| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Alarm - fire alarm installation for new mixed use building with 26 floors of residential and retail, and 2 levels below grade parking Date: February 3, 2015Permit type: Intake | Permit status: Approved | Completion date: January 12, 2015 | Permit id: 2015-103791-000 | |||||
284 unit building. Largest unit is 12 sqft - oar 918 reduced fees apply only to residential units. Date: March 16, 2015Permit type: Intake | Permit status: Closed | Completion date: February 6, 2015 | Permit id: 2015-116197-000 | |||||
Complete plumbing installation for 26 story apartment building. Date: February 20, 2015Permit type: Intake | Permit status: Closed | Completion date: February 20, 2015 | Permit id: 2015-122447-000 | |||||
Sprinklers-add a new and complete sprinkler system in new high-rise building Date: May 1, 2015Permit type: Intake | Permit status: Approved | Completion date: February 24, 2015 | Permit id: 2015-123907-000 | |||||
Alarm-low voltage das system Date: May 27, 2015Permit type: Intake | Permit status: Approved | Completion date: March 6, 2015 | Permit id: 2015-129517-000 | |||||
Mixed use 26 story tower, 284 market rate apartments, 3,5 sf retail, 2 subgrade parking levels Date: November 25, 2014Permit type: Intake | Permit status: Approved | Completion date: May 13, 2014 | Permit id: 2013-223297-000 | |||||
Dfs 01- for post tension level 1 Date: January 28, 2015Permit type: Intake | Permit status: Approved | Completion date: November 24, 2014 | Permit id: 2013-223297-Dfs | |||||
Dfs 2- steel stairs. Stairs #1 and #4 both from p2 level to level 1. Date: February 13, 2015Permit type: Intake | Permit status: Approved | Completion date: December 9, 2014 | Permit id: 2013-223297-Dfs | |||||
Dfs 03- car stackers and equipment Date: March 2, 2015Permit type: Intake | Permit status: Approved | Completion date: December 17, 2014 | Permit id: 2013-223297-Dfs | |||||
Dfs 04- post tension level 3 Date: April 6, 2015Permit type: Intake | Permit status: Approved | Completion date: March 5, 2015 | Permit id: 2013-223297-Dfs | |||||
Dfs 05 - post tension shop drawings for level 4 Date: May 8, 2015Permit type: Intake | Permit status: Approved | Completion date: March 27, 2015 | Permit id: 2013-223297-Dfs | |||||
Dfs 06- post tension shop drawings level 5 through level 19 Date: May 8, 2015Permit type: Intake | Permit status: Approved | Completion date: April 6, 2015 | Permit id: 2013-223297-Dfs | |||||
Dfs 07- metal stairs and railings Date: May 13, 2015Permit type: Intake | Permit status: Approved | Completion date: April 8, 2015 | Permit id: 2013-223297-Dfs | |||||
Dfs 08 - window wall system Permit type: Intake | Permit status: Approved | Completion date: June 19, 2015 | Permit id: 2013-223297-Dfs | |||||
Dfs 08 - window wall system Permit type: Process management | Permit status: Closed | Completion date: June 19, 2015 | Permit id: 2013-223297-Dfs | |||||
Dfs 09 - applied fire proofing Permit type: Intake | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2013-223297-Dfs | |||||
Rev 1 - revised pile lengths Date: December 29, 2014Permit type: Intake | Permit status: Approved | Completion date: December 3, 2014 | Permit id: 2013-223297-Rev | |||||
Rev 2 - top and bottom reinforcing was added to the level p1 pt slab to the south of the placing boom block out near grids bb/32. This reinforcing was added because of a void in the pt tendons created by the block out. Date: March 4, 2015Permit type: Intake | Permit status: Approved | Completion date: January 26, 2015 | Permit id: 2013-223297-Rev | |||||
Rev 03 - finalize interiors for level 1 lobby, leasing area and mail room. Replace portion of curtain wall on level 1 with folding wall system. Finalize interior amenity spaces and exterior terrace. Revised landscaping Permit type: Intake | Permit status: Approved | Completion date: April 1, 2015 | Permit id: 2013-223297-Rev | |||||
Rev 03 - finalize interiors for level 1 lobby, leasing area and mail room. Replace portion of curtain wall on level 1 with folding wall system. Finalize interior amenity spaces and exterior terrace. Revised landscaping Permit type: Process management | Permit status: Closed | Completion date: April 1, 2015 | Permit id: 2013-223297-Rev | |||||
