ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Impairment shall be coordinated with building management so that only one floor is impaired at any given time Date: November 5, 2012Permit status: Na | Permit id: Sprk195653 | |||||
Installation of floo Date: May 13, 2015Permit status: Na | Permit id: Chm468282 | |||||
Relocate 228 sprinklers in coordination with new ceiling work in 1st floor Date: February 11, 2014Permit status: Na | Permit id: Sprk323587 | |||||
Burning &; welding of existing steel platform (dpl) Date: November 15, 2010Permit status: Na | Permit id: Cbw50965 | |||||
Installation of inte Date: June 10, 2014Permit status: Na | Permit id: Chm365057 | |||||
Burning &; welding to replace old condenser water pumps &; associated valves &; systmes with new condenser (dpl); bfd paid detail required Date: February 22, 2010Permit status: Na | Permit id: Cbw15193 | |||||
Replacement of the existing digital communicator with an aes radio communicator.;per nfpa stands. Installer to remain on site during entire cut over and report any alarm signals. While;communicator impaired.; ~; doc# 20131264 Date: November 21, 2013Permit status: Na | Permit id: Bfdf299303 | |||||
; duplicate of; sprk195653 impairment shall be coordinated with building management so that only;1200;sf of the 3rd floor;is impaired at any given time Date: June 28, 2013Permit status: Na | Permit id: Sprk194989 | |||||
Cutting a 18inch x18 inch hole in side of generator housing Date: September 10, 2015Permit status: Na | Permit id: Cbw503889 | |||||
Demo 1st floor rite-aid space for new offices for bostons childrens hospital.; new temporary heat detector loop to be in place during during this phase.;no occupancy in;zone. Area to be separated by;rated;/ smoke tight construction barriers.~; doc# 20131562 Date: February 7, 2014Permit status: Na | Permit id: Bfdf315074 | |||||
Bagging of smoke detectors Date: June 25, 2015Permit status: Na | Permit id: Bsd486867 | |||||
Installation of upho Date: February 15, 2013Permit status: Na | Current use: Comm | Permit id: Chm220902 | |||||
Installation of upho Date: June 13, 2014Permit status: Na | Permit id: Chm370983 | |||||
Demo/renovations of existing space to include drywall ceiling paint &; flooring Date: December 27, 2013Permit status: Na | Permit id: Fdc313698 | |||||
Burning &; welding of various lengths &; pieces of metal piping for chilled water lines &; angle iron;(dpl) bfd paid detail required Date: May 14, 2010Permit status: Na | Permit id: Cbw24565 |