ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Same for same Date: June 6, 2013Permit type: Mechanical permit | Permit status: Finaled | Completion date: September 3, 2013 | Current use: Single family dwelling | Permit id: 637622 | |||||
Per applicant- exact replacement Date: September 18, 2014Permit type: Mechanical permit | Permit status: Finaled | Completion date: September 29, 2014 | Current use: Single family dwelling | Permit id: 688437 | |||||
On saint james road (house #12421) heavy-up overhead service and associated equipment in accordance with pepco plan no. 53084509. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector ralph wolfe at 301-370-3692 before and after installation. Date: September 27, 2005Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 240104 | |||||
Electrical permit Date: May 21, 2013Permit status: Finaled | Current use: Single family dwelling | Permit id: 635851 | |||||
Abandongas service in accordance with washington gas plan no. 382333. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: September 24, 2014Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 322480 |