| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Storm drain/paving construct storm drains in accordance with montgomery county standards and specifications and approved plans. Prior to placement of any curb & gutter or pavement all utility crossings must be certified as being in place. Construct concrete sidewalk, concrete curb and gutter, driveway aprons, sidewalk and street paving as per approved montgomery county standards and specifications and approved plans. Install bus shelter, make traffic and signalization improvement per the approved traffic control plan. East gude dr. From sta # 76+89. 23 to sta#82+30; southlawn la. From sta#28+99. 88 to sta#32+15 Date: September 28, 2006Permit type: Public right of way | Permit status: Completed | Current use: Paving and storm drain | Permit id: 249033 | |||||
On east gude drive (house #1298) remove anchor, downguy, iinstall pole, three transformers, transfer wire and associated equipment in accordance with pepco plan no. 3154076. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector richard long at 301-370-3709 before and after installation. Date: December 4, 2006Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 250116 |