ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 99 Staging of materials for and construction, excavation and removal of existing lead and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard. Period of occupancy for construction of service line will not exceed 2 days. All excavation operations shall comply with district department of transportation standard specifications for highways and structures sections 207 and 611. All work shall be conducted so as to avoid injury to tree trunks, branches, and roots. Excavations within limits of tree root spread shall proceed with care either by use of hand tools or with equipment that will not cause tree root damage. If there are any tree conflicts on this job site permit holder must suspend all work that contributes to the conflict and immediately notify the urban forestry administration at 202 671 5133 to receive clearance to continue conflicting work. Date: October 16, 2012 Contractor: Corinthian Contractors IncPermit type: Excavation; repair water service lateral | Permit status: Permit expired | Expiration date: January 31, 2013 | Permit id: Pa76160 | |||||
SCORE 100 Construction staging area Date: November 30, 2012 Contractor: DcwaterPermit status: Expired | Expiration date: December 31, 2012 | Permit id: Pa10080371 | |||||
SCORE 59 Roll off debris container Date: June 12, 2012 Contractor: Bardia SassanpourPermit status: Expired | Expiration date: June 17, 2012 | Permit id: Pa10062457 | |||||
SCORE 99 Excavation; repair water service lateral Date: November 30, 2012 Contractor: Corinthian Contractors IncPermit status: 8 | Expiration date: January 31, 2013 | Permit id: Pa76160 | |||||
SCORE 100 Staging of materials for and construction, excavation and removal of existing lead and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard. Period of occupancy for construction of service line will not exceed 2 days. All excavation operations shall comply with district department of transportation standard specifications for highways and structures sections 207 and 611. All work shall be conducted so as to avoid injury to tree trunks, branches, and roots. Excavations within limits of tree root spread shall proceed with care either by use of hand tools or with equipment that will not cause tree root damage. If there are any tree conflicts on this job site permit holder must suspend all work that contributes to the conflict and immediately notify the urban forestry administration at 202 671 5133 to receive clearance to continue conflicting work. Date: November 30, 2012 Contractor: Dcwater OpsPermit status: Permit expired | Expiration date: January 31, 2013 | Permit id: Pa76160 |