ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Soil boring for two monitoring wells installation. Drill soil borings within the county right of way and subject to the conditions noted below: complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting required contact mc. Dps inspector chris cary @ 301-370-3786 drill soil borings within the county right of way and subject to the conditions noted. Complete repair & restoration of the right of way shall be made, "in-kind", of any and all damages done to the existing improvements in the public right-of-way caused by construction operations on this site. All lane & sidewalk closures & other required traffic controls shall comply with the approved traffic control plan & the directions of the mc. Dps right-of-way inspector Date: December 5, 2007Permit type: Public right of way | Permit status: Finaled | Current use: Miscellaneous structure | Permit id: 254187 |