ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Building residential permit Date: May 7, 2007 Value: $29,000Permit status: Finaled | Current use: Single family dwelling | Permit id: 452657 | |||||
Building permit# 392131 Date: October 11, 2006Permit type: Mechanical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 435701 | |||||
Cash bond tracking # ps6a24740 Date: November 19, 2007Permit type: Demolition or move permit | Permit status: Completed | Current use: Single family dwelling | Permit id: 392138 | |||||
Per applicant- heat pump & furnace Date: November 19, 2014Permit type: Mechanical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 695212 | |||||
Construction entrance: construct temporary stabilized construction entrance (s) and subject to the conditions as noted below. Proper precautions must be taken to keep the roadways free of mud, debris or other obstructions. Prior to release of this permit, the temporary entrance will be removed and complete repair shall be made of any and all damages done to the existing improvements in the public right of way. Dw permit: construct the following type driveway in accordance with montgomery county standards and specifications and the direction of the dps inspector. All future maintenance of this apron will be the responsibility of the property owner. Mcdot standard: mc 301. 03 Date: August 8, 2005Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 238794 | |||||
Place, splice and test aerial/buried fiber optic cable facilities buried under dufif mill rd in accordance with verizon plan no. 8a16492 customer ordered fios. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps
|