ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Building-242062 Date: March 13, 2001Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 242596 | |||||
Electrical permit Date: September 1, 2004Permit status: Issued | Current use: Miscellaneous structure | Permit id: 356955 | |||||
Install 4 amp disconnect and transfer switch ahead of existing (2) 2 amp panels / site 14 b Date: August 22, 2002Permit type: Electrical permit | Permit status: Finaled | Current use: Assembly building | Permit id: 285938 | |||||
Temp wiring for fair Date: June 20, 2003Permit type: Electrical permit | Permit status: Issued | Current use: Commercial miscellaneous struc | Permit id: 309928 | |||||
Detached garage Date: December 1, 2003Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 326407 | |||||
Need generator inspection and permit. Date: January 14, 2014Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 660321 | |||||
Residential - porch - minor ductwork only Date: February 4, 2014Permit type: Mechanical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 662328 | |||||
Detached garage Date: April 24, 2003 Value: $35,000Permit type: Building residential permit | Permit status: Issued | Current use: Garage | Permit id: 294861 | |||||
Enclosing existing porch Date: September 13, 2000 Value: $5,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 229750 | |||||
Finished basement Date: March 6, 2001 Value: $3,880Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 242062 | |||||
Trailer Date: October 10, 2002 Value: $20,000Permit type: Building residential permit | Permit status: Issued | Current use: Trailer | Permit id: 278421 | |||||
Building residential permit Date: February 4, 2004 Value: $5,000Permit status: Finaled | Current use: Garage | Permit id: 330694 | |||||
Porch Date: September 6, 2013 Value: $20,000Permit type: Building residential permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 647822 | |||||
Reliability replace poles, remove gang switch, install transformer, cross arms, and acr to improve reliabilitin accordance with pepco plan no. 3529112. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Permit type: Public right of way | Permit status: Open | Current use: Public utility | Permit id: 355489 | |||||
>>> pre-construction meeting required >> pre-construction meeting required > pre-construction meeting required pre-construction meeting required <<< contact mc. Dps inspector charles lawson @ 301-370-3687 remove and install overhead wires and associated equipment to heavy-up existing overhead service. Pepco #5521120. Utility representative: ramel gibson @ 301-931-2834 Date: November 13, 2002Permit type: Public right of way | Permit status: Completed | Current use: Public utility | Permit id: 219345 | |||||
Relocate 200amp meter and existing overhead service underground and associated equipment in accordance with pepco plan no. 3442551. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps
|