Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 64 13 E 5 S, Salt Lake City, Ut, 841023249 In order to be compliant with fcc mandates for back-up power supply, att is proposing to install a permanent diesel generator at this location. The generator will provide approximately 8 hours of power during power outages. The generator will only operate during times of power outages, other than a cycle period from time to time, to confirm it is operating properly. Drawings are attached. Date: May 20, 2014 Permit status: Completed | Completion date: December 12, 2014 | Current use: Commercial | Permit id: Bld2014-03419 | |||||
SCORE 64 13 E 5 S, Salt Lake City, Ut, 841023249 In order to be compliant with fcc mandates for back-up power supply, att is proposing to install a permanent diesel generator at this location. The generator will provide approximately 8 hours of power during power outages. The generator will only operate during times of power outages, other than a cycle period from time to time, to confirm it is operating properly. Drawings are attached. Date: December 12, 2014 Permit type: Electrical | Permit status: In progress | Completion date: December 12, 2014 | Current use: Commercial | Permit id: Bld2014-09095 | |||||
SCORE 64 13 E 5 S Salt Lake City, Ut 841023249 In order to be compliant with fcc mandates for back-up power supply, att is proposing to install a permanent diesel generator at this location. The generator will provide approximately 8 hours of power during power outages. The generator will only operate during times of power outages, other than a cycle period from time to time, to confirm it is operating properly. Drawings are attached. Date: May 20, 2014 Permit status: Inspections | Completion date: December 12, 2014 | Current use: Commercial | Permit id: Bld2014-03419 | |||||
SCORE 64 13 E 5 S Salt Lake City, Ut 841023249 In order to be compliant with fcc mandates for back-up power supply, att is proposing to install a permanent diesel generator at this location. The generator will provide approximately 8 hours of power during power outages. The generator will only operate during times of power outages, other than a cycle period from time to time, to confirm it is operating properly. Drawings are attached. Date: December 12, 2014 Permit type: Electrical | Permit status: Inspections | Completion date: December 12, 2014 | Current use: Commercial | Permit id: Bld2014-09095 |