||||
Install 15 lavs, 3 clothes washer, 3 tub shower, 3 toilets Date: December 16, 2014Permit type: Plumbing inspections | Permit status: Approved | Completion date: May 19, 2015 | Permit id: 2014-249820-000 | |||||
Sprinkler - relocate replace sidwalls with quick response heads on 6th floor for ti Date: June 25, 2015Permit type: Intake | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2015-191950-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge bar area with one new sink, relocate bank and concessions area Permit type: Application | Permit status: Approved | Completion date: July 1, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge bar area with one new sink, relocate bank and concessions area Permit type: Application | Permit status: Approved | Completion date: July 15, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge bar area with one new sink, relocate bank and concessions area Permit type: Issuance/intake | Permit status: Intake | Completion date: July 15, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge bar area with one new sink, relocate bank and concessions area Permit type: Process management | Permit status: Closed | Completion date: October 22, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge bar area with one new sink, relocate bank and concessions area Permit type: Process management | Permit status: Closed | Completion date: April 13, 2016 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge bar area with one new sink, relocate bank and concessions area Permit type: Planning and zoning | Permit status: Not reqd | Completion date: July 1, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge bar area with one new sink, relocate bank and concessions area Permit type: Site development | Permit status: Not reqd | Completion date: July 20, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge bar area with one new sink, relocate bank and concessions area Permit type: Life safety | Permit status: Approved | Completion date: April 21, 2016 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge bar area with one new sink, relocate bank and concessions area Permit type: Structural | Permit status: Approved | Completion date: July 17, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge bar area with one new sink, relocate bank and concessions area Permit type: Fire bureau | Permit status: Approved | Completion date: July 20, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge bar area with one new sink, relocate bank and concessions area Permit type: Transportation | Permit status: Not reqd | Completion date: July 1, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge bar area with one new sink, relocate bank and concessions area Permit type: Water bureau review | Permit status: Approved | Completion date: July 16, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge bar area with one new sink, relocate bank and concessions area Permit type: Parks bureau | Permit status: Approved | Completion date: July 23, 2015 | Permit id: 2015-195194-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge bar area with one new sink, relocate bank and concessions area Permit type: Permit expiration | Permit status: Corrections extended | Completion date: April 13, 2016 | Permit id: 2015-195194-000 | |||||
Change of occupancy on 6th flr from r-1 to sr1. 1. Ada improvements to bathrooms in rooms; convert 2 units to dining area & serving kitchen Date: November 13, 2003Client: None | Permit type: Alteration | Permit status: Final | Completion date: April 22, 2004 | Current use: Apartments/condos (3 or more units) | Permit id: 2003-156113-000 | |||||
Ti- new non rated suspended ceiling in public corridors fl 7-17. To install new sprinkler system and upgrade existing alarm system under separate permit by fire marsahlls office. Date: November 13, 2003Client: None | Permit type: Alteration | Permit status: Final | Completion date: March 12, 2004 | Current use: Apartments/condos (3 or more units) | Permit id: 2003-171209-000 | |||||
Install (2) shrouds on the north & south end of the roof, each containing antennas and equipment and install one cabinet on the north penthouse Date: January 30, 2009Client: None | Permit type: Alteration | Permit status: Final | Completion date: May 27, 2009 | Current use: Apartments/condos (3 or more units) | Permit id: 2008-180148-000 | |||||
Replace 5 antennas and add 1 antenna with related ancillary equipment Date: December 10, 2012Client: None | Permit type: Alteration | Permit status: Final | Completion date: December 12, 2012 | Current use: Utility | Permit id: 2012-176613-000 | |||||
Modifications to interior and exterior entry and facade of building; remove concrete and replace with new pavers, add additional traffic lane at entry, includes site work such as fountain, landscaping, decorative pool firepit feature, new lighting; new cosmetic facade at front of building; interior entry, reconfigure stairs, light demo and new walls, relocate front desk Date: April 26, 2016Client: None | Permit type: Alteration | Permit status: Issued | Current use: Business | Permit id: 2014-209978-000 | |||||
Interior remodel of 3rd floor dining area, light demo of hostess area, remove partition walls and create additional lounge bar area with one new sink, relocate bank and concessions area Client: None | Permit type: Alteration | Permit status: Under review | Current use: Assembly | Permit id: 2015-195194-000 | |||||
New construction of concrete pad 143" x 47" for generator Date: March 21, 2016Client: None | Permit type: New construction | Permit status: Final | Completion date: May 11, 2016 | Current use: Utility | Permit id: 2016-121499-000 |