Rev 03 - finalize interiors for level 1 lobby, leasing area and mail room. Replace portion of curtain wall on level 1 with folding wall system. Finalize interior amenity spaces and exterior terrace. Revised landscaping Permit type: Planning and zoning | Permit status: Approved | Completion date: May 22, 2015 | Permit id: 2013-223297-Rev | |||||
Rev 03 - finalize interiors for level 1 lobby, leasing area and mail room. Replace portion of curtain wall on level 1 with folding wall system. Finalize interior amenity spaces and exterior terrace. Revised landscaping Permit type: Structural | Permit status: Approved | Completion date: April 30, 2015 | Permit id: 2013-223297-Rev | |||||
Rev 04- clarify the spacing of cold formed steel studs used to support cladding. Date: June 12, 2015Permit type: Intake | Permit status: Approved | Completion date: May 27, 2015 | Permit id: 2013-223297-Rev | |||||
Foundation permit is for parking up to, including p1 Date: August 19, 2014Permit type: Intake | Permit status: Approved | Completion date: April 16, 2014 | Permit id: 2013-223297-Str | |||||
Garage exhaust, wshps, 90 cfm mau for corridors, elevator and stair pressurization, two 160-ton cooling towers, two 1. 5mmbtuh and two 1 mmbtuh boilers, two3-t ds, gas piping, plans w/co Date: November 25, 2014Permit type: Intake | Permit status: Closed | Completion date: May 14, 2014 | Permit id: 2014-156658-000 | |||||
Duct mods only Permit type: Intake | Permit status: Closed | Completion date: April 1, 2015 | Permit id: 2014-156658-Rev | |||||
Duct mods only Permit type: Life safety | Permit status: Not reqd | Completion date: April 2, 2015 | Permit id: 2014-156658-Rev | |||||
Duct mods only Permit type: Mechanical review | Permit status: Approved | Completion date: April 2, 2015 | Permit id: 2014-156658-Rev | |||||
Install 6 of water service and (2) hose bibs Date: September 17, 2014Permit type: Intake | Permit status: Closed | Completion date: September 17, 2014 | Permit id: 2014-214016-000 | |||||
High rise residential w/(2) retail space - (13) fixtures, (1) oil/water separator, 5 of interior water piping/1,5 feet of drainage piping. Date: November 4, 2014Permit type: Intake | Permit status: Closed | Completion date: November 4, 2014 | Permit id: 2014-234152-000 | |||||
Unit low-voltage thermostat wire to heat unit Date: October 30, 2015Permit type: Intake | Permit status: Closed | Completion date: October 16, 2015 | Permit id: 2015-251793-000 | |||||
Fire alarm wiring for 26 floor mixed use apartment building4/20/2016 add 2 way communication system on each floor. No additional fees required. Per brett welland Date: October 30, 2015Permit type: Intake | Permit status: Closed | Completion date: October 16, 2015 | Permit id: 2015-251797-000 | |||||
Sanitary only: 220ft of 8 sanitary in nw overton st. Contractor to construct new 8 pvc branch to manhole (abg061-aprox 8ft deep) per cop std detail p-262 and make new tap to base of manhole. Contractor to verify location and depth. Date: November 12, 2015Permit type: Intake | Permit status: Closed | Completion date: November 12, 2015 | Permit id: 2015-263840-000 | |||||
Storm only: 100ft of 18 hdpe storm in nw overton. Contractor to construct branch to capped 12 branch in row originating from manhole (aqp016). Branch installed under ep021d, approx. 6ft at curb. Contractor to verify branch location and depth. Date: November 12, 2015Permit type: Intake | Permit status: Closed | Completion date: November 12, 2015 | Permit id: 2015-263848-000 | |||||
Sanitary connection to city system 8(2) = l. F. Date: November 12, 2015Permit type: Intake | Permit status: Closed | Completion date: November 12, 2015 | Permit id: 2015-263866-000 | |||||
Storm connection to city system (2) = 15 l. F. Date: November 12, 2015Permit type: Intake | Permit status: Closed | Completion date: November 12, 2015 | Permit id: 2015-263871-000 | |||||
Sanitary only: 259ft of8 pvc sanitary in nw 12th ave (approx. 9. 5ft deep). Contractor to construct new 8 branch to main per cop std detail p-262 and install new 8x8x8 tee fitting. Contractor to verify main location and depth. Date: November 25, 2015Permit type: Intake | Permit status: Closed | Completion date: November 25, 2015 | Permit id: 2015-270123-000 | |||||
Dfs 08 - window wall system Date: August 6, 2015Permit type: Intake | Permit status: Approved | Completion date: June 19, 2015 | Permit id: 2013-223297-Dfs | |||||
