ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 96 35 sq ft re-roof to sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material comp shingles proposed roofing material comp shingles manufacturer owens corning brand and model tru def color (if cool roof required) amber crrc #0890-0009 built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) n a required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: October 16, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: January 13, 2010Permit status: Pass | Permit id: Pds2009-1031-20 |