ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: October 12, 2010Permit status: Finaled | Current use: Single family dwelling | Permit id: 551430 | |||||
Majid residence pv system - ap #633313 7. 105kw system, 29 modules w/ microinverters, accumulater w/ & 15amp breaker, 35amp breaker in 200amp mcb panel Date: May 15, 2013Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 634986 | |||||
Solar panel Date: May 15, 2013 Value: $37,618Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 633313 | |||||
Repair sewer manholein accordance with wssc plans. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: November 12, 2015Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 346483 | |||||
Linesewer mainin accordance with wssc plans. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: November 10, 2015Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 346386 |