ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Roof mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 1 total system size in kilowatts: 12. 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: May 31, 2012Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: July 17, 2012 | Permit id: Pds2012-1031-20 | |||||
Sfd re-roof - remove comp and replace with 30 s. F. Comp your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: April 19, 2012 Value: $4,500Permit type: Other : 33 - res - m | Permit status: Permit finaled | Completion date: July 12, 2012 | Permit id: Pds2012-1030-20 | |||||
Roof mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 12. 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: May 31, 2012Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 17, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 Roof mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 12. 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: May 31, 2012 Contractor: N B Baker Electric IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: July 17, 2012 | Permit id: Pds2012-1031-20 | |||||
Final Date: July 12, 2012Permit status: Pass | Permit id: Pds2012-1031-20 |