SCORE 99 Please upload construction documents to project dox for plan review. Install new 10x11 ground space with new 10x11 steel platform, install (1) new auxiliary hybrid cables, install (3) new sprint antennas, install (3) new rrus, install new dsss2006a 25 filter, install (1) new sprint gps antenna, install (4) equipment cabinets, move existing microwave modems from existing clearwire cabinet to new sprint aux. Cabinet and re-route existing microwave coax cables to aux. Cabinet, remove existing clearwire site including steel platform. Date: August 25, 2015 Contractor: Sac Wireless Permit type: Permit | Permit status: Applicant info required | Completion date: August 25, 2015 | Current use: Commercial | Permit id: Bld2015-06793 | |||||
SCORE 97 In order to be compliant with fcc mandates for back-up power supply, att is proposing to install a permanent diesel generator at this location. The generator will provide approximately 8 hours of power during power outages. The generator will only operate during times of power outages, other than a cycle period from time to time, to confirm it is operating properly. Drawings are attached. Date: December 12, 2014 Contractor: General Dynamics Permit type: Electrical | Permit status: Accepted | Completion date: December 12, 2014 | Current use: Commercial | Permit id: Bld2014-09095 | |||||
SCORE 97 In order to be compliant with fcc mandates for back-up power supply, att is proposing to install a permanent diesel generator at this location. The generator will provide approximately 8 hours of power during power outages. The generator will only operate during times of power outages, other than a cycle period from time to time, to confirm it is operating properly. Drawings are attached. Date: May 20, 2014 Contractor: General Dynamics Permit type: Permit | Permit status: Completed | Completion date: December 12, 2014 | Current use: Commercial | Permit id: Bld2014-03419 | |||||
In order to be compliant with fcc mandates for back-up power supply, att is proposing to install a permanent diesel generator at this location. The generator will provide approximately 8 hours of power during power outages. The generator will only operate during times of power outages, other than a cycle period from time to time, to confirm it is operating properly. Drawings are attached. Date: December 12, 2014 Permit type: Electrical | Permit status: Completed | Completion date: December 12, 2014 | Current use: Commercial | Permit id: Bld2014-09095 | |||||
Sirius xm proposes to modify their existing site by replacing (1) panel antenna and adding (1) new panel antenna as well as (1) new satellite dish. Also replacing (1) equipment cabinet within existing equipment shelter on roof. (an expedited review is requested.) Date: October 22, 2014 Permit type: Permit | Permit status: Pass | Completion date: February 13, 2015 | Current use: Commercial | Permit id: Bld2014-07717 | |||||
In order to be compliant with fcc mandates for back-up power supply, att is proposing to install a permanent diesel generator at this location. The generator will provide approximately 8 hours of power during power outages. The generator will only operate during times of power outages, other than a cycle period from time to time, to confirm it is operating properly. Drawings are attached. Date: May 20, 2014 Permit type: Permit | Permit status: Completed | Completion date: December 12, 2014 | Current use: Commercial | Permit id: Bld2014-03419 | |||||
Fire alarm 3rd and 11th floors Date: January 16, 2013 Permit type: Low voltage | Permit status: Pass | Completion date: March 19, 2013 | Current use: Commercial | Permit id: Bld2013-00290 | |||||
SCORE 64 Fire department approval required. May not displace required parking. Date: August 30, 2012 Contractor: Diamond Rentalfriendship Manor Permit type: Temporary use | Permit status: Closed | Completion date: August 30, 2012 | Permit id: Bld2012-06445 | |||||
Replace antennas on existing upper penthouse support structure & not to exceed 8 above the roof of the upper penthouse roof d. D. Rmf-45 zone k. B. D. W. Date: July 17, 2012 Permit type: Permit | Permit status: Pass | Completion date: June 5, 2013 | Current use: Commercial | Permit id: Bld2012-05160 | |||||
Installation of 3 boilers. Date: December 19, 2011 Permit type: Mechanical | Permit status: Pass | Completion date: January 27, 2012 | Current use: Commercial | Permit id: Bld2011-08306 | |||||
SCORE 64 Elec work for wall mounted antennas. Date: January 15, 2010 Contractor: Sisam Electric Incclearwire Wireless Permit type: Electrical | Permit status: No certificate req | Completion date: August 5, 2011 | Current use: Commercial | Permit id: Bld2010-00217 | |||||
