ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
3rd story, public hall properly repair the unsafe electric wiring condition consisting of exposed electrical wires at ceiling. Contact #(646) 286 Date: March 28, 2016Permit type: Elec | Permit id: Eg15326 | |||||
P/h. Between 1st and 2nd story :- properly secure the loosed wood tread 6th, 7th and 8th tread and risers from bottom up. Vendor scope notes: Date: November 19, 2015Permit type: Gc | Permit id: Eg07367 | |||||
Contact # martinez 347 6 4608 and pincay 646-286 0743 to gain access to building call contacts. Vacuum truck to pump out cellar throughout to Date: June 27, 2016Permit type: Stopag | Permit id: Eg20425 | |||||
P h. Between 1st and 2nd story :- properly secure the loosed wood tread 6th, 7th and 8th tread and risers from bottom up. Vendor scope notes: Date: November 19, 2015Permit type: Gc | Permit id: Eg07367 | |||||
At apt # 3l only tenant in the building. Access by appt only (tel : 718-576-9856) abate the nuisance consistin Date: September 21, 2017Permit type: Plumb | Permit id: Ei04013 | |||||
At apt. 3l, 3rd story bathroom: at the bath-wash basin, unclog waste pipe and restore to proper working order. Remove all work related debr Date: April 1, 2016Permit type: Stopag | Permit id: Eg15759 | |||||
At apt. 3l, 3rd story apt. Entrance: supply and install a new metal apartment entry door complete with frame, locks and necessary hardware. Retu Permit type: Gc | Permit id: Eg15758 | |||||
At apt. 3l, 3rd story bathroom: at the bath-wash basin, unclog waste pipe and restore to proper working order. Remove all work related debr Permit type: Plumb | Permit id: Eg15831 | |||||
At apt. 3l, 3rd story apt. Entrance: supply and install a new metal apartment entry door complete with frame, locks and necessary hardware. Retu Date: April 5, 2016Permit type: Gc | Permit id: Eg15758 | |||||
Alternative enforcement program cellar a) dismantle and legally remove & discard the existing gas boiler from premises. B) supply & install new gas Permit type: Heat | Permit id: Eh16879 | |||||
As per mini rc # 2017000146502 (new york environmental & mtrl lab) perform air sampling and analysis in accordance with hpd mini requirement contract Date: June 28, 2017Permit type: Asbest | Permit id: Eh17793 | |||||
Perform asbestos abatement pursuant to hpd rc specification and title 15, chapter 1, rules of the city of new york, new york state industrial code rul Date: May 25, 2017Permit type: Asbest | Permit id: Eh17792 | |||||
File and obtain permit disconnect and remove illegally connected boiler gas line from apt. Gas line. Supply and install new gas manifold for boi Permit type: Plumb | Permit id: Eh17370 | |||||
As per mini rc # 2017000146301 (new york environmental & mtrl lab) and hpd specification, perform polarized light microscopy (plm) analysis of 3 samp Date: May 23, 2017Permit type: Asbest | Permit id: Eh17791 | |||||
At apt. 3r, 3rd story bathroom: at the bath-sink, unclog waste pipe and restore to proper working order. Remove all work related debris. N Date: April 1, 2016Permit type: Stopag | Permit id: Eg15754 |