ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Date: April 28, 2011Permit id: 11-04-095 | Parcel: 008140075000 | |||||
SCORE 59 Date: September 29, 2011 Contractor: Holland Fire And LandscapingPermit id: 11-09-102 | Parcel: 008140075000 | |||||
Date: November 1, 2002Permit id: 92-1099 | |||||
Replace a utility box at the corner of jefferson and triangle. The incorrect box was installed during the yolo county f o project. All work within the right-of-way shall be constructed per state and federal accessibility standards. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk, tree or landscape will be repaired to normal conditio Date: March 6, 2013Permit id: 13-0087 | Parcel: 008140075000 | |||||
Onsite permit to replace a sewer line. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Date: February 24, 2009Permit id: 09-0066 | Parcel: 008140075000 | |||||
SCORE 65 Parking lot improvements. Site work only Date: June 3, 2011 Contractor: James Cameron ConstructionPermit id: 11-0123 | Parcel: 008140075000 | |||||
Installation of new atm drive thru. Grading and site inprovements which include: ac pavement, concrete pad in front of new trash enclosure, irrigation and landscaping. 2. All work within the right-of-way shall be constructed per state and federal accessibility standards. 3. A preconstruction meeting is required call (916) 617-4692. 4. All work shall comply with city standards and details. 5. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk, tre Date: May 9, 2011Permit id: 11-0094 | Parcel: 008140075000 | |||||
SCORE 65 Replace ss service relocate ss in bldg upgrade water supply to 1 1 2" from backflow to bldg(chase) 2. All work within the right-of-way shall be constructed per state and federal accessibility standards. 3. A preconstruction meeting is required call (916) 617-4692. 4. All work shall comply with city standards and details. 5. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk, tree or landscape will be repaired to normal condition or better. Date: June 20, 2011 Contractor: James Cameron ConstructionPermit id: 11-0139 | Parcel: 008140075000 | |||||
Installation of yolo county conduit along jefferson bl. From north of michigan to west capitol blvd. Date: June 19, 2012Permit id: 12-0158 | Parcel: 008140075000 |