ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: February 10, 2009Permit type: Delead | Permit id: E926473 | |||||
Perform total lead analysis of 11 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: February 6, 2009Permit type: Delead | Permit id: E926033 | |||||
Erp doh lead violation: attached scope of work thoroughly remove all lead violations as per new york city health order to abate nuisance, order #2008 Date: January 21, 2009Permit type: Delead | Permit id: E923383 | |||||
Public area bulkhead: flash around skylight and repair roof over bulkhead aprox sf with 90lb capsheet remove all work related debris not Date: April 1, 2010Permit type: Gc | Permit id: Ea30747 | |||||
Public hall ways and basement-at basement stairs replace no. 2and . 4 wood treads up from bottom. At ceiling replace fire retardant shee Date: July 26, 2011Permit type: Gc | Permit id: Ec03072 | |||||
At stairs between basement and 1s/t floor install one. Light fixture at the time of this invitation to bid, it is not anticipated that thi Date: July 21, 2011 Value: $64Permit type: Elec | Permit id: Ec03076 | |||||
1-st floor public hall way cap off radiator steam riser at the time of this invitation to bid, it is not anticipated that this work will dist Date: July 21, 2011 Value: $11Permit type: Heat | Permit id: Ec03062 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: December 6, 2010 Value: $147Permit type: Delead | Permit id: Eb16614 | |||||
Installed 1 windowguard in bedroom Date: October 18, 2010 Value: $112Permit type: Gc | Permit id: Eb12628 | |||||
Apartment # 3r. Install new w/g as follows. Bedroom install# 1 w/g complete . Bathroom install# 1 w/g complete. Living- room install window stops. Date: May 20, 2010 Value: $16Permit type: Gc | Permit id: Ea36455 | |||||
Install bathroom w/g Date: December 16, 2009 Value: $50Permit type: Gc | Permit id: Ea19776 | |||||
Install bathroom w g Date: December 16, 2009 Value: $50Permit type: Gc | Permit id: Ea19776 | |||||
Apartment # 3r. Install new w g as follows. Bedroom install# 1 w g complete . Bathroom install# 1 w g complete. Living- room install window stops. Date: May 20, 2010 Value: $16Permit type: Gc | Permit id: Ea36455 | |||||
At stairs between basement and 1s t floor install one. Light fixture at the time of this invitation to bid, it is not anticipated that thi Date: July 21, 2011 Value: $64Permit type: Elec | Permit id: Ec03076 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: June 23, 2010Permit type: Delead | Permit id: Eb00284 | |||||
Perform total lead analysis of 09 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: June 25, 2010Permit type: Delead | Permit id: Eb00743 | |||||
Apartment # 3r bathroom. D Date: May 17, 2010Permit type: Gc | Permit id: Ea34455 | |||||
Apt. No-3r kitchen-supply and install new thermal replacment window unit complete. Vendor scope notes:vendor scope notes: note: con Date: July 25, 2011Permit type: Gc | Permit id: Ec02966 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: June 7, 2010Permit type: Delead | Permit id: Ea37920 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: June 23, 2010Permit type: Delead | Permit id: Eb00446 | |||||
At apt # 3r trace and repair source of water leak at bedroom ceiling from roof. At bedroom ceiling remove mold approx. 24 sq. Ft. Using 50: bleach t Date: October 28, 2010Permit type: Gc | Permit id: Eb13238 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: November 23, 2009Permit type: Delead | Permit id: Ea17217 | |||||
(apt#2-l) install (3) window guards complete. (3) throughout the entire apartment. Remove all work related debris. Rc# ka00794 note: cont Date: October 7, 2009Permit type: Gc | Permit id: Ea12194 | |||||
Repair with similar material the broken unkeyed sheetrock ceilling in the bathroom. Sft apt #2l-compound and paint. Remove all work related deb Date: October 27, 2009Permit type: Gc | Permit id: Ea13358 | |||||
At apt#2l. Trace and repair all concealled water leaks from above, affeting apt#2l bathroom,demo and replace all defective bathroom ceiling ,walls. App Date: November 17, 2010Permit type: Gc | Permit id: Eb14443 | |||||
Nationalgrid provide gas to boiler/hot water heater Date: October 25, 2010Permit type: Util | Permit id: Eb13431 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: October 28, 2009Permit type: Delead | Permit id: Ea14169 | |||||
Apt ( 2l ) trace and repair leak from above effecting bathroom,kitchen and private hall. Repair ceiling at bathroom approx. 32 sq. Ft.,at kitchen 16 Date: April 6, 2010Permit type: Gc | Permit id: Ea31016 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: November 25, 2009Permit type: Delead | Permit id: Ea17400 | |||||
Nationalgrid provide gas to boiler hot water heater Date: October 25, 2010Permit type: Util | Permit id: Eb13431 |