ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 95 Installation of a flush mount 4. 41 kw photovoltaic system array to be parallel to roof plane, and remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and or drawing(s) for specific information. Date: March 28, 2013 Contractor: Solarcity CorporationClient: Robert Seeger | Applicant: Solarcity Corporation | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 14, 2014 | Current use: Single family d | |||||
SCORE 95 Installation of a flush mount 4. 41 kw photovoltaic system array to be parallel to roof plane, and remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and or drawing(s) for specific information. Client: Robert Seeger | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 14, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-01343 |