ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 61 Interior demo only complete cosmetic remodel with the exception of: moving the staircase & vaulting the ceilings in the entry-way & living room. Well be doing new base & case, flooring, cabinets, plumbing fixtures, new can lighting, converting a tub shower into a walk-in shower. Were currently waiting for the engineered plans to be completed then well apply for all the other permits. Date: November 2, 2015 Contractor: Chancellor CirclePermit status: Inspections | Completion date: November 5, 2015 | Current use: Residential | Permit id: Bld2015-09378 | |||||
SCORE 61 New plumbing fixtures throughout home. Converting tub shower to walk-in shower. Moving one bathroom to another location in home (underground inspection needed). Date: November 9, 2015 Contractor: Ace Plumbing And Drain Cleaningchancellor CirclePermit type: Plumbing | Permit status: Inspections | Completion date: January 6, 2016 | Current use: Residential | Permit id: Bld2015-09706 | |||||
SCORE 61 Hvac only. No remodel work until bld2015-09708 is approved. Type 2 hood only allowed. Type 1 requires plan approval replacing both ac condensers. Possibly upgrading one furnace to high efficient. Moving a few duct runs. Date: November 9, 2015 Contractor: Aaa Comfort Specialistschancellor CirclePermit type: Mechanical | Permit status: Inspections | Completion date: November 10, 2015 | Current use: Residential | Permit id: Bld2015-09703 | |||||
SCORE 56 All new wire being pulled through out the home. New cans being located through out the home. Laundry moving to basement, 240v moving to basement to accommodate. Date: April 25, 2016 Contractor: Steele Electric Cochancellor CirPermit type: Electrical | Permit status: Inspections | Completion date: April 29, 2016 | Current use: Residential | Permit id: Bld2016-03882 | |||||
SCORE 59 Interior only-moving stairs, vaulting ceilings in entry & living room. New flooring through out home. New light fixtures throughout, new plumbing fixtures through out. New kitchen cabinets, new appliances, new paint. Framing as needed (see plans). Date: November 9, 2015 Contractor: Jd Redevelopment Llcchancellor CirclePermit status: Inspections | Completion date: January 6, 2016 | Current use: Residential | Permit id: Bld2015-09708 | |||||
SCORE 59 Interior only-moving stairs, vaulting ceilings in entry & living room. New flooring through out home. New light fixtures throughout, new plumbing fixtures through out. New kitchen cabinets, new appliances, new paint. Framing as needed (see plans). Date: November 9, 2015 Contractor: Jd Redevelopment, Llcchancellor CirclePermit status: Inspections | Completion date: January 6, 2016 | Current use: Residential | Permit id: Bld2015-09708 |