ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Installation of a 1 1/2" water house connectionin accordance with wssc plans and specifications. Work shall comply with montgomery county specifications for utility construction permit the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures and traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: March 25, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 351637 | |||||
Dw permit (residential) remove existing driveway and construct a new mc-301. 03 type driveway (same location) in accordance with montgomery county standards and specifications. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. (maryland dnr permit is required prior to remove/impact street trees. Complete tree protection and replanting per mc dps approved tree protection plan.) note: apron must be a minimum of five (5) from the utility pole on left side of the propert Date: September 27, 2016Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 354542 | |||||
Must check mcdot paving projects schedule and have preconstruction meeting with dps row inspector prior to beginning of construction. Install gas service in accordance with washington gas plan no. 172829. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county Date: June 12, 2013Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 292946 |