ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Perform total lead analysis of 12 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: December 3, 2014Permit type: Delead | Permit id: Ef11005 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: November 18, 2014Permit type: Delead | Permit id: Ef10033 | |||||
Nationalgrid provide gas to boiler/hot water heater. Date: June 12, 2015Permit type: Util | Permit id: Ef22133 | |||||
Nationalgrid provide gas to boiler hot water heater. Date: June 12, 2015Permit type: Util | Permit id: Ef22133 | |||||
As per mini rc # 2015000226601 (cardno atc), perform polarized light microscopy (plm) gravimetric matrix reduction analysis as per hpd specification o Date: October 6, 2014Permit type: Asbest | Permit id: Ef07855 | |||||
At apt. Topfl, roof above top floor apartment ----- this work order is to remove landlords alterations on the roof causing damage to roof surface Date: October 1, 2014Permit type: Gc | Permit id: Ef07146 | |||||
As per rc # 2015140311102 (b & n & k restoration, inc), perform asbestos abatement pursuant to hpd rc specification and title 15, chapter 1, rules of Date: October 6, 2014Permit type: Asbest | Permit id: Ef08033 | |||||
Apt. # 3 at bathroom: repair the defective leaky drain line leading to waste line under sink so that it will not leak. Return to proper working Date: March 16, 2017 Value: $45Permit type: Plumb | Permit id: Eh13742 | |||||
Apt # 3 at ne3 room: trace and repair the evidence of water leak at ceiling. Repair the defective broken ceiling approx. 16 sq. Ft. With sheetrock Date: March 24, 2017Permit type: Gc | Permit id: Eh13741 | |||||
Apt # 3: at kitchen: replace defective gas supply lines at apt #3. Make all necessary repairs to supply lines, pressure test lines to ensure t Date: April 19, 2017Permit type: Plumb | Permit id: Eh13794 | |||||
Perform asbestos abatement pursuant to hpd rc specification and title 15, chapter 1, rules of the city of new york, new york state industrial code rul Date: April 27, 2017Permit type: Asbest | Permit id: Eh15993 | |||||
As per mini rc # 2017000146301 (new york environmental & mtrl lab) and hpd specification, perform polarized light microscopy (plm) analysis of 3 samp Date: May 2, 2017Permit type: Asbest | Permit id: Eh15992 | |||||
As per mini rc # 2014000135301 (new york environmental & mtrl lab) perform project monitoring, air sampling and analysis in accordance with hpd mini r Date: May 23, 2017Permit type: Asbest | Permit id: Eh15994 | |||||
Supply and install new gas line from meter in basement to stove location of apt #3. File for all necessary permits so as to obtain gas authorization f Permit type: Plumb | Permit id: Eh15505 |