Wall mounted antennas. Must meet conditions of 21a. 40. 090. E. 5. Paint to match bldg. Rmf-75 zone. Date: January 15, 2010 Permit type: Permit | Permit status: Pass | Completion date: October 27, 2010 | Current use: Commercial | Permit id: Bld2010-00216 | |||||
SCORE 64 Modifications and upgrades to existing wall mount cell site (change in co). No changes to location or size authorized. Date: July 6, 2009 Permit type: Electrical | Permit status: Closed | Completion date: May 30, 2012 | Current use: Residential | Permit id: Bld2009-03888 | |||||
Repair exterior concrete elements, overlay all ext concrete surfaces with thordlastic coating. Repair balconies, pedestrian ways as needed. Date: June 1, 2009 Permit type: Permit | Permit status: Pass | Completion date: October 27, 2010 | Current use: Residential | Permit id: Bld2009-03154 | |||||
In order to be compliant with fcc mandates for back-up power supply, att is proposing to install a permanent diesel generator at this location. The generator will provide approximately 8 hours of power during power outages. The generator will only operate during times of power outages, other than a cycle period from time to time, to confirm it is operating properly. Drawings are attached. Date: February 12, 2016 Permit status: Closed | Current use: Commercial | Permit id: Bld2014-03419 | |||||
Please upload construction documents to project dox for plan review. Install new 10x11 ground space with new 10x11 steel platform, install (1) new auxiliary hybrid cables, install (3) new sprint antennas, install (3) new rrus, install new dsss2006a 25 filter, install (1) new sprint gps antenna, install (4) equipment cabinets, move existing microwave modems from existing clearwire cabinet to new sprint aux. Cabinet and re-route existing microwave coax cables to aux. Cabinet, remove existing clearwire site including steel platform. Date: September 3, 2015 Permit status: Void | Current use: Commercial | Permit id: Bld2015-06793 | |||||
SCORE 56 Repair exterior concrete elements, overlay all ext concrete surfaces with thordlastic coating. Repair balconies, pedestrian ways as needed. Date: June 1, 2009 Contractor: Bidwell Inc.Friendship Manor Permit status: Closed | Completion date: October 27, 2010 | Current use: Residential | Permit id: Bld2009-03154 | |||||
Sirius xm proposes to modify their existing site by replacing (1) panel antenna and adding (1) new panel antenna as well as (1) new satellite dish. Also replacing (1) equipment cabinet within existing equipment shelter on roof. (an expedited review is requested.) Date: February 13, 2015 Permit status: Closed | Current use: Commercial | Permit id: Bld2014-07717 | |||||
SCORE 62 Wall mounted antennas. Must meet conditions of 21a. 40. 090. E. 5. Paint to match bldg. Rmf-75 zone. Date: January 15, 2010 Contractor: Holt Services Incclearwire Wireless Permit status: Closed | Completion date: October 27, 2010 | Current use: Commercial | Permit id: Bld2010-00216 | |||||
SCORE 56 Installation of 3 boilers. Date: December 19, 2011 Contractor: 3d Sheet Metal Contractors Llcfriendship Manor Permit type: Mechanical | Permit status: Closed | Completion date: January 27, 2012 | Current use: Commercial | Permit id: Bld2011-08306 | |||||
SCORE 56 Replace antennas on existing upper penthouse support structure & not to exceed 8 above the roof of the upper penthouse roof d. D. Rmf-45 zone k. B. D. W. Date: July 17, 2012 Contractor: Larson Tower Specialists L.L.C.Friendship Manor Permit status: Closed | Completion date: June 5, 2013 | Current use: Commercial | Permit id: Bld2012-05160 | |||||
Fire alarm 3rd and 11th floors Date: January 16, 2013 Permit type: Low voltage | Permit status: Closed | Completion date: March 19, 2013 | Current use: Commercial | Permit id: Bld2013-00290 | |||||
In order to be compliant with fcc mandates for back-up power supply, att is proposing to install a permanent diesel generator at this location. The generator will provide approximately 8 hours of power during power outages. The generator will only operate during times of power outages, other than a cycle period from time to time, to confirm it is operating properly. Drawings are attached. Date: May 20, 2014 Permit status: Inspections | Completion date: December 12, 2014 | Current use: Commercial | Permit id: Bld2014-03419 | |||||
