ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Roush residence pv system-ap #588716 2. 04kw system,8 modules w/mircoinverter,15amp breaker in 200amp mcb panel Date: January 25, 2012Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 588946 | |||||
Electrical permit Date: May 18, 2015Permit status: Finaled | Current use: Single family dwelling | Permit id: 712989 | |||||
Install a 2 kw 8 panel solar system on rooftop Date: January 25, 2012 Value: $24,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 588716 | |||||
Under the pavement cut moratorium until 9/17/16. A full width 2 mill and overlayis requiredper the current county specifications for utility construction permit and as directed by the dps row inspector. Replace gas service in accordance with washington gas plan no. 667203. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: September 12, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 354266 |