Dfs 09 - spray-applied and intumescent fire proofing Date: August 6, 2015Permit type: Intake | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2013-223297-Dfs | |||||
Aluminum storefront and curtain wall Date: December 22, 2015Permit type: Intake | Permit status: Approved | Completion date: July 21, 2015 | Permit id: 2013-223297-Dfs | |||||
Mechanical equipment seismic anchorage Date: January 27, 2016Permit type: Intake | Permit status: Approved | Completion date: November 2, 2015 | Permit id: 2013-223297-Dfs | |||||
Dfs 12 - seismic engineering for electrical system Date: September 9, 2015Permit type: Intake | Permit status: Approved | Completion date: August 3, 2015 | Permit id: 2013-223297-Dfs | |||||
Pt cables level 20-27 Date: October 1, 2015Permit type: Intake | Permit status: Approved | Completion date: September 10, 2015 | Permit id: 2013-223297-Dfs | |||||
Dfs - metal shingles and corrugated aluminum Date: November 2, 2015Permit type: Intake | Permit status: Approved | Completion date: September 28, 2015 | Permit id: 2013-223297-Dfs | |||||
Dfs 15 - steel stairs within multi-level units Date: November 9, 2015Permit type: Intake | Permit status: Approved | Completion date: September 22, 2015 | Permit id: 2013-223297-Dfs | |||||
Dfs 16 - suspended act ceiling system seismic bracing analysis and construction requirements Date: November 12, 2015Permit type: Intake | Permit status: Approved | Completion date: September 30, 2015 | Permit id: 2013-223297-Dfs | |||||
Dfs 17 - composite metal panels Date: April 15, 2016Permit type: Intake | Permit status: Approved | Completion date: November 12, 2015 | Permit id: 2013-223297-Dfs | |||||
Dfs 18- suspended wood ceiling seismic bracing analysis Date: March 2, 2016Permit type: Intake | Permit status: Approved | Completion date: December 31, 2015 | Permit id: 2013-223297-Dfs | |||||
Dfs 19 - waste compactor seismic anchorage Date: March 2, 2016Permit type: Intake | Permit status: Approved | Completion date: January 28, 2016 | Permit id: 2013-223297-Dfs | |||||
Shoring and excavation permit for 26 story high rise tower Date: June 26, 2014Permit type: Intake | Permit status: Approved | Completion date: March 5, 2014 | Permit id: 2013-223297-Exc | |||||
Rev 03 - finalize interiors for level 1 lobby, leasing area and mail room. Replace portion of curtain wall on level 1 with folding wall system. Finalize interior amenity spaces and exterior terrace. Revised landscaping Date: August 6, 2015Permit type: Intake | Permit status: Approved | Completion date: April 1, 2015 | Permit id: 2013-223297-Rev | |||||
Rev 05 - revision to fire proofing dfs - reduce fireproofing thickness for load bearing horizontal tube steel members within core Date: August 25, 2015Permit type: Intake | Permit status: Approved | Completion date: August 19, 2015 | Permit id: 2013-223297-Rev | |||||
Rev 06- shift plumbing point of connect 8 to the east to accommodate car stacker locations in parking garage. The storm lateral from the manhole in overton will be installed with two 22 1/2 degree bends due to the offset Date: March 15, 2016Permit type: Intake | Permit status: Approved | Completion date: January 6, 2016 | Permit id: 2013-223297-Rev | |||||
Duct mods only Date: August 6, 2015Permit type: Intake | Permit status: Closed | Completion date: April 1, 2015 | Permit id: 2014-156658-Rev | |||||
Fire alarm wiring for 26 floor mixed use apartment building4 20 2016 add 2 way communication system on each floor. No additional fees required. Per brett welland Date: October 30, 2015Permit type: Intake | Permit status: Closed | Completion date: October 16, 2015 | Permit id: 2015-251797-000 | |||||
Rev 06- shift plumbing point of connect 8 to the east to accommodate car stacker locations in parking garage. The storm lateral from the manhole in overton will be installed with two 22 1 2 degree bends due to the offset Date: March 15, 2016Permit type: Intake | Permit status: Approved | Completion date: January 6, 2016 | Permit id: 2013-223297-Rev | |||||
Garage exhaust, wshps, 90 cfm mau for corridors, elevator and stair pressurization, two 160-ton cooling towers, two 1. 5mmbtuh and two 1 mmbtuh boilers, two3-t ds, gas piping, plans w co Date: November 25, 2014Permit type: Intake | Permit status: Closed | Completion date: May 14, 2014 | Permit id: 2014-156658-000 |