Sirius xm proposes to modify their existing site by replacing (1) panel antenna and adding (1) new panel antenna as well as (1) new satellite dish. Also replacing (1) equipment cabinet within existing equipment shelter on roof. (an expedited review is requested.) Date: October 22, 2014 Permit status: Closed | Completion date: February 13, 2015 | Current use: Commercial | Permit id: Bld2014-07717 | |||||
In order to be compliant with fcc mandates for back-up power supply, att is proposing to install a permanent diesel generator at this location. The generator will provide approximately 8 hours of power during power outages. The generator will only operate during times of power outages, other than a cycle period from time to time, to confirm it is operating properly. Drawings are attached. Date: December 12, 2014 Permit type: Electrical | Permit status: Inspections | Completion date: December 12, 2014 | Current use: Commercial | Permit id: Bld2014-09095 | |||||
SCORE 59 Repair exterior concrete elements, overlay all ext concrete surfaces with thordlastic coating. Repair balconies, pedestrian ways as needed. Date: June 1, 2009 Contractor: Bidwell, Inc.Friendship Manor Permit status: Closed | Completion date: October 27, 2010 | Current use: Residential | Permit id: Bld2009-03154 | |||||
SCORE 64 Modifications and upgrades to existing wall mount cell site (change in co). No changes to location or size authorized. Date: July 6, 2009 Permit type: Electrical | Permit status: Closed | Completion date: May 30, 2012 | Current use: Residential | Permit id: Bld2009-03888 | |||||
SCORE 67 Wall mounted antennas. Must meet conditions of 21a. 40. 090. E. 5. Paint to match bldg. Rmf-75 zone. Date: January 15, 2010 Contractor: Holt Services, Incclearwire Wireless Permit status: Closed | Completion date: October 27, 2010 | Current use: Commercial | Permit id: Bld2010-00216 | |||||
SCORE 64 Elec work for wall mounted antennas. Date: January 15, 2010 Contractor: Sisam Electric Incclearwire Wireless Permit type: Electrical | Permit status: Closed | Completion date: August 5, 2011 | Current use: Commercial | Permit id: Bld2010-00217 | |||||
SCORE 59 Installation of 3 boilers. Date: December 19, 2011 Contractor: 3d Sheet Metal Contractors, Llcfriendship Manor Permit type: Mechanical | Permit status: Closed | Completion date: January 27, 2012 | Current use: Commercial | Permit id: Bld2011-08306 | |||||
SCORE 59 Replace antennas on existing upper penthouse support structure & not to exceed 8 above the roof of the upper penthouse roof d. D. Rmf-45 zone k. B. D. W. Date: July 17, 2012 Contractor: Larson Tower Specialists, L.L.C.Friendship Manor Permit status: Closed | Completion date: June 5, 2013 | Current use: Commercial | Permit id: Bld2012-05160 | |||||
SCORE 64 Fire department approval required. May not displace required parking. Date: August 30, 2012 Contractor: Diamond Rentalfriendship Manor Permit type: Temporary use | Permit status: Closed | Completion date: August 30, 2012 | Permit id: Bld2012-06445 | |||||
SCORE 59 Fire alarm 3rd and 11th floors Date: January 16, 2013 Permit type: Low voltage | Permit status: Closed | Completion date: March 19, 2013 | Current use: Commercial | Permit id: Bld2013-00290 | |||||
SCORE 64 In order to be compliant with fcc mandates for back-up power supply, att is proposing to install a permanent diesel generator at this location. The generator will provide approximately 8 hours of power during power outages. The generator will only operate during times of power outages, other than a cycle period from time to time, to confirm it is operating properly. Drawings are attached. Date: May 20, 2014 Permit status: Inspections | Completion date: December 12, 2014 | Current use: Commercial | Permit id: Bld2014-03419 | |||||
SCORE 59 Sirius xm proposes to modify their existing site by replacing (1) panel antenna and adding (1) new panel antenna as well as (1) new satellite dish. Also replacing (1) equipment cabinet within existing equipment shelter on roof. (an expedited review is requested.) Date: October 22, 2014 Contractor: Westower Communications Inc.Sirius Xm Scl_5301 Permit status: Closed | Completion date: February 13, 2015 | Current use: Commercial | Permit id: Bld2014-07717 | |||||
SCORE 64 In order to be compliant with fcc mandates for back-up power supply, att is proposing to install a permanent diesel generator at this location. The generator will provide approximately 8 hours of power during power outages. The generator will only operate during times of power outages, other than a cycle period from time to time, to confirm it is operating properly. Drawings are attached. Date: December 12, 2014 Permit type: Electrical | Permit status: Inspections | Completion date: December 12, 2014 | Current use: Commercial | Permit id: Bld2014-09095 |