Building Permits at 1368 Kenyon St Nw 1368 And 1, Washington, DC 20010


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 1368 Kenyon St Nw 1368 And 1, Washington, DC 20010 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
56
Two soil test boring will be drilled using 2. 25-inch continuous hollow stem flight augers. The borings will extend to a maximum depth of feet below current site grade. The samples will be containerized in glass jars for geotechnical classification and laboratory testing. The boring will be left open for a period of 24 hours to collect groundwater information. Pvc pipe will be inserted into the holes at the completion of drilling. The pvc pipe will be capped to prevent runoff from entering the bore hole. After groundwater reading the borehole will be grouted with bentonite slurry 2 lbs of bentonite to 1 gallon of water and the auger cuttings and all other investigation derived waste id will be containerized in sealed drums as per ddoe permit.
Date:  October 13, 2016

Client: Na Na | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600376
2016/10/130561368 Kenyon St Nw 1368 And 1, Washington, Dc 20010Na Na; Dmy Engineering Consultants Inc
SCORE
56
Two soil test boring will be drilled using 2. 25-inch continuous hollow stem flight augers. The borings will extend to a maximum depth of feet below current site grade. The samples will be containerized in glass jars for geotechnical classification and laboratory testing. The boring will be left open for a period of 24 hours to collect groundwater information. Pvc pipe will be inserted into the holes at the completion of drilling. The pvc pipe will be capped to prevent runoff from entering the bore hole. After groundwater reading the borehole will be grouted with bentonite slurry 2 lbs of bentonite to 1 gallon of water and the auger cuttings and all other investigation derived waste id will be containerized in sealed drums as per ddoe permit.
Date:  October 13, 2016

Client: Na Na | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600376
2016/10/130561368 Kenyon St Nw 1368 And 1, Washington, Dc 20010Na Na; Dmy Engineering Consultants, Inc
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.